Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.7 L+₹190.59 (0.11%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹1.7 L+₹1,749.91 (1.01%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹1.7 L
EMD Value
₹3,500
Closing Date
14 Jan 2026, 12:00 pmClosed
Prodhan Gopalbera GP
Gopalbera, Purba Bardhaman
Construction of Pucca Drain with cover and soak pit from Aditya Diger House towards Shakti Ghosh Land at Rautara
2025_ZPHD_978304_1
08 (Sl no - 03) (2025-26)
Open Tender
CIVIL WORKS
Percentage
30 days
Routara
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,500
16 Feb 2026
24 Dec 2025
17 Jan 2026
24 Dec 2025
14 Jan 2026
24 Dec 2025
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .
I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means
(iv) Without pumping out water and shoring
Sand filling in foundation trenches and at the back of abutments, wing-walls etc. with good local sand free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be approved by the Engineer-in-charge.
Note - 1. Labour rate per m³ is provided; Cost of sand is to be added to arrive at the complete item rate.
2. Compaction factor of dry clean sand is 0.835.
Supplying and laying Polythene Sheet (150 gm/sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches.
I) Cement concrete with graded stone ballast (40 mm size excluding shuttering)
In ground floor
A) [Pakur Variety]
a) 1:3:6 proportion
Providing and laying Design Mix concrete for plain / reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.
(a) M-20 Grade
1. Construction Wing will add the cost & carriage of 0.9 cum/m³ coarse aggregates and cement as per requirement vide Table 3.2-1 only to arrive at consolidated rate.
Hire & labour charges for shuttering with or without staging upto 4 mtr height using approved stout props with wood planks/ply wood/steel plate with required bracing for any kind of plain or reinforced concrete work in all sorts of minor structure including culvert, box culvert, cross-drain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.
b) Where staging is not required
125 mm th. Brick work with Fly Ash Bricks set in cement sand mortar (1:4) including raking out joints, curing, scaffolding etc. complete in all respect.
a) In ground floor
Brick work with Fly Ash Bricks set in cement sand mortar (1:6) including raking out joints, curing, scaffolding etc. complete in all respect.
a) In ground floor
Plaster (to wall, floor, ceiling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary
ii) (c) 10 mm thick plaster with cement morter (1:4)
Neat cenent punning about 1.5 mm thick in wall, dado, window, sills, floor,drain etc
Supplying, fitting and placing HYSD bar reinforcement in Sub-structure including initial straightening, straightening of coils bars, removal of loose rust (if any), cutting to requisite length bending, binding with annealed wire not less than 1 mm in size and conforming to IS 280 at every intersection hooked and bent to correct shape and placed on forms etc. including cost of black annealed wire and cost of loading, unloading, carriage of all steel materials complete as per drawing and technical specifications and direction of Engineer-in-charge.
The rate provided is exclusive of cost of steel materials. Construction wing should add cost & carriage of 1.05 MT (considering 5% wastage) of steel materials to arrive at the final consolidated item rate.
Earthwork in filling in foundation trenches with good earth in layers not exceeding 15cm. Including watering and ramming layer by layer complete with earth obtained from excavation of foundation or from fresh excavation of land arranged by Department within a lead of 150 m.
Supplying sign-board made of 25 mm thick sal plank and frame on all side of sal batten 50mm x 32 mm and 3.15m x 100mm x 100mm fitting fixing such with digging holes of dia 300 mm and depth 750 mm in all sorts of soil and repacking and consolidating the gap around the post with cement concrete (1:3:6) painting 2 coats including cost of nails, bolts and nuts etc. complete in all respect as per direction of the Engineer- in- charge. Payment of concrete and painting to be made separately.
(ii) 900 mm. x 600 mm. size of board.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.79 MB
BOQ_2384258.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .