Loading…
Loading…
Tender Value
₹71.6 L
EMD Value
₹89,600
Closing Date
28 Aug 2026, 11:00 am5d left
Staff Officer Civil
GM Office, Jayant Project, Singrauli
Providing Workshop/training shed with necessary arrangement at VTC at Jayant Project
2026_NCL_363554_1
JNT/CED/26-27/15 dated 11.08.2026
Open Tender
Civil Works - Others
Percentage
120 days
Jayant Project
Please refer Tender documents
5 documents required · 5 mandatory
₹89,600
Yes
12 Aug 2026
12 Aug 2026
29 Aug 2026
12 Aug 2026
28 Aug 2026
13 Aug 2026
13 Aug 2026 - 21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Item Description/ Heading | - | - | - | - |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 81 | cum | 206.7 | ₹16,742.7 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming,consolidating and dressing complete. | 230 | cum | 1,634.25 | ₹3,75,877.5 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) | 94 | cum | 5,402.95 | ₹5,07,877.3 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size). | 25 | cum | 6,908.3 | ₹1,72,707.5 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level :Cold twisted bars | 3,700 | KG | 101.25 | ₹3,74,625 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns, etc. for mass concrete | 35 | SQM | 218 | ₹7,630 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Columns, Pillars, Piers, Abutments, Posts and Struts | 115.2 | SQM | 554.6 | ₹63,889.92 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Lintels, beams, plinth beams, girders, bressumers and cantilevers | 84 | SQM | 450.05 | ₹37,804.2 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each depositedlayer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 56 | cum | 170.25 | ₹9,534 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Tendernotice_1.pdf
PDF • 1.70 MB
BOQ_376454.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].