| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.9 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹44.8 L+₹1.9 L (4.33%)Rejected-AOC NA | NA | NA | 121004 | L2 | Rejected-AOC l2 | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹44.6 L
EMD Value
₹89,120
Closing Date
4 Jun 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of the SE, 1st Irrigation work, Meerut
Office of the SE, 1st Irrigation work, Meerut
06/SE-1/2021-22 Reconstruction of V.R.B. at km 17.000 of Kharauli Drain
2022_UPIDC_672107_5
06/SE-1/2021-22
Open Tender
Civil Works - Canal
Piece-work
365 days
As per Tender Notice
As per Tender Notice
2 documents required · 2 mandatory
₹2,354
₹89,120
25 Oct 2023
30 May 2022
6 Jun 2022
30 May 2022
4 Jun 2022
30 May 2022
90 days
Amount
Earth work in filling for manking of bunda includiing lift up to 1.50 m and Lead beyond 195m Complete.
Surface dewatering including cost of all arrangements, material, labour, T&P etc
Earthwork in Exacavation of foundations including lift 1.50 m and lead up to 30.00 m etc all comoplete.
Centering and Shuttering of C.C. Work including rent of shuttering materail, labour and T&P etc. All complete
Laying C.C. 1:3:6 with well graded stone ballast in Foundation i/c all cost of material labour,T&P etc all complete.
Ist class Brickwork in 1:4 CM i/c all cost of material labour,T&P etc all complete.
Centering and Shuttering for R.C.C work including cost of centering & shuttering, labour, T&P etc. Complete.
C.C. 1:2:4 in wearing coat & approach slab.
C.C. 1:1.5:3 in wearing coat.
CC 1:6:12 i/c all cost of material labour,T&P etc all complete.
Deep struck cement pointing 1:2 cement mortar including cost of all material, labour, T&P etc. Complete.
S/F 25 mm thick making expansion joint with thermocol.
S/L bitumen tarfelt sheet above abutment including all cost of labour T&P etc. complete.
RCC 1:1.5:3 in Abutment, cap & Slab with 10 to 20 mm well graded stone with michanical mixture and vibrator including all labour and T&P etc all complete.
Providing and fixing PVC drainage pipe 600 mm long & 75mm dia i/c cost of all material, labour, T & P etc. Complete.
Earthwork in Filling for repari of banks including lift upto 1.50 m and lead beyond 195m also with ramming, dressing and manual compaction of surface to the required levels and slope etc complete
Finishing wall weather coat of approved quality on surface i/c all cost of material, labour T & P etc.
Removing bundha diversion of water flow including proper disposal and dressing etc.
Providing steel reinforcement i/c cost of materail, labour, T&P bending, binding and placing in position complete.
M/S S R CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .