Loading…
Loading…
Tender Value
₹8.6 Cr
EMD Value
₹17.2 L
Closing Date
30 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
SIGNAL
15 conditions · 3 needing a document upload
For works costing more than Rs.50 Lakhs:The tenderer must have minimum average annual contractual turnover of V/N or "V" whichever is less; where V = Advertised value of the tender in crores of Rupees. N = Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB in GCC APRIL 2022, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Non submission of the above, the offer will be summarily rejected. (Ref : Advance Correction Slip No.1 dt:14/07/2022 to IRSGCC- 2022 ).
Option for Payment: An option is available that the Supplier/Contractor to take payment from Railways through Letter of Credit (LC) arrangement, having the estimated value of Rs.10 Lakhs and above. All the suppliers/contractors are requested to make use of this facility from Railways.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. Note for Item 10.1: Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organization, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
"Any signal interlocking works involving EI or RRI or PI or IBS or IBH or LC gate or yard modification or UFSBI or Track circuit (AFTC or DC TC) or Axle Counter (SSDAC or MSDAC or HASSDAC)or Automatic signalling"
17 conditions · 3 needing a document upload
All the tenderers/Contractors have to deposit Earnest Money Deposit (EMD) & Tender Document Cost (TDC), in respect of e- tendering, should be accepted through net banking or payment gateway only. Fixed Deposit Receipt (FDR) will not be accepted as EMD for tenders invited on IREPS (e-tender portal). When submitted in physical form, the Tenderer shall upload scanned copies of financial instruments such as EMD, Tender form cost, mandatory credentials such as experience, turn over certificates and any other documents as applicable. All documents related to Partnership deed/Joint venture/ Consortium/ MOU, duly signed by the notary public, should be uploaded at the time of submission of bid S&T/SA failing which offer will be summarily rejected.
Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
I/We also hereby agree to abide by the Indian Railways Standard General Conditions Of Contract, with all correction slips up-to- date and to carry out the work according to the Special Conditions of Contract and Specifications of materials and works as laid down by Railway in the annexed Special Conditions/Specifications, Schedule of Rates with all correction slips up to date for the present contract
I/We have read the various conditions to tender attached hereto and agree to abide by the said conditions
I/We also agree to keep this tender open for acceptance for a period of 60 days from the date fixed for opening the same.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
I/We have read the various conditions attached/ referred to in this tender document, and agree to abide by the said conditions.
Deployment Of Qualified Engineers At Work Sites By The Contractor. The contractor shall also employ Qualified Graduate Engineer or Qualified Diploma Holder Engineer, based on value of contract, as may be prescribed by the Ministry of Railways through separate instructions from time to time.(As per RB ltr no.2012/CE-I/CT/O/20 dt:10.05.2013)
One qualified Graduate Engineer when the cost of the work is Rs. 200 lakhs and above.
One qualified Diploma holder Engineer when the cost of the work 9.1.1 to be executed is more than Rs.25 lakhs but less than Rs.200 lakhs.
In case the contractor fails to employ the technical staff as aforesaid, he shall be liable to pay a an amount of Rs.40,000/ (Rupees Forty thousand) for each month or part thereof for the 9.1.2 default incase of Graduate Engineer and Rs.25,000/- (Rupees Twenty five thousand) for each month or part thereof for the default in case of Diploma holder (Engineer)
In case of more than one L-1 bidders, tender may be awarded to tenderer having higher Bid Capacity. In case Bid Capacity is also the same, tenderer having done more value of similar work in last three previous financial years and the current financial year upto the date of opening of the tender, may be selected for the award. Instructions with respect to Bid Capacity will follow.
All the contracts on works/goods/services will be subject to the new GST act as applicable from time to time. Contractors have to register themselves with GST authorities and to furnish the GST registration number in order to process the bills from 01.7.2017
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
I/WE also hereby agree to abide by the INDIAN RAILWAY GENERAL CONDITIONS OF CONTRACT- APRIL 2022, with all correction slips up to date and to carry out the works accordingly.
In the e-tendering process, it is mandatory that every tenderer/contractor/firm registered with WWW.IREPS.GOV.IN to submit your bank details i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, and PAN Number
SALEM DIVISION: Replacement of overaged/ obsolete S&T gears & other associated works over Salem Division
SA-SG-120-I-OT-08-2026
SA-SG-120-I-OT-08-2026
Open
Works - General
12 Months
Salem, Tamil Nadu
₹0
₹17.2 L
30 Jul 2026
7 Jul 2026
16 Jul 2026
74 items across 1 schedule · ₹5,34,95,142.75 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Wiring o f Relay Inputs t o Wago Block and Wago block to Datalogger. Necessary Wagos required is included as per schedule | Per Unit | 200.00 | 285.86 | 57,172 |
| 2 | Wiring of Analog Voltages from IPS Room to Datalogger. Necessary Wa g o s required is included as per schedule | Numbers | 50.00 | 285.86 | 14,293 |
| 3 | Supply of 8-Channel Earth Leakage Detector as per RDSO Specifications RDSO/SPN/256/2002 or latest | Numbers | 24.00 | 1,10,759.06 | 26,58,217.44 |
| 4 | Supply of IPS to suit 4 Line RE station as per RDSO Specifications RDSO/SPN/165 or latest, (This schedule does not include Batteries) As per drawing enclosed | Numbers | 3.00 | 12,76,951.75 | 38,30,855.25 |
| 5 | Supply o f Low maintenance secondary cells o f t h e following capacities w i t h necessary inspection a s p e r specification/ drawing/ description enclosed in this document.b)Supply o f Secondary cells - 2V- 80AH capacity | Numbers | 1650.00 | 3,379.2 | 55,75,680 |
| 6 | Supply o f Low maintenance secondary cells o f t h e following capacities w i t h necessary inspection a s p e r specification/ drawing/ description enclosed in this document.d)Supply o f Secondary cells - 2V- 200AH capacity | Numbers | 1800.00 | 7,040 | 1,26,72,000 |
| 7 | Supply o f Low maintenance secondary cells o f t h e following capacities w i t h necessary inspection a s p e r specification/ drawing/ description enclosed in this document. e) S u p p l y o f Secondary c e l l s - 2V-300AH capacity | Numbers | 600.00 | 9,574 | 57,44,400 |
| 8 | Supply of track feed battery charger IRS:S 89-2013 | Numbers | 200.00 | 4,375.25 | 8,75,050 |
| 9 | Supply of 'B type choke IRS:S 65-83 | Numbers | 800.00 | 2,855.6 | 22,84,480 |
| 10 | Installation o f 8-Channel E a r t h Leakage Detector. T h i s includes transportation of materials t o Site location a n d provision of c a b l e t r o u g h a r r a n g e m e n t s including c o n n e c t i o n t o t h e B R C e a r t h . Also includescarrying out of pre-commission checklist. | Numbers | 24.00 | 11,320 | 2,71,680 |
| 11 | Commissioning of IPS, this schedule includes arrangement o f O E M engineer f o r checking the Installation and carrying out adjustments o f I P S m odule s a n d submission o f Pre- commissioning checklist | Set | 3.00 | 59,000 | 1,77,000 |
| 12 | Installation, wiring and testing of IPS as per RDSO Specification No. RDSO /SPN /165 or latest.This work includes transporting the IPS from the Stores by loading without any damages and installation of the same at site. This also includes wiring of all modules, proper earthing of equipments and all other w o r k s c o n n e c t e d f o r t e s t i n g and commissioning o f t h e s a m e . Necessary p o w d e r e d c o a t e d A l u m i n i u m ladder arrangements including cable trench, pipes, bolts, a n d other accessories i s included in this schedule.[Earthing is not covered under this schedule] | Set | 3.00 | 77,160.07 | 2,31,480.21 |
| 13 | Laying of STP/OFC/Power Cable/ switch board (10 pair/ 20 pair/50 pair) Cables in 1" PVC conduit/case caping a n d clamping on the w a l l / Ro o f t o p s / S h e l t e r s w i t h suitable clamping a n d h o s e t o b e provided where e v e r b e n d s / c u r v e s ( P V C conduit/ Case capping and other accessories to be supplied by the contractor) | Metre | 750.00 | 37.3 | 27,975 |
| 14 | Excavation of cable trench in all kinds of soil except hard rocky areas including clearing of roots of trees, rocks, bushes etc. to a depth of 1.0 Mtrs and to a width of 0.3 Mtrs. (Laying o f cables i s n o t included i n this schedule) | Metre | 2000.00 | 64.1 | 1,28,200 |
| 15 | Removing/breaking of existing RCC slabs on the Passenger Platform, trenching to a depth o f 0 . 6 m t o accommodate t h e additional cables, replacing the slabs removed after the cables are laid and replastering with cement mortar, refilling the trench by ramming and consolidating i t a s p e r the instructions of Railway Representatives at site. (Laying of cables is not included in this schedule). | Metre | 100.00 | 314.41 | 31,441 |
| 16 | Excavation of trench along route of existing c a b l e d u c t , o p e n i n g t h e s l a b s to a c c o m m o d a t e a d d i t i o n a l c a b l e laying, REPOSITIONING the slabs removed after the cables are laid and PLASTERING with cement mortar, and refilling the trench by ramming and consolidating it as per the instructions of Railway Representatives at site. (Laying of cables i s n o t included i n t h i s schedule.) [Cement,M Sand and all other miscellaneous materials required f o r the work shall be supplied by the Contractor]. | Metre | 500.00 | 161.92 | 80,960 |
| 17 | Excavation of trench to a depth of 1 Mtr. for track crossing of cables, refilling of trench by ramming and consolidating i t a s per the instructions of Railway representative at site a f t e r l a y i n g o f D W C / RC C p i p e s . During excavation o f trench, i t h a s t o b e ensured that the excavated soil does not mix with the ballast available. T h e depth o f 1 m trench shall be from the bottom of sleepers for track crossings. Laying of cables and DWC pipes is not included in this schedule. (Supply of DWC/RCC pipes with couplers/collars is not included in this schedule). | Metre | 120.00 | 385.45 | 46,254 |
| 18 | Provision of GI pipes (50/100mm dia) for cable laying with offset at both ends and with couplings over RCC bridges, drainage, culverts, and girder bridges. For RCC bridges, drainage, and culverts, the pipes shall be mounted on concrete masonry supports of size 300mm x 300mm x 300mm at an interval of 2 meters. For girder bridges, the pipes shall be fixed on suitable MS clamps at an interval of 2 meters. The ends of the pipes shall be closed with brick masonry abutments to ensure that no cable is exposed. The work shall be carried out as per the instructions of the Railway representative at the site.(Supply of GI pipes with couplings and laying of cables is not included in this schedule).Stone jelly (20/25mm size), bricks, sand, cement, MS angles, flats, bolts, nuts for manufacturing and fixing clamps, bricks, M sand, cement, and other miscellaneous materials for the work shall be supplied by the contractor. | Metre | 120.00 | 208.54 | 25,024.8 |
| 19 | Provision o f G I p i p e s (50/100mm d i a ) for cable laying in hard rocky area with off sets a t b o t h e n d s d u l y supported b y concrete blocks of size 300mm x 300 mm x 300 mm at an interval of 2m. The ends of the pipes s h a l l b e c l o s e d w i t h b r i c k masonry abutments work so that no cable is exposed, T h e w ork shall be carried o u t a s p e r the instructions of Railway representative at site.(Supply of GI pipes with couplings and laying of cables is not included in this schedule).[Stone jelly of size 20/25mm, bricks, sand, cement, a n d a l l other miscellaneous materials required f o r the work shall be supplied by the Contractor]. | Metre | 60.00 | 182.87 | 10,972.2 |
| 20 | L a y i n g o f signaling/power/ telecommunication cables a s per cable plan in cable trenches, masonry ducts, RCC Pipes, DWC pipes, GI Pipes etc.(Supply of cables is not included in this schedule). | Metre | 3000.00 | 18.18 | 54,540 |
| 21 | "Refilling of cable trench 1m depth by 0.3m width throughout, with earth after laying of cables, a n d consolidating t h e t r e n c h by ramming and levelling." | Metre | 2000.00 | 15.4 | 30,800 |
| 22 | "Digging of pit to a depth of 800mm of size 3 0 0 m m X 3 0 0 m m , c a s t i n g o f concrete foundation o f size 300mmX300mmX300mm and Placing of RCC cable markers on top of t h e foundation a n d refilling t h e p i t and consolidating i t b y ramming. T h e cable markers shall be provided at an interval of 20 M t r s . w i t h i n statio n l i m i t s a n d 5 0 Mtrs. outside station limits throughout t h e cable r o u t e , d i v e r s i o n s a n d a l s o a t every track/road crossing." | Numbers | 50.00 | 123.35 | 6,167.5 |
| 23 | " Ro a d crossing/ Tr a c k C r o s s i n g through Horizontal Drilling at approximately depth of 1.5 to 2 m below the formation level of the earth including insertion of HDPE pipe/DWC pipe along with couplers, drawl of cable (or) direct drawl o f cables etc. (Note: T h e pilot used for HDD should be of sufficient size to s u i t insertion o f H D P E / D W C p i p e o f size 120mm (outer dia.) or direct drawl of three cables (Signalling/Power/Quad/OFC) or three nos.of 4 0 m m d i a HDP E pipe o r a n y other combination a s d i r e c t e d b y t h e site engineer) ( S u p p l y o f H D P E p i p e i s not covered in this schedule)" | Metre | 30.00 | 1,351.45 | 40,543.5 |
| 24 | Supply of Main LED Signal Aspect - Green as p e r R D S O Specifications No.RDSO/SPN/199/2010 Rev1.1 or latest | Numbers | 90.00 | 10,030 | 9,02,700 |
| 25 | Supply of Main LED Signal Aspect - Yellow as per RDSO Specifications RDSO/SPN/199/2010 Rev1.1 or latest | Numbers | 90.00 | 8,850 | 7,96,500 |
| 26 | Supply of Main LED Signal Aspect - Red as per RDSO Specifications RDSO/SPN/199/2010 Rev1.1 or latest | Numbers | 90.00 | 9,233.5 | 8,31,015 |
| 27 | Supply o f subsidiary Signal Aspect - Route L E D a s p e r R D S O Specifications SPECIFICATION N O . RDSO/SPN/153/2023 Revision 5.0 or latest | Numbers | 120.00 | 5,703.33 | 6,84,399.6 |
| 28 | Supply o f subsidiary Signal Aspect - Shunt L E D a s p e r R D S O Specification SPECIFICATION N O . RDSO/SPN/153/2023 Revision 5.0 or latest | Numbers | 120.00 | 5,740.7 | 6,88,884 |
| 29 | Supply o f Multi Lamp Route indicator (LED Double Digit) fro m 1 t o 9 w i t h white LED (With Housing) as per technical specification | Numbers | 10.00 | 64,900 | 6,49,000 |
| 30 | Supply of Signal post telephone with facility o f p a g i n g a n d talk-back including voice communication e q u ip m e n t w i t h suitable switching arrangement a t t h e Signal post a n d a t S M ' s r o o m a s p e r specification enclosed i n t h i s document. T h i s includes drawl of tail cable through GI pipe 25mm dia and 2 mtrs long duly clamped to Signal post with bend as required at site, termination of tail cable at one end in the apparatus case and other end in the console. In the SM's room, console shall be fixed on a table top. T h e wiring shall b e d o n e using wire PVC 16/0.2mm copper. [Talk-back equipment complete including housing box , w i r e PVC 16/0.20mm a n d all other miscellaneous materials required for the w o r k s h a l l be supplied by the Contractor]. | Numbers | 75.00 | 11,897.35 | 8,92,301.25 |
| 31 | S u p p l y o f p l u g - i n t y p e , S t y l e QL1, Magnetically Latched Neutral Line 2 4 V DC, 11F/4B contacts Relay complete w ith plug board (base plate), connectors and retaining clips and conforming to BRS 935A and RDSO S p n . N o I R S S 3 4 a n d S - 2 3 o r latest. The interlocking c o d e f o r t h i s u n i t s h a l l be "ABDEG" | Numbers | 30.00 | 7,076.52 | 2,12,295.6 |
| 32 | Supply of Plug in Type Q-Series Relay QBAT (2F/2B)(Miniature, Tr a c t i v e a r m a t u r e , AC I m m u n e , D . C B i a s e d Tr a c k Re l a y ) A.C. immunity level o f 8 0 Volt A.C, coil nominal resistance o f 9 O h m s , confirming t o BRS s p e c n o . 9 3 9 A & 9 6 6 F 2 a n d RDSO specification N o . 8 4 / 8 8 o r latest. The interlocking c o d e f o r t h i s u n i t s h a l l be "ABEJX" | Numbers | 30.00 | 9,858.79 | 2,95,763.7 |
| 33 | Supply of electronic time delay units (120/60 s e c s ) w i t h p l u g boards, connectors and retaining clips with necessary inspection as p e r specificatio n/ d r a w i n g / description enclosed in this document. | Numbers | 150.00 | 2,742.03 | 4,11,304.5 |
| 34 | Supply of lamp proving relays(QECX-61) for a)LED aspects with plug boards, connectors and retaining clips with necessary inspection as per specification/ | Numbers | 180.00 | 5,901.5 | 10,62,270 |
| 35 | Supply of QBCA1 - heavy duty contact relays w i t h necessary inspection a s per specification/ | Numbers | 75.00 | 6,613.75 | 4,96,031.25 |
| 36 | Supply o f Q TA 2 - t r a c k r e l a y s w i t h plug boards, connectors a n d retaining clips with necessary inspection as per specification | Numbers | 100.00 | 4,070 | 4,07,000 |
| 37 | Supply o f Electric k e y transmitter - rotary type o f required ward Nos. with keys, with necessary inspection a s p e r specification/ drawing/ | Numbers | 90.00 | 6,344.8 | 5,71,032 |
| 38 | Carrying o u t alterations t o t h e existing relays in the relay racks/apparatus cases as per the approved circuit diagram using wire P V C 16/0.2mm copper. T h e w o r k includes p a i n t i n g alterations a n d r e l e a s i n g the unwanted wires carefully without disturbing the existing wiring.[Wire P V C 16/0.2mm c o p p e r , soldering materials, bunching t h r e a d s , condensers, resistances and teakwood plank for fixing them and all other miscellaneous materials required f o r the work shall be supplied by the Contractor]. | Per Relay | 250.00 | 695.67 | 1,73,917.5 |
| 39 | Supply of TCIP Module /Networking card for interfacing t h e Fi r e A l a r m a n d Detection systems | Numbers | 4.00 | 30,881.44 | 1,23,525.76 |
| 40 | Supply of Track Feed Resistance | Numbers | 1300.00 | 287.77 | 3,74,101 |
| 41 | Supply of E-Type Locks | Numbers | 250.00 | 1,234.88 | 3,08,720 |
| 42 | Supply o f magneto telephone handle type and supply o f Ni-cad power pack 4V-2.2AH with charger to work on 110VAC | Numbers | 120.00 | 8,106.7 | 9,72,804 |
| 43 | Supply of ND Fuse of various capacities (Per unit=Per fuse) | Per Unit | 6000.00 | 37.74 | 2,26,440 |
| 44 | E x c a v a t i o n o f p i t , e r e c t i o n o f cable termination boxes on rails and concreting as per Drg. No.SG/CN/02/8, drilling of suitable holes in the box, fixing of 2 Nos. of GI pipes 32mm dia a n d 300mm long a t t h e bottom with clamp nuts - 12 mm thick, one at the inner side and another at the outer side for each pipe f o r cable entry a n d o n e G I pipe 150mm long 32mm dia for drawl of jumper w i r e s f o r P o i n t machines e t c . , fi x i n g of hardwood plank 37mm thick on the bottom, provision of one EWS lock, and painting the boxes inside a n d outside w ith o n e coa t of red-oxide and two coats of aluminium paints. | Numbers | 15.00 | 5,029.69 | 75,445.35 |
| 45 | Installation of combined type point machine- I R S t y p e a n d c o n n e c t i n g a l l ground connections including wiring and termination i n p o i n t m a c h i n e a n d interconnections between point machine and CT box through PVC hose pipe with 3/0.75mm and 7/1.40mm copper wire and painting. This work includes provision o f insulation to stretcher bars, throw b a r l u g a n d "D" bracket wherever required, cutting of notches on the point machines covers to suit crank handle configuration.(Combined type point machine with ground connection, uninsulated stretcher bar, throw bar lug and 'D' brackets will be supplied by Railways.[All types of insulations connected to point work, coal bengal, all type of bolts and nuts, washers spring/flat w ire P V C 7/1.4mm copper, PVC hope pipe, paints, PVC/nylon sleeves and all other miscellaneous materials required for t h e w o r k s h a l l b e s u p p l i e d by the Contractor]. | Numbers | 148.00 | 16,383.88 | 24,24,814.24 |
| 46 | Excavation of pit,casting concrete foundation as per Drg.No.SG/CN/02/9 using metallic templates, for erection of colour light signals up to 4 aspects.[Foundation bolts, cement, M sand, stone jelly of size 20/25mm dia and all other miscellaneous materials required for the work shall be supplied by the Contractor]. | Numbers | 30.00 | 9,213.28 | 2,76,398.4 |
| 47 | "Erection o f s u r f a c e b a s e , s i g n a l pole, mounting o f c o l o u r l i g h t s i g n a l u p t o 4 aspects complete o n S i g n a l p o l e / Off-set bracket, ( f o r L E D / fi l a m e n t b u l b s ) with lenses, t r i p l e p o l e l a m p holde r, filament switching u n i t s , C L S transformer, current regulators (whichever is applicable), fixing of ladder w i t h p l a t f o r m c o m p l e t e and concreting o f ladder shoe, fixing o f number plates, marker board, lens guard, fixing of s p e e d l i m i t b o a r d w h e r e v e r necessary, termination o f tail cables, wiring o f signal u n i t w i t h P V C w i r e 3 / 0 . 7 5 m m copper, provision of EWS locks, and painting of one c o a t o f r e d o x i d e a n d t w o c o a t s of aluminium/ enamel paints. When the aspect is fixed on Offset bracket using 'U' bolts and nuts, a through bolt shall b e provided by drilling a hole i n t h e signal pole t o prevent the offset bracket from sliding down.(Supply of surface base, Offset bracket, CLS pole, C L S aspects complete, ladder with shoes and platform, Speed limit board, LED aspects, current regulators, l a m p holders, l a m p s , filam e nt switching u n i t a n d CLS transformer is not covered in this schedule). ['U' bolts and nuts, through bolts and nuts, cement, stone jelly 20/25mm dia , M sand, S i g n a l C o l l a r R i n g s , w i r e P V C 3/0.75mm copper, lens-guard, all fixing bolts and nuts, l e a d w o o l , p a i n t s P V C / N y l o n sleeves, enameled number plates. enameled marker b o a r d s , E W S l o c k s , a n d a l l other miscellaneous materials for the work shall be supplied by the Contractor]." | Numbers | 36.00 | 8,287.08 | 2,98,334.88 |
| 48 | "Excavation o f p i t a n d casting concrete foundation as per Drg, No.SG/CN/02/10 using metallic templates, f o r erection of ground type colour light shunt signal. [Foundation bolts and nuts, cement, M sand, stone jelly of size 20/25mm and all other miscellaneous materials for the work shall be supplied by the Contractor]." | Numbers | 5.00 | 4,645.17 | 23,225.85 |
| 49 | "Erection o f G r o u n d t y p e s h u n t signal complete including surface base, signal pole, L E D aspects/ lense s, b u l b s w i t h holders (whichever i s applicable), fi x i n g o f lens guards, number plate, termination o f tail cables, wiring o f signal unit w ith P V C wire 3/0.75mm copper, provision o f E W S locks and painting of one coat of red oxide and two coats of Aluminium/ enamel paint.(Supply of Ground type shunt signal complete including surface base, signal pole, LED aspects, holder, bulbs, and lenses is not covered in this schedule).[Wire PVC 3/0.75mm copper, lens guards, E W S locks, Enameled number plates, bolts and nuts, lead wool, paints and all other miscellaneous materials shall be supplied by the Contractor]." | Numbers | 5.00 | 3,170.44 | 15,852.2 |
| 50 | Fixing of Offset brackets using 'U' bolts and nuts, erection o f P o s t t y p e shunt Signals, termination o f tail cables a n d wiring using wire PVC 3/0.75mm copper, provision of EWS lock and painting o f one coat o f red-"oxide and two coats of aluminium/ enameled paint. The work also includes drilling suitable holes o n t h e C L S post a n d provision o f a through bolt with nut to prevent the Off- setbracket from slipping down." | Numbers | 10.00 | 2,306.03 | 23,060.3 |
| 51 | Fi x i n g a n d w i r i n g o f M u l t i l a m p route indicator[Fixing bolts and nuts, EWS locks wires PVC 3/0.75mm & 16/0.2mm copper, wire mesh, PVC/Nylon sleeves, paints and all other miscellaneous materials shall be supplied by the Contractor] | Numbers | 5.00 | 4,507.99 | 22,539.95 |
| 52 | Fixing o f junction type route indicators - 1 way to 6 ways - complete/ fixing of additional l i m b t o t h e e x i s t i n g route indicators, termination o f t a i l cables, wiring as per approved circuits diagram using wire PVC 3/0.75mm copper, provision of required No of EWS locks, wire mesh, and painting. (Supply o f junction type Route Indicators - complete and additional limb is not covered in this schedule).[3/0.75mm wire PVC, fixing bolts and nuts, EWS l o c k s , w i r e mesh, PVC/Nylon sleeves, paints and all other miscellaneous materials shall be supplied by the Contractor]. a)Fixing a n d w i r i n g of direction type route indicator - 1 way | Numbers | 5.00 | 2,238.04 | 11,190.2 |
| 53 | Fixing of Offset brackets using 'U' bolts and n u t s , erection o f Calling O n Signals/ 'A' marker lights, termination of tail cables and wiring u s i n g w i r e P V C 3/0.75mm copper, provision o f E W S l o c k , n u m b e r plates/ marker boards a n d painting. T h e work also includes drilling suitable holes o n t h e CLS post and provision of a through bolt with nut to prevent the Off-set bracket from slipping down.(Supply of Calling on Signal/ 'A' marker light, L E D aspects/holders & bulbs a n d Off set brackets is not covered in this schedule). ['U' bolts and nuts, through bolts with nut, w i r e P V C 3 / 0 . 7 5 m m c o p p e r , E W S lock, E n a m e l e d n u m b e r p l a t e s , w i r e mesh, PVC/Nylon sleeves, p a i n t s a n d a l l other miscellaneous materials shall be supplied by the contractor]. | Numbers | 10.00 | 2,081.25 | 20,812.5 |
| 54 | Releasing of existing tail cables and drawl of new tail cables for colour light signals up to four aspects with or without route indicator, post type shunt signal and Calling on signals, termination o f n e w tail cables and wiring u s i n g w i r e P V C 3/0.75mm copper. This work includes drawl of new tail cables into the signal post duly releasing the existing tail cables from the relevant signals a n d re-surfacing t h e e a r t h excavated as instructed by Railway representative at site. [Wire PVC 3/0.75mm copper, paints and all o t h e r miscellaneous m a t e r i a l s s h a l l be supplied by the Contractor]. | Per Unit | 50.00 | 1,524.86 | 76,243 |
| 55 | Termination o f n e w main/tail cables o n the existing terminals/ fuse blocks in apparatus c a s e s / b a t t e r y b o x e s / C T b o x e s / cable termination racks a s p e r approved circuit diagram. The terminal particulars a r e to be r e p a i n t e d /correc te d o n t h e d o o r s of a p p a r a t u s c a s e s / b a t t e r y b o x e s / cable termination boxes and FTOT index board as instructed by Railway representative at site. T h i s w o r k includes c l o s i n g t h e opening created f o r e n t r y o f n e w c a b l e s i n the apparatus cases w i t h masonry brick work a n d sealing t h e bottom o f t h e apparatus cases/ cable termination racks w i t h cable compound.[Paints, wire PVC 3/0.75mm and 16/0.2mm copper, sealing compound, bricks, cement, M sand and all other required miscellaneous materials shall be supplied by the contractor].(Per Unit = Per Terminal block) | Per Unit | 1000.00 | 73.59 | 73,590 |
| 56 | Termination o f m a i n , t a i l , Signaling and power cables and internal wiring on terminal/ fuse blocks i n n e w apparatus cases, cable termination b o x e s a n d i n gate Lodges excluding cable termination r a c k at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood b a s e p l a n k , fi x i n g o f Phynolic synthetic industrial fibre base fine weave cotton fibre board 6mm thick for terminal board to suit e a c h a p p a r a t u s c a s e , v a r n i s h i n g all teakwood items, fi x i n g o f terminals/ fuse blocks o n t h e terminal b o a r d , drilling of necessary h o l e s , termination o f cables, w i r i n g , identifica tio n o f c a b l e s using aluminium tags with letters punched neatly, a s p e r approved circuit diagram a n d cable p l a n , painting o f particulars o n sleeves andalso o n t h e inner side o f t h e doors of apparatus cases. After terminations are "over, the side openings o f apparatus case foundation shall b e closed with brick work, cement plastered, the inter-space filled with M sand u p t o b a s e level a n d t h e bottom s u r f a c e s h a l l b e s e a l e d w i t h sealing compound.(Supply of PBT terminals and Fuse blocks is not covered in this schedule)." a)Termination o n 25/60mm P B T terminals (new location)(Phynolic sheet)(Per Unit = Per Terminal block) | Per Unit | 500.00 | 172.14 | 86,070 |
| 57 | Termination o f m a i n , t a i l , Signaling and power cables and internal wiring on terminal/ fuse blocks i n n e w apparatus cases, cable termination b o x e s a n d i n gate Lodges excluding cable termination r a c k at relay room. The work includes fixing of all new cables by teakwood clamp on teakwood b a s e p l a n k , fi x i n g o f Phynolic synthetic industrial fibre base fine weave cotton fibre board 6mm thick for terminal board to suit e a c h a p p a r a t u s c a s e , v a r n i s h i n g all teakwood items, fi x i n g o f terminals/ fuse blocks o n t h e terminal b o a r d , drilling of necessary h o l e s , termination o f cables, w i r i n g , identifica tio n o f c a b l e s using aluminium tags with letters punched neatly, a s p e r approved circuit diagram a n d cable p l a n , painting o f particulars o n sleeves andalso o n t h e inner side o f t h e doors of apparatus cases. After terminations are "over, the side openings o f apparatus case foundation shall b e closed with brick work, cement plastered, the inter-space filled with M sand u p t o b a s e level a n d t h e bottom s u r f a c e s h a l l b e s e a l e d w i t h sealing compound.(Supply of PBT terminals and Fuse blocks is not covered in this schedule)." b)Termination o n P B T f u s e b l o c k (new location) (Phynolic sheet)(Per Unit = Per Fuse block) | Per Unit | 50.00 | 209.93 | 10,496.5 |
| 58 | Termination o f m a i n , t a i l , Signaling and power cables a n d internal wiring b y fixing additional terminals/ f u s e b l o c k s o n the existing terminal boards of apparatus cases, c a b l e termination b o x e s e t c . T h e work includes fixing of all new cables by teakwood clamp o n teakwood base plank, varnishing all teakwood items, fixing of terminals/ fuse blocks, o n t h e existing terminal boards, drilling o f necessary holes, termination of cables, wiring, identification of cables using aluminium tags with letters punched neatly, as p e r approved circuit d i a g r a m a n d cable plan, p a i n t i n g of particulars on sleeves and also o n the inner side o f t h e doors of apparatus cases. After terminations are over, the side openings of apparatus case foundation shall b e closed with brick work, cement plastered, the inter- space filled with M sand up to base level and t h e bottom surface s h a l l b e s e a l e d with sealing compound. a)Termination o f cables o n 2 5 / 6 0 m m PBT terminals (existing location)(Per Unit = Per Terminal block) | Per Unit | 100.00 | 151.09 | 15,109 |
| 59 | Termination o f m a i n , t a i l , Signaling and power cables a n d internal wiring b y fixing additional terminals/ f u s e b l o c k s o n the existing terminal boards of apparatus cases, c a b l e termination b o x e s e t c . T h e work includes fixing of all new cables by teakwood clamp o n teakwood base plank, varnishing all teakwood items, fixing of terminals/ fuse blocks, o n t h e existing terminal boards, drilling o f necessary holes, termination of cables, wiring, identification of cables using aluminium tags with letters punched neatly, as p e r approved circuit d i a g r a m a n d cable plan, p a i n t i n g of particulars on sleeves and also o n the inner side o f t h e doors of apparatus cases. After terminations are over, the side openings of apparatus case foundation shall b e closed with brick work, cement plastered, the inter- space filled with M sand up to base level and t h e bottom surface s h a l l b e s e a l e d with sealing compound. b)Termination o f cables on PBT fuse block (existing location)(Per Unit = Per Fuse block) | Per Unit | 25.00 | 188.86 | 4,721.5 |
| 60 | Charging and installation o f secondary cells o f t h e following capacities, o n existing battery stand/ RCC slabs in the battery room. T h e w o r k involves charging of secondary cells, fi x i n g a n d connecting the batteries with strips, manufacture and fixing of t e a k w o o d t e r m i n a l b o x , termination of c a b l e s , w i r i n g w i t h s u i t a b l e w i r e PVC 7/1.40mm a n d 3/0.75mm c o p p e r through suitable PVC pipes/ casing properly clamped, provision o f battery particulars board made of phynolic sheet 6mm thick of size 900mm x 1200mm with Aluminium grooved channel frame in the relay room. The particulars shall b e digitally using good quality "laminated gum sheet, provision of hydrometer -1 No. on a stand and battery tester-1 No. Charging of secondary cells shall b e d o n e b y the contractor through reputed agencies.(Supply of secondary cells is not covered in this schedule). [Teakwood plank 25mm thick for manufacturing termination box with locking facility, w i r e P V C 7/1.4mm a n d 3/0.75mm copper, anti-corrosive paint, varnish, PVC pipes/ casing, a n d a l l other miscellaneous materials required f o r t h i s w o r k s h a l l be supplied by the contractor]." a) Installation o f 2 V- 3 0 0 A H c e l l o n existing stand / slabs(Per Unit = Per Cell) | Per Unit | 600.00 | 1,077.53 | 6,46,518 |
| 61 | Charging and installation o f secondary cells o f t h e following capacities, o n existing battery stand/ RCC slabs in the battery room. T h e w o r k involves charging of secondary cells, fi x i n g a n d connecting the batteries with strips, manufacture and fixing of t e a k w o o d t e r m i n a l b o x , termination of c a b l e s , w i r i n g w i t h s u i t a b l e w i r e PVC 7/1.40mm a n d 3/0.75mm c o p p e r through suitable PVC pipes/ casing properly clamped, provision o f battery particulars board made of phynolic sheet 6mm thick of size 900mm x 1200mm with Aluminium grooved channel frame in the relay room. The particulars shall b e digitally using good quality "laminated gum sheet, provision of hydrometer -1 No. on a stand and battery tester-1 No. Charging of secondary cells shall b e d o n e b y the contractor through reputed agencies.(Supply of secondary cells is not covered in this schedule). [Teakwood plank 25mm thick for manufacturing termination box with locking facility, w i r e P V C 7/1.4mm a n d 3/0.75mm copper, anti-corrosive paint, varnish, PVC pipes/ casing, a n d a l l other miscellaneous materials required f o r t h i s w o r k s h a l l be supplied by the contractor]." b)Installation of 2V-200AH cell o n existing stand/ slabs(Per Unit = Per Cell) | Per Unit | 1800.00 | 869.41 | 15,64,938 |
| 62 | Installation of charged secondary cells of the following capacities i n apparatus cases, connecting them with strips, wiring with wire PVC 3/0.75mm copper and termination. This work also includes charging of cells through r e p u t e d agencies. The details of the batteries shall be written on the inside of the doors of the apparatus cases.(Supply of secondary cells is not included in this schedule).[Wire PVC 3/0.75mm copper, connecting s t r i p s , p a i n t a n d a l l other miscellaneous materials required f o r the work shall be supplied by the Contractor]. b)Installation of 2V-40/80AH cells in apparatus cases(Per Unit = Per Cell) | Per Unit | 1650.00 | 491.59 | 8,11,123.5 |
| 63 | Laying o f DWC/Split D W C Pipes f o r Track Crossing/Road Cutting/Trenches | Metre | 2000.00 | 42.46 | 84,920 |
| 64 | Releasing o f existing Ro u t e Indicators of different types including tail cables, carefully without causing any damage, accounting and stacking them neatly at a place as instructed by Railway representative at site. | Numbers | 5.00 | 1,541.51 | 7,707.55 |
| 65 | Releasing o f existing apparatus cases (Full/ H a l f / Quarter s i z e ) without d a m a g e after releasing the shelf planks, Terminal blocks, Fuse Blocks, Terminal Boards, Relays o f all t y p e s E K T s , S e c o n d a r y Cells, power equipments, ' E ' t y p e l o c k s , e t c . , and breaking t h e c o n c r e t e foundation. After releasing, the resultant pits are to be closed and consolidated by ramming and levelling. T h e released materials shall b e accounted a n d stacked a t a p l a c e a s instructed by Railway representative at site. | Numbers | 50.00 | 3,006.71 | 1,50,335.5 |
| 66 | Breaking o f concrete a n d releasing the e x i s t i n g c a b l e termination b o x e s , after releasing t h e base plank, Terminal blocks, F u s e Block s, Terminal Boards, c u t rails, pipes, etc., closing t h e resultant p i t s and consolidating i t b y ramming a n d levelling. T h e released materials shall b e accounted and stacked neatly at a place as instructed by Railway representative at site. | Numbers | 15.00 | 2,004.94 | 30,074.1 |
| 67 | Dismantling and releasing of existing Colour light Signals complete (upto 4 aspects) with o r w i t h o u t R o u t e Indicators, c a l l i n g on signals, shunt signals etc., carefully without any damage to the gadgets, accounting and stacking them neatly at a place as instructed by Railway representative at site. T h e work includes breaking t h e concrete foundation,closing t h e resultant p i t and resurfacing it by ramming and levelling. | Numbers | 50.00 | 3,083.03 | 1,54,151.5 |
| 68 | Dismantling a n d releasing o f existing Point m a c h i n e s ( a l l t y p e s ) i n c l u d i n g ground connections and other accessories available c o m p l e t e w i t h o u t a n y d a m a g e t o the gadgets, accounting a n d s t a c k i n g them neatly a t a place a s instructed b y Railway representative at site. | Numbers | 148.00 | 2,698.69 | 3,99,406.12 |
| 69 | "Releasing o f existing ground t y p e shunt signals along with surface base, signal post e t c c a r e f u l l y w i t h o u t a n y damage, accounting a n d stacking the m neatly a t a p l a c e a s instructed b y Railway representative a t s i t e . T h e w o r k also includes breaking a n d removal o f concrete foundation a n d refilling o f t h e resultant pit by ramming and levelling." | Numbers | 5.00 | 2,196.41 | 10,982.05 |
| 70 | Protection adjustments a n d re-instating of S & T gears by deputation of Helpers/Unskilled Labour for executing additional S & T portion o f t h e works. The w o r k can involve fixing, releasing, dismantling, replacement,excavation, clearing of vegetation, loading and unloadingof material and assisting skilled persons etc as per instruction of Railway representative. | Man- Days | 100.00 | 847.59 | 84,759 |
| 71 | Protection, adjustment a n d reinstating of S & T g e a r s b y d e p u t a t i o n of Fitter/Wireman/Painter/Welder/ Mason/Cable Jointer (Skilled Labour or Technician ) etc., f o r executing additional S & T p o r t i o n of w o r k s . T h e w o r k c a n i n v o l v e fixing, releasing, dismantling, replacement, painting or alteration o f various signallilng assets or parts, termination of cables, minor patch work on damages at location box, Plastering, Concreting b r i c k w o r k , wiring alterations, cable j o i n t i n g e t c a s per instruction of Railway representatives at size. | Man- Days | 50.00 | 1,073.45 | 53,672.5 |
| 72 | Transportation o f Signalling materials by r o a d a s p e r t h e instructions o f Railway representative a t s i t e . T h e w o r k also i n c l u d e s l o a d i n g a n d u n lo a d in g o f the materials a)Transportation o f Signalling materials upto 100kms | MT-Km | 2000.00 | 22.75 | 45,500 |
| 73 | Transportation o f Signalling materials more than 100km | MT-Km | 1000.00 | 13.91 | 13,910 |
| 74 | Engaging mechanical excavators like JCB or other machineries for regarding and levelling the formation, dismantling any infringing structures, clearing and removing debris etc., w i t h a l l l e a d s a n d l i f t s etc., complete and a s p e r t h e instruction of Railway representative at site. | Hour | 20.00 | 1,202.5 | 24,050 |
| Schedule total | ₹5,34,95,142.75 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC April 2022
ATTACHMENT
ACS110correctionslip.pdf
ATTACHMENT
Policeverification.pdf
ATTACHMENT
ModelformofBankGuarantee.pdf
ATTACHMENT
LetterofCreditRBLr_1.pdf
ATTACHMENT
JPODETAILS.pdf
ATTACHMENT
TenderdocumentFinal2_1.pdf
ATTACHMENT
GCCACSno.11New13.03.2026_compressed.pdf Correction slip 11
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
GCCACSno.11New13.03.2026_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .