Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹40.8 L
EMD Value
₹82,000
Closing Date
12 Nov 2026, 6:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE Golconda
GE GOLCONDA LANGER HOUSE ROAD OPP MILITARY HOSPITAL HYDERABAD TELANGANA-500 008
SPL REPAIR TO SEWAGE NETWORK TO PREVENT FREQUENT CHOKING, BLOCKING AND ACCUMULATION OF SEWER WATER IN NEW MD LINES UNDER GE GOLCONDA
2026_MES_794918_1
8172/E8
Open Tender
Civil Works
Item Rate
180 days
GE Golconda
As per tender
9 documents required · 9 mandatory
₹500
GE Golconda
₹82,000
Yes
21 Oct 2026
21 Oct 2026
14 Nov 2026
21 Oct 2026
12 Nov 2026
5 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Thorough cleaning of sewage manholes / inspection chambers of any size and depth upto 1.2m from GL. The work involves: (a) Opening of manhole covers and providing adequate ventilation to ensure the escape of toxic gases (H2S, Methane). (b) Manual or mechanical removal of accumulated sludge, silt, grit, solid waste, and any other obstructions from the floor, benching, and channel of the manhole. (c) Scrubbing of internal walls and benching to remove fungal growth/algae. (d) Immediate removal and carting away of the extracted sludge from the premises in sealed containers to the outside of MD land complete all as specified and directed. | 300 | Per MH | - | - |
| 2 | Thorough cleaning of sewage manholes / inspection chambers of any size and depth more than 1.2m from GL. The work involves: (a) Opening of manhole covers and providing adequate ventilation to ensure the escape of toxic gases (H2S, Methane). (b) Manual or mechanical removal of accumulated sludge, silt, grit, solid waste, and any other obstructions from the floor, benching, and channel of the manhole. (c) Scrubbing of internal walls and benching to remove fungal growth/algae. (d) Immediate removal and carting away of the extracted sludge from the premises in sealed containers to the outside of MD land complete all as specified and directed. | 320 | Per MH | - | - |
| 3 | Cleaning of septic tanks completely by empting the liquid / semi solid foul contents mechanically as specified completely, cleaning inlets and outlets etc including disposal of soil sludge outside MD land complete all as specified and directed. | 387 | Cum | - | - |
| 4 | Systematic clearing of accumulated solid waste, silt, grit, and sludge from internal / external sewage pipelines / hume pipe culverts of diameters up to 300mm. The process includes: (a) Use of high-pressure hydro-jetting machine with specialized nozzles to break down hardened silt and flush it towards the downstream manhole. (b) Where mechanical jetting is restricted, use of flexible sewer rods with appropriate attachments (cutters/scrapers) to dislodge blockages. (c) Continuous flushing with water to ensure all dislodged debris is captured at the manhole and removed manually. (d) Verification of the "clear bore" by performing a ball test or a flow-gradient test between two consecutive manholes. Work includes the disposal of all extracted waste in sealed containers to the outside of MD land complete all as specified and directed. | 2,500 | RM | - | - |
| 5 | Systematic rectification of leakages at the entry and exit pipe junctions within the manhole by Chipping away failed cement mortar or old "benching" around the pipe circumference to a depth of 50mm. And applying a high-strength, fast-setting, non-shrink hydraulic cement or epoxy-modified mortar to seal the annular space between the pipe and the wall complete all as specified and directed | 400 | Per Joint | - | - |
| 6 | Excavation in trenches n.exc 1.50m wide and n.exc. 1.50 m depth and getting out in hard/dense soil complete all as specified and directed. | 22.44 | Cum | - | - |
| 7 | Excavation in trenches n.exc 1.50m wide and depth exc. 1.50 m but n. exc 3 m and getting out in hard/dense soil complete all as specified and directed. | 16.83 | Cum | - | - |
| 8 | Excavating over areas, n exc 1.5 m deep and getting out mud, vegetation, debris of brickwork, concrete etc complete all as specified and directed | 31.83 | Cum | - | - |
| 9 | Earth work in excavation in all kind of soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed. | 109.4 | Cum | - | - |
| 10 | Earth work in excavation in ordinary rock by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed. | 58.91 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_891533.xls
BOQ • 0.29 MB
8172NIT.pdf
Additional Documents • 0.33 MB
8172Tender.pdf
Tender Documents • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .