Tender Value
₹5.0 Cr
EMD Value
₹5.0 L
Closing Date
26 Oct 2026, 5:00 pm
Additional chief engineer ,VN Basin, Pkd
O/o ACE VN BASIN PARALAKHEMUNDI
Road works
2026_CEBMB_142167_1
ACE,VNB-06/2026-27
National Competitive Bid
Civil Works - Roads
Percentage
330 days
Srirampur
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹5.0 L
Yes
1 Oct 2026
1 Oct 2026
27 Oct 2026
1 Oct 2026
26 Oct 2026
1 Oct 2026
1 Oct 2026 - 7 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing of grass and removal of rubbish up to a distance of 50 metres outside the area with supply of all equipments, tools and plants, labour required for the work including supervision charges and all taxes, cess, etc. but excluding GST all complete as per the direction of the Engineer-in-charge. | 32,685 | One sqm | 2.9 | ₹94,786.5 |
| 2 | Scarifying the existing bituminous road surface to a depth of 50mm and disposal of the scarified material away from work site with all leads, lifts, delifts etc. including all labour charges, T&P, hire and running charges of all machineries, Cess etc. but excluding GST ,all complete as directed by the Engineer-in-charge. | 3,952.8 | One sqm | 6.05 | ₹23,914.44 |
| 3 | Removal of B.T. surface and stacking them away from work site with all leads, lifts, delifts etc. including all labour charges, T&P, hire and running charges of all machineries, Cess etc. but excluding GST ,all complete as directed by the Engineer-in-charge. | 4,611.6 | One sqm | 18.4 | ₹84,853.44 |
| 4 | Construction of road embankment with approved earth obtained from borrow pits with all leads and lifts, transporting to site by mechanical means, spreading, grading to required slope and compacting to meet the requirement of table 300-2 and Clause 305 of MoSRT&H Specifications for Road & Bridge Works (4th Revision) with all leads, lifts & delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, Cess excluding GST etc.complete as directed by the Engineer-in-charge. (Measurement shall be taken on finished level section) | 3,054.74 | One cum | 172.3 | ₹5,26,331.36 |
| 5 | Supplying, collection good quality of moorum including conveying from stacks and spreading in sub-base in layers watering and compacting to the required density in OMC with Vibratory Roller but excluding cost and conveyance of sub base materials etc complete including royalty, cess, taxes and T&P with all leads, lifts and delifts and all labour etc required for the work complete in all respect and as per specification and as per the direction of the Engineer-in-charge | 1,266.94 | One cum | 1,733.9 | ₹21,96,742.06 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision) with all leads, lifts & delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, Cess etc. complete as directed by the Engineer-in-charge. | 4,647.87 | One cum | 3,313.3 | ₹1,53,99,790.98 |
| 7 | Cleaning the existing granular base surface including removal of binding materials and other foreign materials with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous and disposal of the scarified material away from work site with all leads, lifts, delifts etc. including all labour charges, T&P, hire and running charges of all machineries, Cess etc. complete as directed by the Engineer-in-charge. | 30,513.75 | One sqm | 23.3 | ₹7,10,970.38 |
| 8 | Providing and applying primer coat with bitumen emulsion(SS-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.60 Kg/sqm using mechanical means as per Clause 502 of MoSRT&H Specifications for Road & Bridge works (4th Revision) with all leads, lifts & delifts including cost, conveyance, taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, B & O.C. Workers Welfare Cess etc. complete in all respect, but as directed by the Engineer-in-charge. | 30,513.75 | One sqm | 98.8 | ₹30,14,758.5 |
| 9 | Providing and applying tack coat using 3.0 Kg of bitumen Emulsion (RS-1) for 10 Sqm on prepared surface of granular base including cleaning of road surface and heating bitumen to required temperature, conveying and applying hot bitumen with all leads, lifts and delifts including cost, conveyance etc. of bitumen and fuel, all labour charges, hire and running charges of tar boilers and all other T & P articles, B & O.C. Workers Cess etc. complete in all respect, but as per specification and as directed by the Engineer-in-charge. | 30,513.75 | One sqm | 40.2 | ₹12,26,652.75 |
| 10 | Providing and laying bituminious macadam (Grading-II) of19mm nominal size with hot mix plant using crushed aggregates of specified grading premixed with bituminous binder of 60/70 penetration grade of bitumen, transported to site, laid over a previously prepared surface with a hydrostatic paver finisher with sensor control to the required grade level and alignment and rolling with smooth sheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 504 of MoSRT&H Specifications for road & bridge works (4th Revision) with all leads, lifts & delifts including cost, conveyance, royalty, EMF, DMF & Additional Charges taxes etc. of all materials, all labour charges, T&P, hire and running charges of all machineries, B & O.C. Workers Welfare Cess etc. complete in all respect, but as directed by the Engineer-in-charge. | 1,525.69 | One cum | 10,666.61 | ₹1,62,73,908.21 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_611618.xls
BOQ • 0.35 MB
DTCNSRIRAMPUR.pdf
Tender Documents • 6.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .