Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC GRAM NAURANGABAD THANA DHAMPUR DISTRICT BIJNOR UTTAR PRADESH | NAURANGABAD | BIJNOR | UTTAR PRADESH | ₹17.8 L | L1 | Accepted-AOC Responsive |
| 2 | L2₹18.5 LRejected-AOC NAVA PUWA DHARMSHALA ROAD HARDARI | GANDHINAGAR | GUJARAT | 382115 | ₹18.5 L | L2 | Rejected-AOC Responsive |
| 3 | L3₹22.8 LRejected-Finance | ₹22.8 L | L3 | Rejected-Finance Responsive |
| 4 | L4₹27.5 LRejected-Finance | ₹27.5 L | L4 | Rejected-Finance Responsive |
Tender Value
₹27.5 L
EMD Value
₹2.8 L
Closing Date
16 Feb 2026, 3:00 pmClosed
EE. CD-2 PWD Bijnor (HQ-Najibabad
Office of the EE CD-2, P.W.D Bijnor (HQ-Najibabad)
Repair work of damaged embankment of bridges on Rehar Kehripur road km 8 on Dhara River and km 14 on Banaili River
2026_CEMBD_1114229_6
132/E-Nivida/2025-26 Dt. 19.01.2026
Open Tender
Civil Works - Roads
Najibabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹2.8 L
Office of the EE CD-2, P.W.D Bijnor (HQ-Najibabad)
28 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
11 Feb 2026
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Suppling of Eucalyptus Balli 31 to 40 cm circumference lenth 5.00 M. from market to site of work i/c cost of Balli, carriage, loading, unloading etc for complete the work. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Supply laying & packing Nylon rope crates size 0.9X0.9X0.9 mtr with mesh size 10.00X10.00 cm and weight not less then 450 gram per no. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Supply & Laying of empty cement bags filled with local sand i/c stiching stacking at site as per direction of engineer. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302. Including cost of All material, labour cess, T&P, Royalty, all taxes but excluding cost of GST.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.89 MB
T106.pdf
Tender Documents • 0.90 MB
BOQ_2066650.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid