| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.5 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹35.9 L+₹1.4 L (4.16%)Rejected-AOC | L2 | Rejected-AOC REJECTED | |
| 3 | L3₹36.3 L+₹1.9 L (5.42%)Rejected-AOC | L3 | Rejected-AOC REJECTED |
Tender Value
₹30.6 L
EMD Value
₹61,295
Closing Date
8 Jan 2024, 12:00 pmClosed
EXECUTIVE ENGINEER KANDI CANAL I AND GROUND WATER
EXECUTIVE ENGINEER KANDI CANAL I AND GROUND WATER
REHABILITATION OF 11 NOS. DISTRIBUTARIES/MINORS OF KANDI CANAL STAGE 1 HOSHIARPUR (MIRPUR MINOR FROM RD 4850 TO 6050 MTR)
2023_WR_114625_1
57/2023-24/Kandi Canal-1
Open Tender
Civil Works
Item Rate
45 days
Dasuya
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹61,295
Yes
7 Feb 2024
28 Dec 2023
8 Jan 2024
28 Dec 2023
8 Jan 2024
28 Dec 2023
Amount
Ordinary jungle clearance of both banks of running distributaries, minors and drains with discharge upto 9cum/s including boundary road :- (26.24(a)) Discharge upto 1.5 cum/s
Supply of wooden pegs for levelling work from canal or road plantation 40 mm to 50mm dia and 15cm to 23 cm long.
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m.
Dressing of earth work ((i)) New work or remodeling work.
Dag-belling:- ((a)) Single Kassi stroke minimum 7.5 cm depth.
Excavation of Soil using Hyraulic Excavator and hydraulic Tractor Trolly I/C cutting and loading in Trolly and transporting to the embankment locations with all lifts and leads ((a)) Disposal/carraige from 0 upto 450m
((b)) Disposal/ carraige additional beyond 450m upto 1Km
((c)) Disposal/carraige for every additional 1Km upto 5.37 Km
Dressing bed and preparation of sub grade for lining.
Dressing side slopes and preparation of sub grade for lining.
Putting 1:3 (Cement:water) cement slurry with cement @ 2.25 kg per sqm on prepared bed and side slopes before laying concrete on bed and side slopes
Filling expansion joints with special impervious hot pour 12.5mm wide.
Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- ((a)) 0 to 1.5 m depth
Cement concrete lining 75mm. thick or less laid manually for irrigation channels, using cement concrete M-15 with cement content 325 kg/cum mixed in an automatic computerized Batching & Mixing Plant and transported to the site in transit mixers with an average lead of 1 Km(FOR TRAPEZOIDAL SECTION AND CUP SECTION OF ALL RADII)
Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding cost of rolling.
Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction.
Extra for rolling to specifications.
Filling contraction joints with special impervious hot pour 12.5mm wide. Complete in all respect as per drawings,designs, specifications and instructions of Engineer- in-charge.
Extra bitumen painting at 0.69 Kg. per sqm
Supplying and laying of LDPE geomembrane sheet for sleepers of 150 micron thickness as approved by engineer incharge pasting on faces of sleepers including laying in position, carriage to site, jointing/welding etc. Complete in all respect as per drawings, designs, specifications and instructions of Engineer- in-charge.
Dismantling brick work tile, masonry or tile lining ((b)) In cement
((b)) In cement
First class burnt brick work laid in cement sand mortar 1:3 in foundation and plinth
12.5 mm thick cement plaster 1:3
Cement concrete 1:2:4 volumetric with stone ballast or shingle by mechanical means using concrete mixture using volumetric type.
Centering and shuttering for faces of walls, partitions, retaining walls and the like (vertical or battering including attached pilasters buttresses etc.
Dressing side slopes and preparation of sub grade for lining.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with excavated surplus soil. In Ordinary soil (B) Mechanical Means (a) Depth upto 3 m
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (F) RCC Grade M25 ((a)) Height upto 5m ((ii)) With Batching Plant,Transit Mixer and Concrete Pump
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing andTechnical Specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (B) Sandy material
Cement concrete 1:2:4 (a) With stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type
Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Pipe (S&S) as per IS 8329 and laying the same in trenches to correct alignment and gradients, jointed with rubber tyton joints fitted complete including all cartage, cost of rubber ring. (A) D.I. Pipe as per IS 8329 DI-K7 (( c)) 150mm i/d pipe lines laid complete
Earth work for outlet:- ((a)) Earth work for dismantling or construction of new pipe or barrel type outlets (including excavation, refilling, consolidation and dressing) ((i)) Channel discharge upto 1.5 cums per second.
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. ((a) ) Pipe or barrel type outlets ((i)) Channel discharge upto 1.5 cum/s
Cement concrete 1:2:4 (a) With stone ballast or shingle (ii) mixing by mechanical means using concrete mixer volumetric type
Earth work for outlet:- ((a)) Earth work for dismantling or construction of new pipe or barrel type outlets (including excavation, refilling, consolidation and dressing) ((i)) Channel discharge upto 1.5 cums per second.
Dismantling outlets including removal of dismantled material involving lead upto 100 metres. ((a) ) Pipe or barrel type outlets ((i)) Channel discharge upto 1.5 cum/s
Providing, Stringing out, cutting, Jointing and testing of ISI Marked D.I. Pipe (S&S) as per IS 8329 and laying the same in trenches to correct alignment and gradients, jointed with rubber tyton joints fitted complete including all cartage, cost of rubber ring. (A) D.I. Pipe as per IS 8329 DI-K7 (( c)) 150mm i/d pipe lines laid complete
Laying RCC 1:2:4 (M-15) batch mixed with stone ballast or shingle
Bending binding and placing in position steel reinforcement 10 mm dia bars as per drawing
Bending binding and placing in postion steel reinforcement 10 mm dia bars as per drawing
Laying C.C. M-10 with stone ballast or shingle i/c supply and carriage of material at site of work complete in all respects
Laying RCC 1:2:4 (M-15) batch mixed with stone ballast or shingle
ANY OTHER ITEM
THE TOE CO OP L/C SOCIETY
THE KAINTHAN COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .