Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 10 11 GEETA INDUSTRIAL ESTATE NO 7 MATOSHREEE HOTEL GAURAIPADA WALIV ROAD VASAI EAST PALGHAR MAHARASHTRA 401208 | PALGHAR | MAHARASHTRA | 401208 | Admitted-Finance |
| 2 | Admitted-Finance SURVEY NO 23 1 PART 2 LAXMIPURA NANDASAN AHMEDABAD MEHSANA HIGHWAY POST NANDASAN TAL KADI MAHESANA GUJARAT 382705 | 382705 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance A WING 201 PRIME TRADE CENTRE SATIVALI ROAD VASAI EAST SATIVALI ROAD PALGHAR MAHARASHTRA 401208 | PALGHAR | MAHARASHTRA | 401208 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
4 Apr 2024, 12:00 pmClosed
Mr. L. Thavurya, GM , SCM
EIL GURUGRAM
PREFABRICATED INSTRUMENT HOOKUP
2024_EIL_798700_1
LT/B348-000-YM-MR-1780/80
Limited
Miscellaneous Goods
Supply
210 days
AS PER BIDDING DOCUMENT
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
Exempted
AS PER BIDDING DOCUMENT
19 Jun 2024
7 Mar 2024
5 Apr 2024
7 Mar 2024
4 Apr 2024
21 Mar 2024
7 Mar 2024 - 22 Mar 2024
18 Mar 2024
Design, engineering, manufacture, procurement of materials and bought out components, 3D modelling, assembly at shop, inspection, testing at manufacturer's works, packing, delivery, documentation and supply of mandatory spares as per the enclosed EIL standard specifications, instructions to vendors, job specification, data sheets etc.
GROUP: A Prefab Instrument Hook-ups upto 600# line rating Item SI. Nos. 1.0001 to 1.0162
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-PT
Prefab Hookup-FT
Prefab Hookup-FT
Prefab Hookup-PT
Astec Valves and Fittings Pvt Ltd
Fluid Controls Pvt. Ltd.
HAVI ENGINEERING INDIA PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .