Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹54.5 L
EMD Value
₹55,000
Closing Date
16 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA
DRDA, Collectorate Campus, Vengikkal, Tiruvannamalai
Tiruvannamalai District Providing Infrastructure Development works to AGAMT 2021-22 Village Panchayats at PARAMANANDAL Panchayat of CHENGAM Block in Package No. TVM/2021-22/123
2022_RDTN_239275_1
Roc.No.1250/2022/A13 Dt.22.06.2022 123
Open Tender
Civil Works
Lump-sum
180 days
chengam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹55,000
24 Aug 2022
4 Jul 2022
16 Aug 2022
4 Jul 2022
16 Aug 2022
4 Jul 2022
Amount
Part 1 : Rejuvenation of Kalakuttai With Construction of Outlet ,Bathing Ghat ,Baby Pond Lining Wall in Paramanandal Panchayat
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Provision for Bathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Baby Pond
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for inlet
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Outlet
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Name Board
Part II: Rejuvenation of Eswaran Kulam With Construction of Inlet and Outlet ,Bathing Ghat ,Baby Pond Lining Wall & Retaining Wall in Paramanandal Panchayat
Clearing light jungles including cost and conveyance of all materials and all labour charges etc., complete
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearan
Earth work excavation in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinaries and tippers including benching , breaking clods, sectioning etc.
Provision for Bathing Ghat
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Retaining Wall
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Baby Pond
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Provision for Inlet
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Oulet
Earth work excavation depositing on bank with initial lead and lift as per SS 20 B incl cost and conveyance of all charges etc complete
Sand filling with good river sand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
C.C.1:4:8 using 40mm stone jelly including cost and conveyance of all materials to site and cost of labour and all other incidental charges etc.,complete.
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
Providing and laying reinforced cement concrete pipe NP2 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry
Refilling Earth filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
Provision for Name Board
Part III:- Providing CC Pavement @ Kalainjar Nagar Cross Street 1 in Paramanandal Panchayat (77m)
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part IV : Providing CC Pavement @ Kalainjar Nagar Cross Street 2 in Paramanandal Panchayat (59m)
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part V : Providing CC Pavement @ Kalainjar Nagar Cross Street 3 in Paramanandal Panchayat (100m)
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part VI : Providing CC Pavement @ Kalainjar Nagar Cross Street 4 in Paramanandal Panchayat (74m)
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Provision for Bitumen Pad
Provision for Name Board
Part VII : Construction of Anganwadi Building @ Thiruvalluvar Nagar in Paramanandal Panchayat
Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,For Foundation
Supplying and Filling the U/S gravel from appd quarry including cost and conveyance and filling charges etc., as per std. Specification
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation
Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Column Upto Grade Beam
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Column from Grade Beam to Basement
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Column from Basement to Lintel
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Lintel Bottem Sides
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., Sunshade
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of old &new machine pressed tiles of size 20x20x2 mmusing Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Plastering with Cement Morter 1:3 mix 10 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Paving the Floor with Plain ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with Printed design glazed tiles of size 30 cm x20cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2 -10Sqm.
Fabrication and supply of mild steel Door of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete. Door1.00 x 2.10 m
Toilet door 0.75 X 2.10 m
Toilet door 1.10 X 2.10 m
Ventilator Size 0.90 X 0.45 m
Fabrication and supply of mild steel Window of any size with single leaf outer frame made of 35x35x5 mm equal M.S angle and shutter frame made of 25x25x5 mm M.S angle for horizontal and vertical member with stiffener and fully covered with 18 G plate etc complete. SZ:-1.20m x 1.30 m
Distembering two coats oil bound distember over priming coat inculding cost and conveyance of all materials to site and all loboure charges etc complete ( Inner wall )
Painting two coats with approved Plastic Emulsion paint over one coat of Primaring coat over cement plastered wall surface, ceiling and other new surface including cleaning, preparing the surface, curing, scaffolding charges etc., complete complying with standard specifications and as directed by the departmental officers. (S.I No. 359 B)
Painting two coat of new iron works such as steel Doors,windows,ventilators, etc., with best approved first quality of synthetic enamel paint of approved colour over the existing priming coats,ete.
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor cable of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 3 mm thick Hylum sheet cover with TW box And 5 A FT switch with continuous earth connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for PVC concealed Light point / fan point (For electronic Regulator) SD 20
Supply and fixing of 1200 mm ( 48") AC ceiling fan complete with stepped electronic 300 W regulator with 300 mm down rod on the existing clamp. SD 112
Wiring with 2 X 1.5 Sq.mm (22 / 0.3) PVC insulated SC unsheathed Copper conducutor of 1100V grade in suitable PVC rigid pipe concealed in wall and ceiling with PVC accessories inflush with wall with 150 mm X 100 mm X 113 mm TW switch box with 3 mm thick Hylum sheet cover for 5 A 3 pin non interlocking CS plug with continuous earth wire connection of 14 SWG TC wire for making good of the concealed portion with suitable colour for concealed PVC plug point SD 30
Supply and fixing of CFL bulb SD 80
Supply and fixing of Tube Light etc
Supply and fixing of 16 Amps DPIC Switch of 500 V with fuse and neutral (Side Handle) on suitable TW box PWD Earthing SD 142
Providing GI Pipe etc ( SD 69 )I
Supply and run of 2 of 1.50 sq.mm (22/0.30) PVC insulated SC unsheathed copper Conductor of 1100 V grade on 7/20GI bearer wire for service connection mains SD 64
Supply and fixing of CFL bulb SD 81
Supply and fixing of Rain water PVC pipe of 110mm dia
Supplying and fixing in position white / colour glazed European Water Closet of best quality and approved make with 100 mm "P" or "S" trap connecting with CI pipe of 100mm dia / PVC pipe of
Provision for Name Board
Part VIII : Construction of Thershing Floor @ Paramanandal Panchayat.
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Name Board
Part IX: Construction of Thershing Floor @ Gandhi Nagar in Paramanandal Panchayat.
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Name Board
Part X: Construction of Thershing Floor @ Pariyur in Paramanandal Panchayat.
Earth work excavation for foundation in all clauses of soils and subsoils to full depth as may be directed ,exept in hard rock requring blasting but inclusive of shoring ,shuttering with initial lead and lift etc.,including levelling the sites complete
Cement concrete 1:4:8 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete complying with standard specification
Cement concrete 1:3:6 using 40 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete.
Cement concrete 1:2:4 using 20 mm ISS size HBG metal including labour charges watering wherever necessary compacting and laid in layers not more than 15 cm thick etc,complete complying with standard specification
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Muthamizh Copnstruction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .