| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Found correct |
| 2 | Accepted-Technical SASPOL | Accepted-Technical Found correct |
| 3 | Accepted-Technical | Accepted-Technical Found correct |
| 4 | Accepted-Technical PHYANG LEH | LEH LADAKH | LADAKH | 194101 | Accepted-Technical Found correct |
| 5 | Accepted-Technical | Accepted-Technical Found correct |
Tender Value
₹38.0 L
EMD Value
₹76,060
Closing Date
19 Jan 2026, 4:00 pmClosed
Executive Engineer R and B Division Khaltsi
Office of the Executive Engineer R and B Division Khaltsi
Infrastructure development around khatsa gonpa Tia (by way of Land development for Guest house at Khatsa Gonpa). Under Distt. Plan
2026_PWD_18321_1
56 of R and B Khaltsi of 2025-26
Open Tender
Civil Works - Others
Percentage
25 days
Khaltsi
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer R and B Division Khaltsi
₹76,060
27 Jan 2026
12 Jan 2026
21 Jan 2026
12 Jan 2026
19 Jan 2026
12 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. a) All kinds of soil 80%
b) Ordinary Rock 15%
c) Hard Rock (Blasting Prohibited) 5%
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. a) All kind of soil
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. (8 room set area) a) All kinds of soil 95%
b) Ordinary Rock 5%
Dumping stone excluding cost of stone on horizontal level.
Dumping stone excluding cost of stones on Slopes (Behind pitching)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
Random rubble masonry with hard stone laid dry in foundation, plinth & walls Laid without bond stone
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand(zone-III) : 4 graded stone aggregate 20mm nominal size).
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Carriage of material from source to site of work by Mechnical Transport including loading unloading and stacking. a) Cement an avg lead 26 Km
b) Sand an avg. lead 26Km
c) Stone aggregate an avg lead 26 km
d) Stone an avg lead 10Km
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_44164.xls
BOQ • 1.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .