Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Finance PLOT NO 199 NEAR BALAJI PETROL PUMP TRANSPORT NAGAR KORBA C G 495677 | KORBA | KORBA | CHHATTISGARH | 495677 | L1 | Admitted-Finance | |
| 2 | L2₹1.3 L+₹7,079 (5.76%)Admitted-Finance QR NO 42 WARD NO 23 DADAR KHURD KORBA CHHATTISHGARH 495682 | KORBA | KORBA | CHHATTISGARH | 495682 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIVRAM ENGINEERING WORKS L2 | DEV ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.01 | UJ Kit Propellar Shaft SPL 100 | 15 | no | 700 ₹10,500 | 350 ₹5,250 Lowest |
| 1.02 | Instrument cluster | 8 | no | 585 ₹4,680 Lowest | 1,250 ₹10,000 |
| 1.03 | Center bearing Kit Assembly | 15 | no | 585 ₹8,775 | 150 ₹2,250 Lowest |
| 1.04 | Flat U- Bolt Rear | 20 | no | 156 ₹3,120 | 150 ₹3,000 Lowest |
| 1.05 | Head Lamp 24 V part no. IE317553 | 15 | no | 350 ₹5,250 | 250 ₹3,750 Lowest |
| 1.06 | Head Lamp 24 V part no. IE317552 | 15 | no | 350 ₹5,250 | 250 ₹3,750 Lowest |
| 1.07 | Tail Lamp with integrated Registration | 15 | no | 329 ₹4,935 | 250 ₹3,750 Lowest |
| 1.08 | Fuel Water seperator spin ON with Gasket | 15 | no | 280 ₹4,200 Lowest | 1,050 ₹15,750 |
| 1.09 | Combo Oil Filter | 15 | no | 435 ₹6,525 Lowest | 1,250 ₹18,750 |
| 1.10 | Fuel Filter Spin ON | 15 | no | 490 ₹7,350 Lowest | 1,150 ₹17,250 |
Tender Value
₹2.2 L
EMD Value
₹2,800
Closing Date
10 Aug 2026, 1:00 pmClosed
STAFF OFFICER (EandM),SECL KUSMUNDA AREA
OFFICE OF THE STAFF OFFICER (EandM),SECL KUSMUNDA AREA P.O.KUSMUNDA COLLIERY 495454 DISTT. KORBA (CG) CONTACT No 9425533002
Repairing or replacement of complete filter set and misc parts head lamp Tail lamp instrument cluster etc in 15 nos departmental Vehicles Eicher make Truck and Mini Truck deployed at Kusmunda Project
2026_SECL_362527_1
SECL/GM/KSM /EnM/eTender/26-27/29 dt 25-07-2026
Open Tender
Miscellaneous Works
Item Rate
30 days
KUSMUNDA OCP
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,800
21 Sept 2026
25 Jul 2026
11 Aug 2026
25 Jul 2026
10 Aug 2026
27 Jul 2026
25 Jul 2026 - 29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | UJ Kit Propellar Shaft SPL 100 | 15 | no | - | - |
| 1.02 | Instrument cluster | 8 | no | - | - |
| 1.03 | Center bearing Kit Assembly | 15 | no | - | - |
| 1.04 | Flat U- Bolt Rear | 20 | no | - | - |
| 1.05 | Head Lamp 24 V part no. IE317553 | 15 | no | - | - |
| 1.06 | Head Lamp 24 V part no. IE317552 | 15 | no | - | - |
| 1.07 | Tail Lamp with integrated Registration | 15 | no | - | - |
| 1.08 | Fuel Water seperator spin ON with Gasket | 15 | no | - | - |
| 1.09 | Combo Oil Filter | 15 | no | - | - |
| 1.1 | Fuel Filter Spin ON | 15 | no | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tendernotice_2.pdf
PDF • 1.75 MB
Tendernotice_3.pdf
PDF • 1.39 MB
BOQ_375449.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .