| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | -39.50% | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.0 CrAdmitted-Finance | -37.52% | ₹3.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹3.5 CrAdmitted-Finance | -27.72% | ₹3.5 Cr | L3 | Admitted-Finance |
| 4 | L4₹3.8 CrAdmitted-Finance | -21.00% | ₹3.8 Cr | L4 | Admitted-Finance |
Updated dates
Tender Value
₹4.9 Cr
EMD Value
₹9.7 L
Closing Date
16 May 2026, 6:00 pmClosed
Executive Engineer
S and D Div W Jammu
Construction of nallah passing through Durga Nagar, Jammu. Contract No SDJ/W/08/ 2026-27
2026_HAUDD_309178_2
E-NIT No 04 of 2026-27 Dated 30-04-2026
Open Tender
Civil Works
90 days
Jammu
Refer eNIT and SBD terms and Conditions
2 documents required · 2 mandatory
₹5,000
CAO JMC Jammu
₹9.7 L
5 Jun 2026
30 Apr 2026
18 May 2026
1 May 2026
16 May 2026
1 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete maually/by mechanical means including disposal of material within 50 metres lead 1:3:6 or richer mix | 1,009.8 | cum | 1,725.2 | ₹17,42,106.96 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 2,914.56 | cum | 256.85 | ₹7,48,604.74 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:25 meter beyond 1 m from cutting edge. All kinds of soil | 728.64 | cum | 479.3 | ₹3,49,237.15 |
| 4 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | 52.5 | cum | 2,516.85 | ₹1,32,134.63 |
| 5 | Removal of unhygienic material(so classified by the site engineer) from designated sites and its disposal as per direction, all inclusive. | 1,782 | cum | 189.2 | ₹3,37,154.4 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size Crushed) | 303.16 | cum | 5,733.6 | ₹17,38,198.18 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement. All work upto plinth level. excluding cost of centring, shuttering,finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size) | 1,949.4 | cum | 7,788.4 | ₹1,51,82,706.96 |
| 8 | Construction of temporary diversion bund by way of filling empty cement bags with sand including cost of sewing string and sand & placing in position. | 18,711 | each | 37.24 | ₹6,96,797.64 |
| 9Centring and shuttering including strutting,propping etc. & removal of form for: | |||||
| 9.01 | Foundations: footings, bases of columns etc. for mass concrete. | 66 | sqm | 286.35 | ₹18,899.1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
BOQ_1001052.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid