Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.8 LAdmitted-Fee/PreQual/Technical/Finance | -18.60% | ₹15.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹15.9 LAdmitted-Fee/PreQual/Technical/Finance | -18.22% | ₹15.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹16.3 LAdmitted-Fee/PreQual/Technical/Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | -16.00% | ₹16.3 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹16.5 LAdmitted-Fee/PreQual/Technical/Finance | -14.99% | ₹16.5 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹17.2 LAdmitted-Fee/PreQual/Technical/Finance | -11.50% | ₹17.2 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹19.4 L
EMD Value
₹19,500
Closing Date
7 Jul 2026, 5:00 pmClosed
Divisional Officer
GENERAL PUBLIC HEALTH DIVISION NO-II, SAMBALPUR
Improvement of PH Work to BIET Umerkote District of Nabarangpur as per letter 8656 dt.12.12.2025 of DTEO Buildings.
2026_EICCL_132881_1
IFB-01/ SE GPH SBP of 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
90 days
Nabarangapur
2 documents required · 2 mandatory
₹6,000
₹19,500
Yes
8 Jul 2026
25 Jun 2026
8 Jul 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
25 Jun 2026 - 6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PH Work to Administrative Building Common Toilet Block Supplying all materials, labour, T&P and providing and fixing to wall or ceiling and floor GI/PVC pipes, class-IV (10 k.g. F/cm) on firming I.S.4985 of the following nominal bore, tube fittings and clamps including making good the wall, ceiling and floor, testing all complete as per specification and direction of the Engineer in charge.(Supreme/ Finolex/Oriplast make)20mm dia PVC ASTM pipe (sch-80) | 20 | mtr | 178.7 | ₹3,574 |
| 2 | 25mm dia PVC ASTM pipe (sch-80) | 96 | mtr | 248.7 | ₹23,875.2 |
| 3 | Supplying all materials, labour T&P and fitting and fixing brass/CP fittings of the following nominal bore with supply of all joiniting materials including cost & conveyance of all materials to worksite, payment of taxes etc. all complete as per P.H specification and direction of the Engineer-in-charge.(Plaza/ Hindware/Cera make)15mm dia CP angle stop cock (Plaza Make) | 5 | each | 823.6 | ₹4,118 |
| 4 | 15mm dia CP long body bib cock (Plaza Make) | 4 | each | 866 | ₹3,464 |
| 5 | 25mm dia brass full way valve (Shakti make) | 2 | each | 1,214.5 | ₹2,429 |
| 6 | 15mm CP Extension piece | 9 | each | 77.4 | ₹696.6 |
| 7 | 125mm CP grating | 3 | each | 88.8 | ₹266.4 |
| 8 | 15mm size C.P. flange | 9 | each | 52.6 | ₹473.4 |
| 9 | Supplying all materials , labour, T&P and fixing rotational moulded polyethylene cylindrical vertical water storage tanks conforming to IS:12701/1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jam nuts, fixing ball valve etc. including hoisting upto a height of 5 metres above ground level and placing the tank to the required position and providing 5.40 mtr. lengthx0.25 mtr width KB brickwork in cement mortar (1:6) of 0.46m height in staging and 0.13mtr thick circular protection wall of 0.46mtr height to support the tank,12mm thick cement plaster in cement mortar (1:6) over brick work, RCC slab of size 1.60mX1.60m and 0.10m thick ,RCC beam of 0.25mx0.30m and 3.40m average length in cement concrete (1:2:4) using 12mm size crusher broken hard black granite chips and required steel reinforcement including centering and shuttering,watering,curing ,cost of all materials,conveyance of all materials to worksite , payment of royalty, all taxes etc.all complete as per approved drawing , P.H. specification and direction of Engineer-in-charge 1000 liters capacity PVC water storage tank roof of Ground Floor | 1 | each | 13,005.7 | ₹13,005.7 |
| 10 | supplying all materials, labour, T&P and cutting holes through existing brick work including making good the damages in cement mortar (1:4) for taking G.I. Pipes and fittings/ P.V.C. pipes and fittings including watering, curing, cost & conveyance of all materials to worksite, payment of royality, taxes etc. all complete as per direction of Engineer-in-charge. | 2 | each | 64.3 | ₹128.6 |
stage.html
html • 0.03 MB
finance_597743.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 0.72 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_597743.xls
BOQ • 0.44 MB
Corrigendum.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].