Loading…
Loading…
Tender Value
₹8.6 Cr
EMD Value
₹17.2 L
Closing Date
30 Jul 2026, 3:00 pm
SALEM DIVISION: Replacement of overaged/ obsolete S&T gears & other associated works over Salem Division
SA-SG-120-I-OT-08-2026
SA-SG-120-I-OT-08-2026
Open
12 Months
Salem, Tamil Nadu
₹0
₹17.2 L
7 Jul 2026
7 Jul 2026
16 Jul 2026
A-Items which are covered under SOR 2022.
B-Items which are not covered under SOR 2022.
Item Breakup - A-Items which are covered under SOR 2022.
200.00 Wago block to Datalogger. Necessary Wagos required is included as per schedule
50.00 Datalogger. Necessary Wa g o s required is included as per schedule
24.00 as per RDSO Specifications RDSO/SPN/256/2002 or latest
3.00 1276951.75 RDSO Specifications RDSO/SPN/165 or latest, (This schedule does not include Batteries) As per drawing enclosed
3379.20 o f t h e following capacities w i t h necessary inspection a s p e r specification/ drawing/ description enclosed in this document.b)Supply o f Secondary cells - 2V- 80AH capacity
7040.00 o f t h e following capacities w i t h necessary inspection a s p e r specification/ drawing/ description enclosed in this document.d)Supply o f Secondary cells - 2V- 200AH capacity SALEM DIVISION-S AND T/SOUTHERN RLY
9574.00 o f t h e following capacities w i t h necessary inspection a s p e r specification/ drawing/ description enclosed in this document. e) S u p p l y o f Secondary c e l l s - 2V-300AH capacity
24.00 Detector. T h i s includes transportation of materials t o Site location a n d provision of c a b l e t r o u g h a r r a n g e m e n t s including c o n n e c t i o n t o t h e B R C e a r t h . Also includescarrying out of pre-commission checklist.
3.00 arrangement o f O E M engineer f o r checking the Installation and carrying out adjustments o f I P S m odule s a n d submission o f Pre- commissioning checklist
3.00 RDSO Specification No. RDSO /SPN /165 or latest.This work includes transporting the IPS from the Stores by loading without any damages and installation of the same at site. This also includes wiring of all modules, proper earthing of equipments and all other w o r k s c o n n e c t e d f o r t e s t i n g and commissioning o f t h e s a m e . Necessary p o w d e r e d c o a t e d A l u m i n i u m ladder arrangements including cable trench, pipes, bolts, a n d other accessories i s included in this schedule.[Earthing is not covered under this schedule]
750.00 (10 pair/ 20 pair/50 pair) Cables in 1" PVC conduit/case caping a n d clamping on the w a l l / Ro o f t o p s / S h e l t e r s w i t h suitable clamping a n d h o s e t o b e provided where e v e r b e n d s / c u r v e s ( P V C conduit/ Case capping and other accessories to be supplied by the contractor)
2000.00 except hard rocky areas including clearing of roots of trees, rocks, bushes etc. to a depth of 1.0 Mtrs and to a width of 0.3 Mtrs. (Laying o f cables i s n o t included i n this schedule)
100.00 the Passenger Platform, trenching to a depth o f 0 . 6 m t o accommodate t h e additional cables, replacing the slabs removed after the cables are laid and replastering with cement mortar, refilling the trench by ramming and consolidating i t a s p e r the instructions of Railway Representatives at site. (Laying of cables is not included in this schedule). SALEM DIVISION-S AND T/SOUTHERN RLY
500.00 c a b l e d u c t , o p e n i n g t h e s l a b s to a c c o m m o d a t e a d d i t i o n a l c a b l e laying, REPOSITIONING the slabs removed after the cables are laid and PLASTERING with cement mortar, and refilling the trench by ramming and consolidating it as per the instructions of Railway Representatives at site. (Laying of cables i s n o t included i n t h i s schedule.) [Cement,M Sand and all other miscellaneous materials required f o r the work shall be supplied by the Contractor].
120.00 track crossing of cables, refilling of trench by ramming and consolidating i t a s per the instructions of Railway representative at site a f t e r l a y i n g o f D W C / RC C p i p e s . During excavation o f trench, i t h a s t o b e ensured that the excavated soil does not mix with the ballast available. T h e depth o f 1 m trench shall be from the bottom of sleepers for track crossings. Laying of cables and DWC pipes is not included in this schedule. (Supply of DWC/RCC pipes with couplers/collars is not included in this schedule).
120.00 cable laying with offset at both ends and with couplings over RCC bridges, drainage, culverts, and girder bridges. For RCC bridges, drainage, and culverts, the pipes shall be mounted on concrete masonry supports of size 300mm x 300mm x 300mm at an interval of 2 meters. For girder bridges, the pipes shall be fixed on suitable MS clamps at an interval of 2 meters. The ends of the pipes shall be closed with brick masonry abutments to ensure that no cable is exposed. The work shall be carried out as per the instructions of the Railway representative at the site.(Supply of GI pipes with couplings and laying of cables is not included in this schedule).Stone jelly (20/25mm size), bricks, sand, cement, MS angles, flats, bolts, nuts for manufacturing and fixing clamps, bricks, M sand, cement, and other miscellaneous materials for the work shall be supplied by the contractor.
60.00 cable laying in hard rocky area with off sets a t b o t h e n d s d u l y supported b y concrete blocks of size 300mm x 300 mm x 300 mm at an interval of 2m. The ends of the pipes s h a l l b e c l o s e d w i t h b r i c k masonry abutments work so that no cable is exposed, T h e w ork shall be carried o u t a s p e r the instructions of Railway representative at site.(Supply of GI pipes with couplings and laying of cables is not included in this schedule).[Stone jelly of size 20/25mm, bricks, sand, cement, a n d a l l other miscellaneous materials required f o r the work shall be supplied by the Contractor].
f signaling/power/ Metre telecommunication cables a s per cable plan in cable trenches, masonry ducts, RCC Pipes, DWC pipes, GI Pipes etc.(Supply of cables is not included in this schedule). SALEM DIVISION-S AND T/SOUTHERN RLY
2000.00 width throughout, with earth after laying of cables, a n d consolidating t h e t r e n c h by ramming and levelling."
foundation o f size 300mmX300mmX300mm and Placing of RCC cable markers on top of t h e foundation a n d refilling t h e p i t and consolidating i t b y ramming. T h e cable markers shall be provided at an interval of 20 M t r s . w i t h i n statio n l i m i t s a n d 5 0 Mtrs. outside station limits throughout t h e cable r o u t e , d i v e r s i o n s a n d a l s o a t every track/road crossing."
30.00 Horizontal Drilling at approximately depth of 1.5 to 2 m below the formation level of the earth including insertion of HDPE pipe/DWC pipe along with couplers, drawl of cable (or) direct drawl o f cables etc. (Note: T h e pilot used for HDD should be of sufficient size to s u i t insertion o f H D P E / D W C p i p e o f size 120mm (outer dia.) or direct drawl of three cables (Signalling/Power/Quad/OFC) or three nos.of 4 0 m m d i a HDP E pipe o r a n y other combination a s d i r e c t e d b y t h e site engineer) ( S u p p l y o f H D P E p i p e i s not covered in this schedule)"
90.00 p e rR D S O Specifications No.RDSO/SPN/199/2010 Rev1.1 or latest
90.00 per RDSO Specifications RDSO/SPN/199/2010 Rev1.1 or latest
90.00 per RDSO Specifications RDSO/SPN/199/2010 Rev1.1 or latest
5703.33 L E Da s p e r R D S O Specifications SPECIFICATION N O . RDSO/SPN/153/2023 Revision 5.0 or latest
5740.70 L E Da s p e r R D S O Specification SPECIFICATION N O . RDSO/SPN/153/2023 Revision 5.0 or latest
10.00 Double Digit) fro m 1 t o 9 w i t h white LED (With Housing) as per technical specification
75.00 o f p a g i n g a n d talk-back including voice communication e q u ip m e n t w i t h suitable switching arrangement a t t h e Signal post a n d a t S M ' s r o o m a s p e r specification enclosed i n t h i s document. T h i s includes drawl of tail cable through GI pipe 25mm dia and 2 mtrs long duly clamped to Signal post with bend as required at site, termination of tail cable at one end in the apparatus case and other end in the console. In the SM's room, console shall be fixed on a table top. T h e wiring shall b e d o n e using wire PVC 16/0.2mm copper. [Talk-back equipment complete including housing box , w i r e PVC 16/0.20mm a n d all other miscellaneous materials required for the w o r k s h a l l be supplied by the Contractor]. SALEM DIVISION-S AND T/SOUTHERN RLY
30.00 Magnetically Latched Neutral Line 2 4 V DC, 11F/4B contacts Relay complete w ith plug board (base plate), connectors and retaining clips and conforming to BRS 935A and RDSO S p n . N o I R S S 3 4 a n d S - 2 3 o r latest. The interlocking c o d e f o r t h i s u n i t s h a l l be "ABDEG"
30.00 (2F/2B)(Miniature, Tr a c t i v e a r m a t u r e , AC I m m u n e , D . C B i a s e d Tr a c k Re l a y ) A.C. immunity level o f 8 0 Volt A.C, coil nominal resistance o f 9 O h m s , confirming t o BRS s p e c n o . 9 3 9 A & 9 6 6 F 2 a n d RDSO specification N o . 8 4 / 8 8 o r latest. The interlocking c o d e f o r t h i s u n i t s h a l l be "ABEJX"
2742.03 s e c s ) w i t h p l u g boards, connectors and retaining clips with necessary inspection as p e r specificatio n/ d r a w i n g / description enclosed in this document.
5901.50 a)LED aspects with plug boards, connectors and retaining clips with necessary inspection as per specification/
75.00 w i t h necessary inspection a s per specification/
4070.00 boards, connectors a n d retaining clips with necessary inspection as per specification
90.00 type o f required ward Nos. with keys, with necessary inspection a s p e r specification/ drawing/
250.00 relays in the relay racks/apparatus cases as Relay per the approved circuit diagram using wire P V C 16/0.2mm copper. T h e w o r k includes p a i n t i n g alterations a n d r e l e a s i n g the unwanted wires carefully without disturbing the existing wiring.[Wire P V C 16/0.2mm c o p p e r , soldering materials, bunching t h r e a d s , condensers, resistances and teakwood plank for fixing them and all other miscellaneous materials required f o r the work shall be supplied by the Contractor].
4.00 interfacing t h e Fi r e A l a r m a n d Detection systems
Numbers 1300.00
8106.70 and supply o f Ni-cad power pack 4V-2.2AH with charger to work on 110VAC
37.74 unit=Per fuse) SALEM DIVISION-S AND T/SOUTHERN RLY
15.00 termination boxes on rails and concreting as per Drg. No.SG/CN/02/8, drilling of suitable holes in the box, fixing of 2 Nos. of GI pipes 32mm dia a n d 300mm long a t t h e bottom with clamp nuts - 12 mm thick, one at the inner side and another at the outer side for each pipe f o r cable entry a n d o n e G I pipe 150mm long 32mm dia for drawl of jumper w i r e s f o r P o i n t machines e t c . , fi x i n g of hardwood plank 37mm thick on the bottom, provision of one EWS lock, and painting the boxes inside a n d outside w ith o n e coa t of red-oxide and two coats of aluminium paints.
16383.88 I R S t y p e a n d c o n n e c t i n g a l l ground connections including wiring and termination i n p o i n t m a c h i n e a n d interconnections between point machine and CT box through PVC hose pipe with 3/0.75mm and 7/1.40mm copper wire and painting. This work includes provision o f insulation to stretcher bars, throw b a r l u g a n d "D" bracket wherever required, cutting of notches on the point machines covers to suit crank handle configuration.(Combined type point machine with ground connection, uninsulated stretcher bar, throw bar lug and 'D' brackets will be supplied by Railways.[All types of insulations connected to point work, coal bengal, all type of bolts and nuts, washers spring/flat w ire P V C 7/1.4mm copper, PVC hope pipe, paints, PVC/nylon sleeves and all other miscellaneous materials required for t h e w o r k s h a l l b e s u p p l i e d by the Contractor].
30.00 as per Drg.No.SG/CN/02/9 using metallic templates, for erection of colour light signals up to 4 aspects.[Foundation bolts, cement, M sand, stone jelly of size 20/25mm dia and all other miscellaneous materials required for the work shall be supplied by the Contractor]. SALEM DIVISION-S AND T/SOUTHERN RLY
36.00 mounting o f c o l o u r l i g h t s i g n a l u p t o 4 aspects complete o n S i g n a l p o l e / Off-set bracket, ( f o r L E D / fi l a m e n t b u l b s ) with lenses, t r i p l e p o l e l a m p holde r, filament switching u n i t s , C L S transformer, current regulators (whichever is applicable), fixing of ladder w i t h p l a t f o r m c o m p l e t e and concreting o f ladder shoe, fixing o f number plates, marker board, lens guard, fixing of s p e e d l i m i t b o a r d w h e r e v e r necessary, termination o f tail cables, wiring o f signal u n i t w i t h P V C w i r e 3 / 0 . 7 5 m m copper, provision of EWS locks, and painting of one c o a t o f r e d o x i d e a n d t w o c o a t s of aluminium/ enamel paints. When the aspect is fixed on Offset bracket using 'U' bolts and nuts, a through bolt shall b e provided by drilling a hole i n t h e signal pole t o prevent the offset bracket from sliding down.(Supply of surface base, Offset bracket, CLS pole, C L S aspects complete, ladder with shoes and platform, Speed limit board, LED aspects, current regulators, l a m p holders, l a m p s , filam e nt switching u n i t a n d CLS transformer is not covered in this schedule). ['U' bolts and nuts, through bolts and nuts, cement, stone jelly 20/25mm dia , M sand, S i g n a l C o l l a r R i n g s , w i r e P V C 3/0.75mm copper, lens-guard, all fixing bolts and nuts, l e a d w o o l , p a i n t s P V C / N y l o n sleeves, enameled number plates. enameled marker b o a r d s , E W S l o c k s , a n d a l l other miscellaneous materials for the work shall be supplied by the Contractor]."
5.00 foundation as per Drg, No.SG/CN/02/10 using metallic templates, f o r erection of ground type colour light shunt signal. [Foundation bolts and nuts, cement, M sand, stone jelly of size 20/25mm and all other miscellaneous materials for the work shall be supplied by the Contractor]."
5.00 complete including surface base, signal pole, L E D aspects/ lense s, b u l b s w i t h holders (whichever i s applicable), fi x i n g o f lens guards, number plate, termination o f tail cables, wiring o f signal unit w ith P V C wire 3/0.75mm copper, provision o f E W S locks and painting of one coat of red oxide and two coats of Aluminium/ enamel paint.(Supply of Ground type shunt signal complete including surface base, signal pole, LED aspects, holder, bulbs, and lenses is not covered in this schedule).[Wire PVC 3/0.75mm copper, lens guards, E W S locks, Enameled number plates, bolts and nuts, lead wool, paints and all other miscellaneous materials shall be supplied by the Contractor]."
10.00 nuts, erection o f P o s t t y p e shunt Signals, termination o f tail cables a n d wiring using wire PVC 3/0.75mm copper, provision of EWS lock and painting o f one coat o f red-"oxide and two coats of aluminium/ enameled paint. The work also includes drilling suitable holes o n t h e C L S post a n d provision o f a through bolt with nut to prevent the Off- setbracket from slipping down." SALEM DIVISION-S AND T/SOUTHERN RLY
5.00 indicator[Fixing bolts and nuts, EWS locks wires PVC 3/0.75mm & 16/0.2mm copper, wire mesh, PVC/Nylon sleeves, paints and all other miscellaneous materials shall be supplied by the Contractor]
5.00 way to 6 ways - complete/ fixing of additional l i m b t o t h e e x i s t i n g route indicators, termination o f t a i l cables, wiring as per approved circuits diagram using wire PVC 3/0.75mm copper, provision of required No of EWS locks, wire mesh, and painting. (Supply o f junction type Route Indicators - complete and additional limb is not covered in this schedule).[3/0.75mm wire PVC, fixing bolts and nuts, EWS l o c k s , w i r e mesh, PVC/Nylon sleeves, paints and all other miscellaneous materials shall be supplied by the Contractor]. a)Fixing a n d w i r i n g of direction type route indicator - 1 way
10.00 n u t s , erection o f Calling O n Signals/ 'A' marker lights, termination of tail cables and wiring u s i n g w i r e P V C 3/0.75mm copper, provision o f E W S l o c k , n u m b e r plates/ marker boards a n d painting. T h e work also includes drilling suitable holes o n t h e CLS post and provision of a through bolt with nut to prevent the Off-set bracket from slipping down.(Supply of Calling on Signal/ 'A' marker light, L E D aspects/holders & bulbs a n d Off set brackets is not covered in this schedule). ['U' bolts and nuts, through bolts with nut, w i r e P V C 3 / 0 . 7 5 m m c o p p e r , E W S lock, E n a m e l e d n u m b e r p l a t e s , w i r e mesh, PVC/Nylon sleeves, p a i n t s a n d a l l other miscellaneous materials shall be supplied by the contractor].
50.00 new tail cables for colour light signals up to four aspects with or without route indicator, post type shunt signal and Calling on signals, termination o f n e w tail cables and wiring u s i n g w i r e P V C 3/0.75mm copper. This work includes drawl of new tail cables into the signal post duly releasing the existing tail cables from the relevant signals a n d re-surfacing t h e e a r t h excavated as instructed by Railway representative at site. [Wire PVC 3/0.75mm copper, paints and all o t h e r miscellaneous m a t e r i a l s s h a l l be supplied by the Contractor]. SALEM DIVISION-S AND T/SOUTHERN RLY
73.59 existing terminals/ fuse blocks in apparatus c a s e s / b a t t e r y b o x e s / C T b o x e s / cable termination racks a s p e r approved circuit diagram. The terminal particulars a r e to be r e p a i n t e d /correc te d o n t h e d o o r s of a p p a r a t u s c a s e s / b a t t e r y b o x e s / cable termination boxes and FTOT index board as instructed by Railway representative at site. T h i s w o r k includes c l o s i n g t h e opening created f o r e n t r y o f n e w c a b l e s i n the apparatus cases w i t h masonry brick work a n d sealing t h e bottom o f t h e apparatus cases/ cable termination racks w i t h cable compound.[Paints, wire PVC 3/0.75mm and 16/0.2mm copper, sealing compound, bricks, cement, M sand and all other required miscellaneous materials shall be supplied by the contractor].(Per Unit = Per Terminal block)
500.00 power cables and internal wiring on terminal/ fuse blocks i n n e w apparatus cases, cable termination b o x e s a n d i n gate Lodges excluding cable termination r a c k at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood b a s e p l a n k , fi x i n g o f Phynolic synthetic industrial fibre base fine weave cotton fibre board 6mm thick for terminal board to suit e a c h a p p a r a t u s c a s e , v a r n i s h i n g all teakwood items, fi x i n g o f terminals/ fuse blocks o n t h e terminal b o a r d , drilling of necessary h o l e s , termination o f cables, w i r i n g , identifica tio n o f c a b l e s using aluminium tags with letters punched neatly, a s p e r approved circuit diagram a n d cable p l a n , painting o f particulars o n sleeves andalso o n t h e inner side o f t h e doors of apparatus cases. After terminations are "over, the side openings o f apparatus case foundation shall b e closed with brick work, cement plastered, the inter-space filled with M sand u p t o b a s e level a n d t h e bottom s u r f a c e s h a l l b e s e a l e d w i t h sealing compound.(Supply of PBT terminals and Fuse blocks is not covered in this schedule)." a)Termination o n 25/60mm P B T terminals (new location)(Phynolic sheet)(Per Unit = Per Terminal block) SALEM DIVISION-S AND T/SOUTHERN RLY
50.00 power cables and internal wiring on terminal/ fuse blocks i n n e w apparatus cases, cable termination b o x e s a n d i n gate Lodges excluding cable termination r a c k at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood b a s e p l a n k , fi x i n g o f Phynolic synthetic industrial fibre base fine weave cotton fibre board 6mm thick for terminal board to suit e a c h a p p a r a t u s c a s e , v a r n i s h i n g all teakwood items, fi x i n g o f terminals/ fuse blocks o n t h e terminal b o a r d , drilling of necessary h o l e s , termination o f cables, w i r i n g , identifica tio n o f c a b l e s using aluminium tags with letters punched neatly, a s p e r approved circuit diagram a n d cable p l a n , painting o f particulars o n sleeves andalso o n t h e inner side o f t h e doors of apparatus cases. After terminations are "over, the side openings o f apparatus case foundation shall b e closed with brick work, cement plastered, the inter-space filled with M sand u p t o b a s e level a n d t h e bottom s u r f a c e s h a l l b e s e a l e d w i t h sealing compound.(Supply of PBT terminals and Fuse blocks is not covered in this schedule)." b)Termination o n P B T f u s e b l o c k (new location) (Phynolic sheet)(Per Unit = Per Fuse block)
100.00 power cables a n d internal wiring b y fixing additional terminals/ f u s e b l o c k s o n the existing terminal boards of apparatus cases, c a b l e termination b o x e s e t c . T h e work includes fixing of all new cables by teakwood clamp o n teakwood base plank, varnishing all teakwood items, fixing of terminals/ fuse blocks, o n t h e existing terminal boards, drilling o f necessary holes, termination of cables, wiring, identification of cables using aluminium tags with letters punched neatly, as p e r approved circuit d i a g r a m a n d cable plan, p a i n t i n g of particulars on sleeves and also o n the inner side o f t h e doors of apparatus cases. After terminations are over, the side openings of apparatus case foundation shall b e closed with brick work, cement plastered, the inter- space filled with M sand up to base level and t h e bottom surface s h a l l b e s e a l e d with sealing compound. a)Termination o f cables o n 2 5 / 6 0 m m PBT terminals (existing location)(Per Unit = Per Terminal block) SALEM DIVISION-S AND T/SOUTHERN RLY
25.00 power cables a n d internal wiring b y fixing additional terminals/ f u s e b l o c k s o n the existing terminal boards of apparatus cases, c a b l e termination b o x e s e t c . T h e work includes fixing of all new cables by teakwood clamp o n teakwood base plank, varnishing all teakwood items, fixing of terminals/ fuse blocks, o n t h e existing terminal boards, drilling o f necessary holes, termination of cables, wiring, identification of cables using aluminium tags with letters punched neatly, as p e r approved circuit d i a g r a m a n d cable plan, p a i n t i n g of particulars on sleeves and also o n the inner side o f t h e doors of apparatus cases. After terminations are over, the side openings of apparatus case foundation shall b e closed with brick work, cement plastered, the inter- space filled with M sand up to base level and t h e bottom surface s h a l l b e s e a l e d with sealing compound. b)Termination o f cables on PBT fuse block (existing location)(Per Unit = Per Fuse block)
600.00 o f t h e following capacities, o n existing battery stand/ RCC slabs in the battery room. T h e w o r k involves charging of secondary cells, fi x i n g a n d connecting the batteries with strips, manufacture and fixing of t e a k w o o d t e r m i n a l b o x , termination of c a b l e s , w i r i n g w i t h s u i t a b l e w i r e PVC 7/1.40mm a n d 3/0.75mm c o p p e r through suitable PVC pipes/ casing properly clamped, provision o f battery particulars board made of phynolic sheet 6mm thick of size 900mm x 1200mm with Aluminium grooved channel frame in the relay room. The particulars shall b e digitally using good quality "laminated gum sheet, provision of hydrometer -1 No. on a stand and battery tester-1 No. Charging of secondary cells shall b e d o n e b y the contractor through reputed agencies.(Supply of secondary cells is not covered in this schedule). [Teakwood plank 25mm thick for manufacturing termination box with locking facility, w i r e P V C 7/1.4mm a n d 3/0.75mm copper, anti-corrosive paint, varnish, PVC pipes/ casing, a n d a l l other miscellaneous materials required f o r t h i s w o r k s h a l l be supplied by the contractor]." a) Installation o f 2 V- 3 0 0 A H c e l l o n existing stand / slabs(Per Unit = Per Cell) SALEM DIVISION-S AND T/SOUTHERN RLY
869.41 o f t h e following capacities, o n existing battery stand/ RCC slabs in the battery room. T h e w o r k involves charging of secondary cells, fi x i n g a n d connecting the batteries with strips, manufacture and fixing of t e a k w o o d t e r m i n a l b o x , termination of c a b l e s , w i r i n g w i t h s u i t a b l e w i r e PVC 7/1.40mm a n d 3/0.75mm c o p p e r through suitable PVC pipes/ casing properly clamped, provision o f battery particulars board made of phynolic sheet 6mm thick of size 900mm x 1200mm with Aluminium grooved channel frame in the relay room. The particulars shall b e digitally using good quality "laminated gum sheet, provision of hydrometer -1 No. on a stand and battery tester-1 No. Charging of secondary cells shall b e d o n e b y the contractor through reputed agencies.(Supply of secondary cells is not covered in this schedule). [Teakwood plank 25mm thick for manufacturing termination box with locking facility, w i r e P V C 7/1.4mm a n d 3/0.75mm copper, anti-corrosive paint, varnish, PVC pipes/ casing, a n d a l l other miscellaneous materials required f o r t h i s w o r k s h a l l be supplied by the contractor]." b)Installation of 2V-200AH cell o n existing stand/ slabs(Per Unit = Per Cell)
491.59 following capacities i n apparatus cases, connecting them with strips, wiring with wire PVC 3/0.75mm copper and termination. This work also includes charging of cells through r e p u t e d agencies. The details of the batteries shall be written on the inside of the doors of the apparatus cases.(Supply of secondary cells is not included in this schedule).[Wire PVC 3/0.75mm copper, connecting s t r i p s , p a i n t a n d a l l other miscellaneous materials required f o r the work shall be supplied by the Contractor]. b)Installation of 2V-40/80AH cells in apparatus cases(Per Unit = Per Cell)
2000.00 Crossing/Road Cutting/Trenches
5.00 different types including tail cables, carefully without causing any damage, accounting and stacking them neatly at a place as instructed by Railway representative at site.
50.00 H a l f / Quarter s i z e ) without d a m a g e after releasing the shelf planks, Terminal blocks, Fuse Blocks, Terminal Boards, Relays o f all t y p e s E K T s , S e c o n d a r y Cells, power equipments, ' E ' t y p e l o c k s , e t c . , and breaking t h e c o n c r e t e foundation. After releasing, the resultant pits are to be closed and consolidated by ramming and levelling. T h e released materials shall b e accounted a n d stacked a t a p l a c e a s instructed by Railway representative at site. SALEM DIVISION-S AND T/SOUTHERN RLY
15.00 e x i s t i n g c a b l e termination b o x e s , after releasing t h e base plank, Terminal blocks, F u s e Block s, Terminal Boards, c u t rails, pipes, etc., closing t h e resultant p i t s and consolidating i t b y ramming a n d levelling. T h e released materials shall b e accounted and stacked neatly at a place as instructed by Railway representative at site.
50.00 light Signals complete (upto 4 aspects) with o r w i t h o u t R o u t e Indicators, c a l l i n g on signals, shunt signals etc., carefully without any damage to the gadgets, accounting and stacking them neatly at a place as instructed by Railway representative at site. T h e work includes breaking t h e concrete foundation,closing t h e resultant p i t and resurfacing it by ramming and levelling.
2698.69 m a c h i n e s ( a l l t y p e s ) i n c l u d i n g ground connections and other accessories available c o m p l e t e w i t h o u t a n y d a m a g e t o the gadgets, accounting a n d s t a c k i n g them neatly a t a place a s instructed b y Railway representative at site.
5.00 signals along with surface base, signal post e t c c a r e f u l l y w i t h o u t a n y damage, accounting a n d stacking the m neatly a t a p l a c ea s instructed b y Railway representative a t s i t e . T h e w o r k also includes breaking a n d removal o f concrete foundation a n d refilling o f t h e resultant pit by ramming and levelling."
100.00 S & T gears by deputation of Days Helpers/Unskilled Labour for executing additional S & T portion o f t h e works. The w o r k can involve fixing, releasing, dismantling, replacement,excavation, clearing of vegetation, loading and unloadingof material and assisting skilled persons etc as per instruction of Railway representative.
50.00 S & Tg e a r sb y d e p u t a t i o n of Days Fitter/Wireman/Painter/Welder/ Mason/Cable Jointer (Skilled Labour or Technician ) etc., f o r executing additional S & T p o r t i o n of w o r k s . T h e w o r k c a n i n v o l v e fixing, releasing, dismantling, replacement, painting or alteration o f various signallilng assets or parts, termination of cables, minor patch work on damages at location box, Plastering, Concreting b r i c k w o r k , wiring alterations, cable j o i n t i n g e t c a s per instruction of Railway representatives at size.
2000.00 r o a d a s p e r t h e instructions o f Railway representative a t s i t e . T h e w o r k also i n c l u d e s l o a d i n g a n d u n lo a d in g o f the materials a)Transportation o f Signalling materials upto 100kms
1000.00 than 100km SALEM DIVISION-S AND T/SOUTHERN RLY
20.00 other machineries for regarding and levelling the formation, dismantling any infringing structures, clearing and removing debris etc., w i t h a l l l e a d s a n d l i f t s etc., complete and a s p e r t h e instruction of Railway representative at site. Total 53495142.75
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC April 2022
ATTACHMENT
ACS110correctionslip.pdf
ATTACHMENT
Policeverification.pdf
ATTACHMENT
ModelformofBankGuarantee.pdf
ATTACHMENT
LetterofCreditRBLr_1.pdf
ATTACHMENT
JPODETAILS.pdf
ATTACHMENT
TenderdocumentFinal2_1.pdf
ATTACHMENT
GCCACSno.11New13.03.2026_compressed.pdf Correction slip 11
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
GCCACSno.11New13.03.2026_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid