| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | Rejected-Technical Reject |
| 3 | Rejected-Technical 2ND FLOOR GANESH MARKET BEHARBARI CHARIALI GUWAHATI ASSAM | DHUBRI | ASSAM | 783371 | - | - | Rejected-Technical Reject |
| Sl No | Description | Qty | Unit | ENVIRON SOLUTIONS L1 |
|---|---|---|---|---|
| 1.00 | Construction of Shed for Composting plant and MRF (20.00m x 30.00m) Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil | 30.42 | cum | 205.42 ₹6,248.88 Lowest |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 21.1 | cum | 253.95 ₹5,358.35 Lowest |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.29 | cum | 6,833 ₹36,146.57 Lowest |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 38.4 | sqm | 307.95 ₹11,825.28 Lowest |
| 5.00 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 132.8 | sqm | 608.35 ₹80,788.88 Lowest |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources) | 30.82 | cum | 6,833 ₹2,10,565.73 Lowest |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 1,225.76 | kg | 95 ₹1,16,447.39 Lowest |
| 8.00 | Above Plinth Level
Centering and shuttering including strutting, propping etc. and removal of form for
Columns, Pillars, Piers, Abutments, Posts and Struts | 5.76 | sqm | 307.95 ₹1,773.79 Lowest |
| 9.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.58 | cum | 10,185.05 ₹5,866.59 Lowest |
| 10.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 25.42 | kg | 95 ₹2,415.09 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
28 Feb 2024, 4:00 pmClosed
Chairmen BMB
BMB
To Select an Agency for Establishment Commissioning of Material Recovery Facility (MRF) Waste to Compost Plant (W2C) at BARPETA, ASSAM
2024_UDD_36571_1
Re-Request for Proposal (RFP)
Open Tender
Civil Works
Works
180 days
BMB
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
Yes
₹1.6 L
Yes
16 Mar 2024
23 Feb 2024
28 Feb 2024
23 Feb 2024
28 Feb 2024
23 Feb 2024
Amount
Construction of Shed for Composting plant and MRF (20.00m x 30.00m) Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size de rived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Above Plinth Level Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand)
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing and laying in position ready mixed or site batched design mixcement concrete for reinforced cement concrete work; using coarseaggregate and fine aggregate derived from natural sources, PortlandPozzolana / Ordinary Portland /Portland Slag cement, admixtures inrecommended proportions as per IS: 9103 to accelerate / retard settingof concrete, to improve durability and workability without impairingstrength; including pumping of concrete to site of laying, curing, carriagefor all leads; but excluding the cost of centering, shuttering, finishingand reinforcement as per direction of the engineer-in-charge; for thefollowing grades of concrete. Concrete of M30 grade with minimum cementcontent of 350 kg /cum
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/ m²
Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 0.63 mm thick with zinc coating not less than 275 gm/m²
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (150x150x5 mm SHS)
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Electric resistance or induction butt welded tubes (SHS-50 X 50 X 5 mm)
Detail Estimate of Construction of Shed for Windrow (12.00m x 12.00m) Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge. All Kind of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone- III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in allshapes and sizes in :Cement mortar 1:4 (1 cement : 4 coarse sand)
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.
Providing corrugated G.S. sheet roofing including vertical / curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead, including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces), excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275 gm/ m²
Providing ridges or hips of width 60 cm overall width plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limpet and bitumen washers complete. 0.63 mm thick with zinc coating not less than 275 gm/m²
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (200x200x5 mm SHS)
Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, includingwelding and bolted with special shaped washers etc. complete.Electric resistance or induction butt welded tubes
Construction of Tipping Floor (10.00m x 20.00m) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
Construction of Windrow Pad (12.00m x 12.00m) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
Separation room/chamber (15.00m X 4.00m) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)
Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
GI sheet 0.8 mm thick confirming to IS 277:1992 for bottom
Mild steel plates 2mm thick for front open lid
Welding by gas or electric plant including transportation of plant at site etc. complete.
Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete 50x37x1.50 mm
Providing and fixing ISI marked oxidised M.S. tower bolt black finish, (Barrel type) with necessary screws etc. complete : 100x10 mm
Supply, installation & Commissioning of following machines/equipments - Conveyor Belt cum Sorting Table 10m x 1m
Feed Conveyor Belt For material transportation to Windrow 5m x 1.2m
Conveyor Belt For stabilized waste material transportation to 35mm Trommel 7m x 1.2m
Shredder cum Chopper 700 Kg per hr capacity.
Trommel 35mm, 16mm, 6mm 5m x Dia. - 2m
Hydraulic Bailing Press Machine 50Tons Capacity
Miscellaneous
Annual Maintenance Cost (AMC) AMC for the Period of (5) years for the supplied technologies, machineries, tools & equipment.
Operation and Maintenance (O&M) O & M for the Period of (5) years for the entire project
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.26 MB
RFP.pdf
Tender Documents • 2.15 MB
BOQ_59818.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .