| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.1 LAccepted-AOC R O VILLAGE KADWA TEHSIL BASANTGARH | ₹33.1 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹34.5 L+₹1.5 L (4.40%)Rejected-Finance R O VILLAGE DHALPAR TEHSIL DISTT UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹34.5 L+₹1.5 L (4.40%) | L2 | Rejected-Finance L3 BIDDER |
| 3 | L3₹37.6 L+₹4.5 L (13.7%)Rejected-Finance THALL LOHAI TESHIL MALHAR | ₹37.6 L+₹4.5 L (13.7%) | L3 | Rejected-Finance L2 BIDDER |
Tender Value
₹36.8 L
EMD Value
₹73,600
Closing Date
15 May 2026, 2:00 pmClosed
Executive Engineer PMGSY Division Ramnagar
Executive Engineer PMGSY Division Ramnagar
Permanent Restoration of road from L041-Punara Lower to Kadwa Bhattian JK14436 Under SASCI Block Dudu
2026_JKRRD_147532_16
PMGSY/Div/Rgr/53 of 2026-27 Dated 08-05-2026
Open Tender
Civil Works - Roads
Percentage
60 days
Sub Division Dudu
Please see tender document
3 documents required · 3 mandatory
₹1,100
₹73,600
8 Jun 2026
9 May 2026
16 May 2026
9 May 2026
15 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth with all lead and lift, as directed by Engineer-in-Charge. All kinds of soil = 80% , Ordinary Rock= 20% | 993.07 | Cum | 228.4 | ₹2,26,817.19 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) | 42.3 | Cum | 5,673.4 | ₹2,39,984.82 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 105.23 | Cum | 6,591.25 | ₹6,93,597.24 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 1.92 | Cum | 7,275.25 | ₹13,968.48 |
| 5 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 248.45 | Cum | 5,402.9 | ₹13,42,350.51 |
| 6 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. | 222.45 | Cum | 3,262.1 | ₹7,25,654.14 |
| 7 | Dumping of stones including cost of stones in horizontal or level | 81.13 | Cum | 937.9 | ₹76,091.83 |
| 8 | Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @ 3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge. | 17.28 | Cum | 3,093.3 | ₹53,452.22 |
| 9 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. 20.6.1 Non-pressure NP-3 class (Medium duty) R.C.C. pipes ,1000 mm dia. R.C.C. pipe (laying by manual/mechanical means) | 15 | Rmt | 4,653.3 | ₹69,799.5 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete | 274.4 | Sqm | 286.35 | ₹78,574.44 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_230264.xls
BOQ • 0.32 MB
Corri53.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .