Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1 BAMANAI LUHETA HATHRAS HATHRAS UTTAR PRADESH 204101 | HATHRAS | UTTAR PRADESH | 204101 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical GIJJROLI AGRA ROAD HATHRAS UTTAR PRADESH 204101 INDIA | HATHRAS | HATHRAS | UTTAR PRADESH | 204101 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹44.1 L
EMD Value
₹45,000
Closing Date
16 Apr 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ESWC ALIGARH
ALIGARH
ESWCA-02/2023-24
2024_DVVNL_880512_2
ESWCA-02/2023-24
Open Tender
Electrical Works
Turn-key
60 days
ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
DVVNL AGRA WEBSITE
₹45,000
25 Apr 2024
2 Apr 2024
16 Apr 2024
2 Apr 2024
16 Apr 2024
2 Apr 2024
Amount
Safe Carriage of following store items with loading & unloading at both ends respectively. (under jurisdiction of DVVNL) to praposed site.
Transformer
63 KVA 11/0.4 KV
33KV Equipment
(i) Line isolator
(ii) Bus isolator
Insulators
(i) 33 KV Pin Insulators
(ii) 33 KV Pin with Nut
(iii) Disc Insulators 70 KN. B&S Type
(iv) Disc Fitting 70 KN. B&S Type
90 Lbs. Rail pieces for T/F
33 KV Single Transformer Control Panel.
33 KV Double Transformer Control Panel.
33 KV VCB 800A, 750 MVA
33 KV CT, 400/200/1-1-1A
33 KV CT, 200/100/1-1-1A
Cables
(i) 11 K.V. XLPE AL 3x300 Sq. mm.
(ii) 11 K.V. XLPE AL 3x185 Sq mm
(iii) 11 K.V. XLPE AL 3x70 Sq mm
(iv) L.T. Cable 3.5 x70 Sq mm Al.
Conductor
ACSR Dog Conductor
Support
STP Pole 11 Mtr. Long
11KV Equipment
(i) TPMO
(ii) Fuse set
(iii) Stay wire 7/10 SWG
(iv) G.I. wire 6 SWG
(v) Stay rods 16x1800 mm.
(vi) Earthing rods 20x2540 mm
(vii) 11 K.V. Pin Insulator complete With Pin.
(viii) 11 KV Disc Insulator With Fitting 45 KN. (T&C).
ST Pole 13 Mtr Long SP-72
33 KV XLPE cable 3x300 sq mm
Supply/Providing of follwoing materials (Decentralized materials) by contractor:-
33 KV Terminal Gantry
Main Bus Bar Complete With Structure
Structure for 33 KV line & Bus Isolator (As per GTP)
33 KV Post Insulator.
Structure for 33 KV Post Insulator (As per GTP)
33 KV Lightening Arresters
Structure for 33 KV Lightening Arresters (As per GTP)
33 KV Fuse Set
Structure for 33 KV Fuse Set (As per GTP)
Plinth & Foundation of T/F
33 K.V. P.T. 33 K.V./110V
Plinth & foundation of VCB
Laying of 11 KV Cable Including cost of sand & bricks
Making of 11KV cable boxes mounted with switchgears and transformers.
24 Volt battery and battery charger with cabinet.
Control Cable
(i) 4x2.5 Sq. mm.Cu. xlpe
(ii) 2x2.5 Sq. mm.Cu. Xlpe
Earthing of Substation
(i) Outdoor Equipment (Earth Mat)
(ii) Indoor Equipment
11 KV Cable Jointing kit Heat Shrinkble
(i) 3x300 Sq. mm Indoor
(ii) 3x300 Sq. mm Outdoor
(iii) 3x185 Sq. mm Indoor
(iv) 3x185 Sq. mm Outdoor
(v) 3x70 Sq.mm Indoor
(vi) 3x70 Sq. mm Outdoor
Power T/F earthing (water level)
(i) Neutral
(ii) Body
Outdoor switchyard and approach road lighting
Cost of accessories for mounting of 63 KVA T/F
Cost of fire fighting equipment Co2 4.5 Kg (2 Nos). 9 Ltr. Fire extingusher (2 Nos) Fire Bucket (04 Nos.) with Stand furniture protection board, single line diagram board, name board, max.& min. & Triping Board etc.
HDPE pipe (200 mm DIA) for UG layimg of 3x300 sq mm 33 kv XLPE cable(pipe to be laid by HDD method)
G.I. Pipe 6 inch dia
33 KV jointing kit 3x300 sq mm heat shrinkable
Stone Pad
M.S. Angle 65x65x6x4300 mm. Bracing Set with 4No. Clamps.
Top Channel 125x65x3200 mm. With Clamps.
Disc insulators B&S Type 7000 Kg.
Disc Fittings for Dog/Raccoon 7000 Kg.
33KV Pin Insulator
33KV Pin with Nut.
P.G. Clamp for Dog Conductor.
‘E’ bracket for 33KV
Barbed wire
Aluminum Binding Wire 6 SWG
Number plate with clamp
Danger Board with & Washers
M.S. Bolts, Nuts & Washers
Concreting of support 1:4:8 for grouting
Earthing Complete
Aluminum Paint
Red Oxide Paint
Stays Complete
Earth Wire Clamp
Erection of following Material & Miscellaneous Electrical Works. (As Per RESPO Norms) :-
TERMINAL GANTRY:
Fabrication with cutting, straightening & drilling of holes in Joist/Angle, fixing members of M.S.Angle, by electric welding.
BUS BAR GANTRY:
Fabrication of bus bar gantry on M.S.Rail 90Lbs / 150x150mm R.S.Joist including straightening, drilling of holes & fixing top droper and bracing of M.S.Angle/Channel, as per drawing.
LINE/BUS ISOLATOR STRUCTURE: (3Nos.)
Fabrication of Structure, including cutting, straightening & drilling of holes in Channel/Angle.
Fuse Set/L.A./P.T/POST INSULATOR STRUCTURES (2+3+1+3):
Fabrication of structure, including cutting, straightening & drilling of holes in Channel/Angle/Joists. M.S.Plate to be fixed on structure of required size.
Plinth for 10 & 5 MVA Transformer Qty 02 Nos.
(i) Construction of plinth for 10 & 5 MVA, 33/11 KV Transformer of (3.46x4.46x1.0)m (0.50m below ground level and 0.5 m above ground level) as per details & drawing attached (All required matrials provided/Supply by the contractor own his cost):- Excavation of earth in foundation.
(ii) Cement concrete in foundation in ratio 1:6:12, Cement, Sand & Brick ballast.
(iii) First Class Brick work in ratio 1:4 with Cement & Coarse sand mortar.
(iv) Cement concreting inner side of plinth in ratio 1:4:8, Cement, Coarse sand and stone shingle.
(v) M.S.work for re-inforcement 12mm. Tor at a distance of 15Cms. apart, including cutting, bending & binding by wire to each other for making JAL in two layer, 12 to 15Cms. apart. M.S.12mm Tor bar provided by the contractor his own cost.
(vi) Fixing of 3.46 Mtr.long, 2No. Rail Pices, 90Lbs, on top of Plinth at proper distance in alignment by C.C.
(vii) Cement concrete in ratio 1:2:4, Cement, Coarse sand & Stone shingle, on top of the plinth, including fixing of M.S.Tor Jal.
(viii) 12mm.thick Cement Plaster in ratio 1:4, Cement & Sand mortar, on all side of plinth.
(ix) Neat cement coating 3mm.thick on top surface of plinth.
Plinth for 33 KV V.C.B.
(i) Construction of plinth for the structure of 33 KV VCB & C.T.’s as per details for . (All required materials provided / Supply by the contractor own his cost) :- Excavation of earth of size 2x(2.0x2.0x1.0)m pits for construction of plinth.
(ii) Brick Ballast ratio (1:4:8) (cement, sand & brick ballast) for foundation work 2x(2.0x2.0x0.5)m plinth.
(iii) R.C.C. work in ratio 1:2:4 (cement, coarse sand & stone grit) of 20m size for making plinth of size 2x(2.0x2.0x1.0)m and grouting of foundation bolts 04 Nos. for 33 KV VCB.
(iv) 12mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.4m upper side
Earthing of Outdoor Equipments in Switchyard with 32mm MS Bar as per specifation (as per respo Norms)
(i) Providing & laying of G.I.Strip of size 40x6mm for connecting the earthmat with each equipment (Terminal Gantry, Bus Gantry, Bus Isolators, Line Isolator, 33KV C.T., 33KV V.C.B., L.As., Fuse Set, Post Insulators, T/F Body & its neutral and M.S.Frame of Cable Supporting Structure), various steel structures. The work also includes cutting, bendidng, straightening, over-laping and welding the earth strip with earth mat and by using high quality arc welding in already digged trenches.
(ii) Painting of Earth Strip of size (50x6) mm with one coat of ready mixed primer with two coats of ISI mark synthetic channel green paint.
Earthing of indoor equipment, details as given below:-
(i) Cutting of 32mm.dia M.S. Bar-3Mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge outside control room and proper welding with M.S.Bars.
(ii) Digging of Pits for making Bridge on both side of control room by laying 32mm. dia M.S.Round in rectangular shape. Electric welding on cross joints by providing “U” Clamp in size 25x6mm. of M.S.Flat and inter connecting both by M.S.Round 32mm.dia through control room trench, with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint.
(iii) Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 3mm into the ground at 20 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the G.I.Earth strip size 50x6mm will be welded to the G.I. pipe and neutral earthing support & other installed equipment in switchyard. All required material provided / supply by the contractor own his cost.
CONSTRUCTION OF CONTROL CABLE TRENCH WITH TRENCH COVER IN SWITCHYARD, AS PER Specifation
Removal of existing 10 & 5 MVA Transformer and other accessories equipments.
(i) Disconnecting HT cable connection from 33KV side & 11KV side of 10 & 5 MVA Power transformers for removing power transformer from plinth after proper shutdown. Dismantling of 11KV cable support structure, copper bus bar structure, M.S.Frame etc.
(ii) Disconnecting copper flexible/Earthing strip from Power transformer neutral & Dismantling neutral earthing system to facilitate removal of Power transformer from plinth.
(iii) Disconnecting Earthing strip from body of 10 & 5 MVA Power transformer.
(iv) Draining of transformer oil from conservator, radiators of existing 10 & 5 MVA T/F, 220/132 KV Switchyard to newly praposed S/S into the dry & clean drums and stacking at the safe place in Substation outside of switchyard. Empty drums shall be provided by contractor
(v) Removal of conservator, radiators and other accessories from existing 10 & 5 MVA Power transformer.
(vi) Safe Shifting of 10 & 5 MVA Power transformer main body and other accessories from the 220/132 KV substation switchyard to outside the switchyard at new constructed Plinth of new switchyard.
(vii) Re-assembling of conservator, radiators and other accessories to existing 10 & 5 MVA Power transformer.
(viii) Re-filling the transformer oil (old & used) in existing 10 & 5 MVA T/F)
(ix) Fabrication and erection of neutral earthing L Type support made of G.I. Channel size 100x50mm. Structure shall be 4 Mtr. Long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300x300x700mm and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and G.I. Earthing strip with the help of flexible copper bond, G.I. Bolt and washer.
(x) Fabrication and erection of cable support made of two pieces of G.I. Angle (65x65x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. G.I. Flat (50x6) mm pieces of size 750 mm long each by welding at equal intervals and grouting in a block of size (300x300x700)mm in C.C. 1:3:6 (cement, coarse sand and stone ballast) complete and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint. Work includes providing of three Nos. G.I. clamps made of (50x6)mm G.I. Flat for holding the cable including nuts and bolts.
(xi) Fabrication and grouting of G.I. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The G.I. frame shall be made of G.I. channel (100x50)mm in ‘T’ shape. Providing 2 Nos. support of G.I. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint and grouting the frame in C.C. ratio 1:3:6 (cement, coarse sand and stone ballast) in a block of size (300x300x700) mm. The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminium binding wire in complete.
(xii) Providing & Fabrication of copper bus bar of size (2500x50x6)mm in L.V. side of 10MVA 33/11 KV, power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work. (Supply/Providing by Contractor)
H.T. Power Cable Laying (11 KV 3X300sqmm):
Laying 11 KV, (3x300) mm2 XLPE, Cable from power transformer to 11 KV incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
Cable Laying (11 KV 3X185sqmm):
Laying 11 KV, 3x185mm2 XLPE, Power cable from outgoing switch gear to 11 KV double poles in the cable trench 0.50m wide, 0.90m depth. Providing 150 thickness mm local sand for cushion beneath and 150mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cables etc. Spare cable shall be left over and laid in the trenches in shape of 6m rings at both ends. At the end of feeder cables, where the cable is to be laid across pucca/main road, 100 mm dia G.I. pipe will be weared over the cable in the cable trench for the protection of cable.
Preparation of 11 KV Power Cable Jointing Kits:
Making of 11 KV XLPE Heat shrinkable outdoor jointing kits 3x185Sq.mm/3x300Sq.mm/3x70Sq.mm after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs
Installation of 24V Battery and Battery Charger:
Assembling and installation of the cabinet of 24V battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charge with flexible copper lead of size 7/20 SWG shall be done properly. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect.
Laying of Control Cables (2x2.5)mm2/ (4x2.5)mm :
Laying of different size of (2x2.5)mm2/ (4x2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT’s to CT’s Junction Box, 33 KV CT, 33 KV PT, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment.
Erection of 11 KV Feeder Double Pole:
Erection and grouting of 2 Nos. STP-55-11Mtr long for making DP Structure including fabrication fixing of G.I. Channel, G.I.Angle, TPMO, Fuse Set, disc, insulators, pin insulators No. Plate, Danger board, barbed Wire (02 Kg per Pole) etc. the work includes supply and fixing of necessary clamps size 75x10mm with G.I.Nuts bolt & washer, bolts and washers. The work also includes grouting of Double pole support in C.C. 1:3:6 (cement, Core sand & stone ballast) in block of size (0.45m x 0.45 x 1/6 length of the pole) including earthing of Double pole with G.I. earthing rod complete in all respect.
Providing & wearing of 160 mm dia, 3.0 mtr long G.I. pipe in the feeder cable & 33 KV Cable of size of (3x300, 3x185)mm2 XLPE 33KV/11KV power cable before making the outdoor cable boxes. The work includes the sealing of G.I. Pipe, top end and lower end of the pipe is to be buried in to the ground about ½ m and proper dressing of cable etc. The work includes lifting, mounting and clamping of 11 KV feeder cable boxes on the feeder with double pole structure and making connections including supply of cable mounting clamps etc.
Providing & fixing of SMC Danger board & Number Plate at each location as per specification of the drawing. Size 200mmx250mm & 3mm thickness with G.I.Clamp & nut & bolt
(i) Grouting of stay rods (16x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:3:6 cement, sand, 20mm Stone grift) as per drg. Including back filling of soil and proper ramming etc.
(ii) Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators of 11KV and Stay Clamps.
Painting of Structures :
Painting of the all structures with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect.
Substation T/F
Installation & Mounting of 11KV/0.433KV, 3 Phase, 63KVA, Distribution Transformer on Existing DP. Work complete in all respect.
Installation of 33 KV Isolators:
Assembling and installation of line/Bus Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
Installation of 33 KV Lightning Arrestors:
Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.’s structure/terminal gentry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required.
Installation of 33 KV Post Insulators:
Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
Installation of 33 KV Fuse Set:
Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing, if required.
Installation of 33 KV VCB :
Assembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required.
Installation of 33 KV VCB Control Panel for single T/F & Double T/F Control Panel.
Carefully and safely shifting of 33 KV VCB control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. Placing and fixing of panel on foundation, bolts of proper size in proper position and alignment.
Installation of 33 KV C.T.’s:
Installation of 3 Nos. C.T.’s on the C.T’s structure. The work includes fabrication for proper fixing, if required to complete the work.
Installation of 33 KV P.T.’s:
Installation of 3 Nos. P.T.’s on the P.T’s structure. The work includes fabrication for proper fixing, if required to complete the work.
33 KV CT’s Junction Box:
Providing & fixing of junction box of size (400x400x150) mm made of G.I. sheet of 16 SWG in between 33 KV CT’s & control panel. The work also include making proper connection on the junction box and making all connection in between CT’s and control panel complete as per manufacture’s panel drawing including testing and commissioning of work etc. complete the work.
33 KV Bus Bar Jumpering:
Jumpering, including clamping/binding with ACSR Dog conductor/33KV 3x300mm2 XLPE cable with providing P.G.Clamp & other accessories with complet Job.
Lighting Arrangement of 33/11 KV S/S outdoor switch yard and its area:
(i) Supply & installation and erection of 6 Mtr. Long street light supports with 2.4 feet long street light brackets including fixing and supply of junctions box, street light support shall be made and fabricated from G.I. pipe of 3.0 Mtr. Long 100mm dia. And 3.0 Mtr. Long 75mm dia with 2.4 Mtr. Long street light bracket in arc shape and made up of 40 mm dia G.I. pipe. Grouting of support in C.C. ratio 1:3:6 (cement, core sand and stone ballast) in size (0.40x0.4x1.2)m, Lightning poles shall also be earthed by connecting to earth mat.
(ii) Supply and Fixing of LED light 120 W and of standard quality ISI mark with water tight elbow fitting etc. complete in all respect and suitable for above street light supports (Acceptable make Philips, Bajaj, Heawels or Siska).
Laying of 3½x70 mm2 PVC LT cable from 11/0.4 KV, 63 KVA T/F to L.T. distribution board in switch gear room after digging trench for laying cable and refilling of trench including connections at both ends after providing and crimping of lugs of proper size for completion of work and laying brick over & both sides of L.T. cable after digging trench of 0.3 m wide & 0.5 m depth and providing and wearing 75 mm dia G.I. pipe of 2.5 M length over L.T. Cable complete in all respect.
33 KV Line work
(i) Laying of HDPE Pipe Underground minimum 3 Mtr. Below by HDD Method along with laying of 33 KV 3x300 sqmm. XLPE cable in HDPE pipe.
(ii) Four pole Structure made of STP Pole 13 Mtr Long Complete As per respo Schedule
Providing/Supply & Fabrication & erection of cable support made of two pieces of M.S angle 65x65x6 mm 3.5 Mtr Long Joined to each other by means of 5 Nos. M.S angle 65x65x6 mm pices of size 3 Feet long each by welding at equal intervals as per drawing and grouting in a block of size 300x300x700 mm complete and painting with one coat of ready mixed primer and two coats of aluminium paint this includes providing the cable including nuts & bolts.
P K ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .