| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹83.1 LAccepted-AOC SECOND FLOOR SCO 5 TDI CITY SECTOR 118 MOHALI PUNJAB | ₹83.1 L | L1 | Accepted-AOC less bid |
| 2 | L2₹83.5 L+₹41,973.92 (0.51%)Rejected-AOC CHANDIGARH | ₹83.5 L+₹41,973.92 (0.51%) | L2 | Rejected-AOC more bid |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
19 Aug 2026, 11:00 amClosed
DIVISIONAL SOIL CONSERVATION OFFICER, SAS NAGAR
Soil Conservation Complex, Sector 56, SAS Nagar
Const of WHS Renovation of Pond retaing wall village khad bathlor jhandian khad rajgiri khatana gharbagga nurpurbedi
2026_DOA_173282_1
DSWC/MOH/2026-2027/08
Open Tender
Civil Works
Percentage
90 days
Ropar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.7 L
9 Sept 2026
8 Aug 2026
19 Aug 2026
8 Aug 2026
19 Aug 2026
8 Aug 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/MOH/2026-27/08
Construction of Water Recharging Str.Cum Silt Collection Str,Renovation Of Pond,Retaning wall and Stone Wire Crates in Village:- Khad-Bathlor,Jhandiana,Khad Rajgiri,Khatana(Haripur),Gharbagga(Gardolliya)Under Sub Division Nurpur Bedi Tehsil Shri Anandpur Sahib. District :-Roopnagar
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost
Quoted by Contractor (as %age less of estimated Amount) Less (-%) .
S.No. Item of Work Qty. Unit Rate Total
Work 1 For Construction: Water Recharging Str.Cum Silt Collection Str. Crate Wire Structure Project Village Khad-Rajgiri,Tehsil Shri Anandpur Sahib, Block Nurpur Bedi, District Roopnagar (PMKSY)
Estimate San.No. Dated for Rs. -
Part A. Work: Structure and Crate Wire Structure -
STONE WIRE CRATES (No.of Structure-07)
1.01 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 308 Cum 38.98
1.02 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 2159.68 Sq.m 197
1.03 Spreading of wire crates as per PWD specifications CSR 23.37 2159.68 Cum 73.71
1.04 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 668.68 Cum 1458.04
1.05 Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 418.2 Cum 222.37
Sign-Board 1 No 5000
Sub-Total 1669610
Part B. Silt Cum Water Recharging Structure works (No.of Structure:-1)
1.06 E/w in excavation of foundation 6.19 34.85 Cum 38.98
1.07 C.Conc. (gatka) In foundation in 1:8:16 6.52 Cum 3433.35
1.08 C. Conc. (bajri) in 1:2:4 4.46 Cum 5058.9
1.09 Sq rubble masonry in 1:5 in foundaion 21.79 Cum 5602.51
1.1 Sq rubble masonry in 1:5 in super structure 51.53 Cum 6089.23
1.11 12.5 mm thick Cement sand plaster in 1:4 59.62 Sq.m 213.45
1.12 Carriage of sand from quarry to dump site 30.26 Cum 222.37
1.13 Carriage of bajri from quarry to dump site 4.01 Cum 222.37
1.14 Carriage of gatka from quarry to dump site 6.52 Cum 222.37
1.15 Carriage of boulder from quarry to dump site 57 Cum 222.37
Part C Stone Masonary Water Recharging Cum Silt str. & Crate Wire Str. 02
1.16 E/w in excavation of foundation 64.36 Cum 38.98
1.17 C.Conc. (gatka) In foundation in 1:8:16 11.76 Cum 3433.35
1.18 C. Conc. (bajri) in 1:2:4 3.77 Cum 5058.9
1.19 Sq rubble masonry in 1:5 in foundaion 54.14 Cum 5602.51
1.2 Sq rubble masonry in 1:5 in super structure 89.63 Cum 6089.23
1.21 12.5 mm thick Cement sand plaster in 1:4 93.04 Sq.m 213.45
1.22 Carriage of sand from quarry to dump site 66 Cum 222.37
1.23 Carriage of bajri from quarry to dump site 3.4 Cum 222.37
1.24 Carriage of gatka from quarry to dump site 13 Cum 222.37
1.25 Carriage of boulder from quarry to dump site 158.14 Cum 222.37
1.26 E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 10 Cum 38.98
1.27 Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 42 Sq.m 197
1.28 Spreading of wire crates as per PWD specifications CSR 23.37 42 Sq.m 73.74
1.29 Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 10 Cum 1458.04
1.3 Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 10 Cum 222.37
Grand-Total A+B+C ( Work 01)
Work 02 Stone Masonary Silt Collection/Water Recharging Str.Renovation Of Pond Retaning wall and STONE WIRE CRATES works Village:-Jhandiana Kala and Khurd ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar PMKSY
Estimate San.No. Dated for Rs.
Part A. Material Cost (Stone Masonary Silt Collection and Crate wire Str.-1)
E/w in excavation of foundation 64.08 Cum 38.98
C.Conc. (gatka) In foundation in 1:8:16 20.64 Cum 3433.35
C. Conc. (bajri) in 1:2:4 52.38 Cum 5602.51
Sq rubble masonry in 1:5 in foundaion 87.06 Cum 6089.23
Sq rubble masonry in 1:5 in super structure 2.61 Cum 5058.9
12.5 mm thick Cement sand plaster in 1:4 133.21 Sq.m 213.54
Carriage of sand from quarry to dump site 50.53 Cum 156.1
Carriage of bajri from quarry to dump site 2.35 Cum 156.1
Carriage of gatka from quarry to dump site 10.8 Cum 156.1
Carriage of boulder from quarry to dump site 153.39 Cum 156.1
Grand-Total Say 972484
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 15.6 Cum 38.98
Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 78.63 Sq.m 197
Spreading of wire crates as per PWD specifications CSR 23.37 78.63 Cum 73.75
Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 26.52 Cum 1458.04
Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 26.52 No 156.1
Part C Material Cost (Stone Masonary Silt Collection/Water recharging Str.-1)
E/w in excavation of foundation 37.66 Cum 38.98
C.Conc. (gatka) In foundation in 1:8:16 6.91 Cum 3433.35
C. Conc. (bajri) in 1:2:4 30.13 Cum 5602.51
Sq rubble masonry in 1:5 in foundaion 46.55 Cum 6089.23
Sq rubble masonry in 1:5 in super structure 1.76 Cum 5058.9
12.5 mm thick Cement sand plaster in 1:4 57.11 Sq.m 213.54
Carriage of sand from quarry to dump site 28.17 Cum 156.1
Carriage of bajri from quarry to dump site 1.58 Cum 156.1
Carriage of gatka from quarry to dump site 6.91 Cum 156.1
Carriage of boulder from quarry to dump site 84.35 Cum 156.1
Sub-Total A + B
Part D Material Cost (Stone Masonary Retaning Wall-1)
E/w in excavation of foundation 100.8 Cum 38.98
C.Conc. (gatka) In foundation in 1:8:16 11.2 Cum 3433.35
C. Conc. (bajri) in 1:2:4 1.4 Cum 5058.9
Sq rubble masonry in 1:5 in foundaion 58.8 Cum 6089.23
Sq rubble masonry in 1:5 in super structure 56 Cum 5602.51
12.5 mm thick Cement sand plaster in 1:4 170.1 Sq.m 213.54
Carriage of sand from quarry to dump site 43.39 Cum 156.1
Carriage of bajri from quarry to dump site 1.26 Cum 156.1
Carriage of gatka from quarry to dump site 11.2 Cum 156.1
Carriage of boulder from quarry to dump site 126.28 Cum 156.1
Sub-Total A + B
Part E Material Cost (Spilway of Pond-1)
E/w in excavation of foundation (6.6) 31.87 Cum 210.7
C.Conc. (gatka) In foundation in 1:8:16 10.6 b(i) 21.25 Cum 3433.36
C. Conc. (bajri) in 1:2:4 10.13 a(ii) 5.18 Cum 5058.91
Brick on edge flooring with brick of class as designation 105 incloding cement slurry etc.complete in cement motor 1:4 with FPS (11.7) 22.94 Cum 5098.29
12.5 mm thick Cement sand plaster in 1:4 CSR 15:9 53.48 Cum 213.54
Sign-Board 6' x 3' 0 No 3000
Sub-Total 234254
Part F Material Cost (Stone Masonary Retaning Wall-2)
E/w in excavation of foundation 20 Cum 38.98
C.Conc. (gatka) In foundation in 1:8:16 3 Cum 3433.36
C. Conc. (bajri) in 1:2:4 0.5 Cum 5058.9
Sq rubble masonry in 1:5 in foundaion 14.3 Cum 6089.23
Sq rubble masonry in 1:5 in super structure 17 Cum 5602.51
12.5 mm thick Cement sand plaster in 1:4 23.43 Sq.m 213.54
Carriage of sand from quarry to dump site 11.47 Cum 156.1
Carriage of bajri from quarry to dump site 0.45 Cum 156.1
Carriage of gatka from quarry to dump site 3 Cum 156.1
Carriage of boulder from quarry to dump site 34.43 Cum 156.1
Sub-Total A + B
Part G Material Cost (Crate Wire Str.-8 no)
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 340.2 Cum 38.98
Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 2453.15 Sq.m 197
Spreading of wire crates as per PWD specifications CSR 23.37 Cum 73.71
Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 722.17 Cum 1458.04
Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) Cum 156.1
Sign-Board 1 No 5000 5000
Grand Total of Work 02 (A+B+C+D+E+F+G)
Work 03 STONE WIRE CRATES works Village:-Khad-Bathlor ,Tehsil Shri Anandpur Sahib, Block:-Nurpur Bedi, District:-Roopnagar PMKSY
Estimate San.No. Dated for Rs.
Material Cost (Crate Wire Str.-2 no)
E/w excavation in gravel soil for trench of masonry str. CSR 6.19 as per PWD specifications 103.5 Cum 38.98
Weaving of wire crates in size 15x15cm as per PWD specifications CSR 23.29 753.3 Sq.m 197
Spreading of wire crates as per PWD specifications CSR 23.37 Cum 73.75
Filling of stones into wire crates hand pack as per PWD specifications CSR 23.32 240.75 Cum 1458.04
Carriage of Stone/Boulder From Quary Site to Dump Site CSR 5.2(i) 0 Cum 0
Sign-Board 1 No 5000
Total of Work 03 Total
1.The quantities indicated above are tentative and may vary. The actual quantities shall be communicated at the time of issuance of the Work Order.
2.The rates of carriage are provisional and may undergo minor variation, subject to the final approval of the estimate by the Competent Authority.
3.The list of works may be modified by way of addition or deletion, depending upon the availability of funds and administrative requirements.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
DNIT08.pdf
Tender Documents • 0.49 MB
finbid08.xls
Additional Documents • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .