Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 LAdmitted-Fee/PreQual/Technical/Finance | -15.00% | ₹1.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.9 L+₹10,747.98 (6.12%)Admitted-Fee/PreQual/Technical/Finance | -9.80% | ₹1.9 L+₹10,747.98 (6.12%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.9 L+₹12,649.55 (7.20%)Admitted-Fee/PreQual/Technical/Finance | -8.88% | ₹1.9 L+₹12,649.55 (7.20%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.0 L+₹24,823.71 (14.1%)Admitted-Fee/PreQual/Technical/Finance | -2.99% | ₹2.0 L+₹24,823.71 (14.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.1 L
EMD Value
₹20,700
Closing Date
18 Sept 2026, 3:00 pmClosed
Nagar Ayukta Nagar Nigam Jhnasi
Nagar Nigam Jhansi
TENDER NO.(23) WARD NO.49 GONDU COMPAUND KE ANTARGAT BALIDAN PARK KE PAS STHEET SELFIE POINT KE SAMANE CHATIGRAST PULIA KA NIRAMAN KARYA.
2026_DOLBU_1183533_23
1362/JANKARYA VI./N.NI./2026-27 DATED-02/09/2026
Open Tender
Civil Works
Percentage
30 days
Jhansi
Please refer Tender documents.
1 document required · 1 mandatory
₹248
Nagar Ayukta Nagar Nigam Jhansi
₹20,700
22 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantaling of Brick Work including lab T&P etc all | 0.41 | Cu.m | 370 | ₹153.18 |
| 2 | Dismantaling of old rcc including etc all complete | 0.48 | Cu.m | 920 | ₹441.6 |
| 3 | Dismantaling of old Tiles including all complete. | 100 | Sq.m | 9.95 | ₹995 |
| 4 | Excavation in foundation in Ordinary soil 1.5m lift & 30m lead lab T&P etc all . | 15.08 | Cu.m | 170 | ₹2,563.6 |
| 5 | Providing & Laying of C.C. With 20-40mm gauge stone ballast coarse sand and cement in 1:4:8 incl.material ,lab, T&P etc all. (SI-281). | 2.66 | Cu.m | 4,175 | ₹11,105.5 |
| 6 | 1st class Brick Work in 1:4 Cement & Sand mortar in foundation and plinth including supply of all mat. Lab. And T&P etc. all complete (S.I. No. 305). | 2.48 | Cu.m | 5,940 | ₹14,731.2 |
| 7 | R.C.C. work in 1:2:4 with cement and c-sand & 20mm stone grit incl, material ,shuttering lab etc all complete. (SI-285). | 5.73 | Cu.m | 7,130 | ₹40,854.9 |
| 8 | M.S or iron work in renforcement cutting bending and binding incl. etc. all. | 3.15 | Qtl. | 5,950 | ₹18,742.5 |
| 9 | 12mm thick plaster in 1:4 Cement & Sand mortar including lab.& T&P etc all complete ( S.I. No. 577). | 5.4 | Sq.m | 145 | ₹783 |
| 10 | Providing & Laying of C.C. With 20mm gauge stone ballast coarse sand and cement in 4:2:1 incl.material ,lab, T&P etc all | 0.38 | Cu.m | 5,815 | ₹2,209.7 |
stage.html
html • 0.02 MB
finance_2226733.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_2226733.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .