Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.6 LAdmitted-Finance GRAM NANEHA ASHA TEHSIL DEVBAND DISTRICT SAHARANPUR MOBILE 9927733433 | -0.15% | ₹14.6 L | L1 | Admitted-Finance |
| 2 | L2₹14.6 LAdmitted-Finance | -0.11% | ₹14.6 L | L2 | Admitted-Finance |
| 3 | L3₹14.6 LAdmitted-Finance | -0.09% | ₹14.6 L | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
10 Jun 2026, 10:00 amClosed
PO DUDA BIJNOR
O/O PO DUDA BIJNOR
PRABHAGIYA OFFICE SAMAJIK VANIKI PRABHAG BIJNOR KE SAMNE BOUNDRY WALL AND INTERLOKING KA WORK
2026_TACPD_1156542_5
107
Open Tender
Civil Works
Percentage
180 days
BIJNOR
PLEASE REFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹854
PO DUDA BIJNOR
₹1.5 L
11 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
10 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W Excavation in foundation in ordinary Soil i/c lift up to 1.50 m and lead up to 30M and i/c filling watering and ramming of excavated earth into the trenches or into the space between the boundry wall SI NO 251 | 23.33 | M2 | 180 | ₹4,199.4 |
| 2 | Concrete with 4cm gauge approved Stone ballast, coarse sand and cement in proportion of 8:4:1 including supply of all materials labour and completion of the work .S I no 281 | 7.78 | M3 | 6,720 | ₹52,281.6 |
| 3 | Concrete with 2cm gauge approved Stone ballast, coarse sand and cement in proportion of 4:2:1 including supply of all materials labour and completion of the work .S I no 279 a | 0.07 | M3 | 7,400 | ₹518 |
| 4 | R.C.C. 1:1.5:3 with cement corse sand &20 mm gauge stone grit in T beam slab roof and R.c.c. Column i/c including supply of all materials, labour and all tax T&P etc 288 | 21.24 | M3 | 8,010 | ₹1,70,132.4 |
| 5 | M.S. or Iron work in plain work such as R.C.C. or R.B. work including bending for proper completion of work and including supply of steel as per complete | 20.8 | qtl | 7,050 | ₹1,46,640 |
| 6 | M 150 Class Brick Work 1:3 Cement and approved Coarse sand of 2.25 fm in foundation and plinth including supply of all materials, labour Taxes and T&P etc required for proper completion of work S.I. No. 307 | 5.57 | M3 | 5,480 | ₹30,523.6 |
| 7 | 12 MM thick Plaster with one part of cement and Three part of approved Corse Sand Mortar including supply of all materials labour and completion of the work S.I.no 583. | 61.88 | M2 | 215 | ₹13,305.06 |
| 8 | Providing wall putty on new Surface with approved quality material of Birla/J.K. as per Similar 2 coats as per ch 15 new item No.2 | 49.46 | M2 | 58 | ₹2,868.91 |
| 9 | Providing Cement primer on new Surface with app quality material labour and T&P etc all complete at Site Ch 15 SI No. new item no 10 | 49.46 | M2 | 66 | ₹3,264.62 |
| 10 | Finishing wall with two coat of water proof Cement paint weather coat of app quality on previously old treated surface with thei paint to given an even shede i/c all complete at Site SI No ch 15 new item no (8+9) | 49.46 | M2 | 118 | ₹5,836.75 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_2167114.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].