| 1 | 1₹2.6 CrAccepted-AOC | ₹2.6 Cr | 1 | Accepted-AOC L1 ACCEPTED |
| 2 | 2₹2.8 Cr+₹19.4 L (7.47%)Rejected-Finance | ₹2.8 Cr+₹19.4 L (7.47%) | 2 | Rejected-Finance L2 Rejected |
| 3 | 3₹3.1 Cr+₹45.9 L (17.6%)Rejected-Finance 251 A KARAKATHIKOTTAI MANAMELKUDI TALUK PUDUKKOTTAI 614 619 | PUDUKKOTTAI | TAMIL NADU | 614619 | ₹3.1 Cr+₹45.9 L (17.6%) | 3 | Rejected-Finance L3 Rejected |
| 4 | 4₹3.2 Cr+₹55.1 L (21.2%)Rejected-Finance | ₹3.2 Cr+₹55.1 L (21.2%) | 4 | Rejected-Finance L4 Rejected |
| 5 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | DHANA VIMAL L2 | SRI POLINCHI AND CO L1 | OSM CONSTRUCTIONS L4 | RRK AND CO L3 |
|---|---|---|---|---|---|---|---|
| 1.10Strengthening to the road from Alangudi Alavayal road to Kothamangalam (via) Therkkupatti Km 0/0-4/560 in Vadagadu Panchayat | |||||||
| 1.20 | Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 5,423.04 | sqm | 4 ₹21,692.16 Lowest | 5 ₹27,115.2 | 7 ₹37,961.28 | 5.94 ₹32,212.86 |
| 1.30 | Sacrifying Existing Wornout BT surface to a Depth of 150 mm by Mechanical Means sacrifying existing granular surface to a depth of 150mm and disposal of sacrified material with a lift upto 3 m and leads upto 1000 m as per Technical specification clause 301.4 | 5,679.83 | sqm | 15 ₹85,197.45 Lowest | 18 ₹1,02,236.94 | 24 ₹1,36,315.92 | 21.84 ₹1,24,047.49 |
| 1.40 | construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site ,spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per Technical specification clause 303.1 | 2,440.36 | sqm | 110 ₹2,68,439.6 Lowest | 120 ₹2,92,843.2 | 135 ₹3,29,448.6 | 131.29 ₹3,20,394.86 |
| 1.50providing and laying spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material , labour charges ,rentals for machinery,fuel ana all other incidental charges etc..,complete | |||||||
| 1.60 | KM 0/0- 1/0 | 579.47 | cum | 2,450 ₹14,19,701.5 | 1,880 ₹10,89,403.6 Lowest | 2,600 ₹15,06,622 | 2,473.4 ₹14,33,261.1 |
| 1.70 | KM 1/0 - 2/0 | 552.26 | cum | 2,450 ₹13,53,037 | 1,885 ₹10,41,010.1 Lowest | 2,600 ₹14,35,876 | 2,473.4 ₹13,65,959.88 |
| 1.80 | KM 2/0 - 3/0 | 553.88 | cum | 2,450 ₹13,57,006 | 1,885 ₹10,44,063.8 Lowest | 2,600 ₹14,40,088 | 2,473.4 ₹13,69,966.79 |
| 1.90 | KM 3/0 - 4/0 | 560.02 | cum | 2,450 ₹13,72,049 | 1,885 ₹10,55,637.7 Lowest | 2,600 ₹14,56,052 | 2,473.4 ₹13,85,153.47 |
| 2.00 | KM 4/0 - 4/560 | 321.57 | cum | 2,450 ₹7,87,846.5 | 1,885 ₹6,06,159.45 Lowest | 2,600 ₹8,36,082 | 2,473.4 ₹7,95,371.24 |
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
25 Feb 2025, 3:00 pmClosed
ADDITIONAL COLLECTOR (DEVELOPMENT)
DRDA., PUDUKKOTTAI
MGSMT-2025-26 - PUDUKKOTTAI DISTRICT - THIRUVARANKULAM Panchayat Union - Package No.03 - Strengthening to the road from Alangudi Alavayal road to Kothamangalam (via) Therkkupatti Km 0/0-4/560 in Vadagadu Panchayat
2025_RDTN_523891_1
PDKT/MGSMT/25-26/03/TKLM
Open Tender
Civil Works - Roads
Item Rate
180 days
THIRUVARANKULAM
Pl refere tender document
4 documents required · 4 mandatory
₹0
₹3.1 L
DRDA., PUDUKKOTTAI
31 Jan 2026
8 Feb 2025
25 Feb 2025
8 Feb 2025
25 Feb 2025
8 Feb 2025
20 Feb 2025
Amount
Strengthening to the road from Alangudi Alavayal road to Kothamangalam (via) Therkkupatti Km 0/0-4/560 in Vadagadu Panchayat
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Sacrifying Existing Wornout BT surface to a Depth of 150 mm by Mechanical Means sacrifying existing granular surface to a depth of 150mm and disposal of sacrified material with a lift upto 3 m and leads upto 1000 m as per Technical specification clause 301.4
construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads transporting to site ,spreading grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000 m as per Technical specification clause 303.1
providing and laying spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material , labour charges ,rentals for machinery,fuel ana all other incidental charges etc..,complete
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Macadam to 50mm thick for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading,watering and compacting by power roller to achieve the required proctor density at 100% cpmpaction at optimum moisture content and hire fuel charges such as traffic barricading and providing dagerlights etc.comp for base-course and side berms
Providing and fixing name board cum citizen Board
Providing and fixing of Retro Reflectorised cautionary,Mandatory sings with definition plate made out of high intensity Grade prismatic sheeting conforming to IRC-67:2010 & ASTM D 4956-09,type IV specification and fixed on back support Frame of 25mmx25mm x3mm Mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete 45cm x 45cm x 60cm below Ground level etc complete including 7 years warrranty for the Retro Reflective sheeting as per clause 6.9 of IRC 67-2010 specification (as per MORT & Spec.No.801)
(i) 60 cm Equilateral Triangle (Cautionary) sign Board
Road Marking with hot applied thermoplastic compound with hot applied thermoplastic Bitumnuous Surface
Reinforced cement concrete M15 grade Kilometre stone /local stone of standard design as per IRC:8 fixing in position including painting and printing ,etc as per drawing and Technical specification clause 1703
(i) Ordinary Kilo metre stone (Precast)
(ii) 200 m stone (Precast)
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-277
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-427
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-692
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-806
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-939
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-1108
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-1470
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-3081
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC 3M Span Culvert @ Ch-3207
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Below sill level
Above sill level
Supplying and fabrication of steel Rod including cost and conveyance of steel to site and all labour charges etc., Completed.
RCC 1:1:5:3 mix using 20mm ISS HBG metal including cost and conveyance and all labour charges etc., Completed.
Provision for Construction of Retaining Wall @ Ch 3207
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation
FILLING WITH M.SAND including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
PVC 3" Pipe for Weep Holes @ 2.00 Metre Spacing etc., Completed.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-4283
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
Provision for Construction of RCC NP3 Pipe Culvert @ Ch-4565
Earth work excavation for foundation soil as per SS 20 B for foundation.
FILLING WITH M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc.,complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete. Below sill
Cost & Supply of RCC Pipe 900mm dia (NP3)
supplying and Filling course gravel including cost and conveyance of gravel at site and all labour charges fpr filling ect.,complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
DHANA VIMAL (BID ID -1250630)
RRK AND CO (BID ID -1257179)
OSM CONSTRUCTIONS (BID ID -1257477)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .