Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹11.6 L (10.7%)Admitted-Finance 201 202 ANURAO HEIGHTS SHRUSTI PARK BANER BALEWADI ROAD PUNE 411045 | PUNE | PUNE | MAHARASHTRA | 411045 | ₹1.2 Cr+₹11.6 L (10.7%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹77.0 L (71.3%)Admitted-Finance 115 116 GANESH NAGAR HOSHANGABAD ROAD BHOPAL M P 462026 IN | BHOPAL | BHOPAL | MADHYA PRADESH | 462026 | ₹1.9 Cr+₹77.0 L (71.3%) | L3 | Admitted-Finance |
| 4 | L4₹2.5 Cr+₹1.4 Cr (131.5%)Admitted-Finance | ₹2.5 Cr+₹1.4 Cr (131.5%) | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | Thoughts Consultants Jaipur Pvt Ltd L1 | CivilMantra Infracon Private Limited L4 | MAPS GLOBAL CIVILTECH PVT. LTD. L2 | Manglam Infra & Engineering Limited L3 |
|---|---|---|---|---|---|---|---|
| 1.10Key Personnel | |||||||
| 1.11 | Team Leader cum Senior Highway Engineer | 3 | Month | 1,50,000 ₹4,50,000 | 2,80,000 ₹8,40,000 | 2,00,000 ₹6,00,000 | 55,000 ₹1,65,000 Lowest |
| 1.12 | Senior Bridge Engineer | 3 | Month | 1,00,000 ₹3,00,000 | 2,40,000 ₹7,20,000 | 1,75,000 ₹5,25,000 | 50,000 ₹1,50,000 Lowest |
| 1.13 | Highway cum Pavement Engineer | 3 | Month | 80,000 ₹2,40,000 | 2,40,000 ₹7,20,000 | 1,50,000 ₹4,50,000 | 50,000 ₹1,50,000 Lowest |
| 1.14 | Material-cum-Geotechnical Engineer- Geologist | 3 | Month | 80,000 ₹2,40,000 | 2,40,000 ₹7,20,000 | 1,50,000 ₹4,50,000 | 45,000 ₹1,35,000 Lowest |
| 1.15 | Senior Survey Engineer | 3 | Month | 60,000 ₹1,80,000 | 2,40,000 ₹7,20,000 | 1,00,000 ₹3,00,000 | 45,000 ₹1,35,000 Lowest |
| 1.16 | Traffic and Safety Expert | 2 | Month | 60,000 ₹1,20,000 | 3,00,000 ₹6,00,000 | 1,25,000 ₹2,50,000 | 45,000 ₹90,000 Lowest |
| 1.17 | Environmental Specialist | 1 | Month | 1,50,000 ₹1,50,000 | 3,00,000 ₹3,00,000 | 1,25,000 ₹1,25,000 | 45,000 ₹45,000 Lowest |
| 1.18 | Quantity Surveyor/ Documentation Expert | 3 | Month | 60,000 ₹1,80,000 | 2,20,000 ₹6,60,000 | 1,20,000 ₹3,60,000 | 45,000 ₹1,35,000 Lowest |
| 1.19 | Land Acquisition Expert | 3 | Month | 80,000 ₹2,40,000 | 2,20,000 ₹6,60,000 | 1,20,000 ₹3,60,000 | 45,000 ₹1,35,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
21 Apr 2025, 5:00 pmClosed
Chief Engineer National Highway (PW) Navi Mumbai
Office of the Chief Engineer National Highway (PW) Konkan Bhavan, Room No.526, 5th floor, Navi Mumbai
Consultancy Services for Detailed Project Report(DPR) for.. A) Proposed Udgir Bypass on NH-63 (Length 11.05km) B) Proposed ROB at Aashtamode (LC No.05 C) on NH-63. C) Proposed ROB at Pangaon (LC No.T-107) on NH-361H D) Proposed ROB at Wadval Nag
2025_MoRTH_850999_1
EENHD/Latur/Tender-1/DPR/417 dtd.27.02.2025
Open Tender
Civil Works
Works
90 days
Latur
As per tender documents
8 documents required · 8 mandatory
₹11,800
Bharatkosh
₹2 L
Office of the Chief Engineer National Highway (PW
17 Oct 2025
27 Feb 2025
22 Apr 2025
27 Feb 2025
21 Apr 2025
27 Feb 2025
27 Feb 2025 - 21 Mar 2025
27 Mar 2025
Amount
Key Personnel
Team Leader cum Senior Highway Engineer
Senior Bridge Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer- Geologist
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor/ Documentation Expert
Land Acquisition Expert
Utility Expert
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
Support Staff
Office Manager
Typist
Office Boy
Night Watchman
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For Consultant: Mahindra Bolero or Equivalent (Not more than 2 years old)
Innova or Equivalent (Not more than 2 years old) (Fixed Costs)
Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc.
VI. Office Supplies, Utilities and Communication ( Fixed Costs )
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment ( Rental )
Office Furniture and Equipment
VIII.Reports and Document Printing
Monthly Report (3 per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
IX Survey and Investigation
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology
B. Investigation (Fixed cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Sub Soil investigation (Boring)
a) Boring in all types of soil(other than hard rock)
b) Boring in hard rock
Any other investigations/surveys/drone survey
C. NET WORK SURVEY AND GPR
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Cost of supply and fixing boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Land acquisition Team including support staff and logistics/transportation
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
typist
Inland Travel in Home Country (Fixed Costs)
Airlines
Other Miscellaneous expenses (like DA, internal travel expenses other incidentals)
Income Tax (Expariate)( as per prevaling Norms)
Other Taxes / Duties (if any) Specify clearly
Goods & Service Tax( as per prevaling Norms)
MAPS GLOBAL CIVILTECH PVT. LTD. (BID ID -3203177)
Manglam Infra & Engineering Limited (BID ID -3204011)
CivilMantra Infracon Private Limited (BID ID -3202089)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .