| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically qualified |
| 2 | Accepted-Technical | Accepted-Technical Technically qualified |
| 3 | Accepted-Technical | Accepted-Technical Technically qualified |
Tender Value
₹19.1 L
EMD Value
₹38,300
Closing Date
2 Apr 2026, 6:00 pmClosed
CE, MDA
MDA Office New Moradabd
Horticulture Work
2026_MDA_1130445_1
27/MDA/CE/2025-26
Open Tender
Civil Works - Others
90 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
CAO
₹38,300
16 Apr 2026
25 Mar 2026
4 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth filling including Cutting. of earth in odinary soil (loam, clay or sand) includy lift 1.5m and lead 50.m. The earth from cutting will be used in making embankment in 20cm layer with a lead of 8km. with ramming dressing the surface to requried level Slope all complete as pes direction of E/Iinculding earth cutting, Cost of earth 8km Cantage cost, louding, unloading. ete all Comp P.W.D. SI No.(253A+231a) 2022 | |||||
| 2Earthwork: Excavation in trenches for foundations,pipes cables etc. in ordinary soil (Loam, Clay or Sand) including lift upto 1.5 m lead upto 50m and drassing of sides and ramming of bottom disposal of surplus excavated earth as directed by Engineer- in- charge with lead of 50 m 2.6 DSR 2023 | |||||
| 3Cement Concrete with 4cm. Guage brick ballast fine sand of 1:25 F:M and cement in proporation of 8:4:1 in foundation and under floors including supply of all meterials. labour T&P etc all complete. S.I. No 275/2022 | |||||
| 4M-150 brick work in 1:4 cement and coarse sand mortar in foundation and plinth in Cement mortar 1:4 (1 cement: 4 coarse sand). including all materials, labour and T&P etc. required for proper completion of work. DSR 6.1.1 2022 | |||||
| 512 mm. thick plaster with 1 : 4 (one part cement & Four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cms. Including supply of all material , labour , T & P etc. required for proper completion of the work. SI 584/2022 | |||||
| 6Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.). | |||||
| 740 mm thick fine dressed stone flooring over 20mm (average) thick base of cement mortar 1"5 (1 cement: 5 corse sand ) with joints finished flush, red sand stone 11.28.1 DSR2023 | |||||
| 8Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 11.3.1 40 mm thick with 20 mm nominal size stone aggre. S.I. 4.1.4 DSR 2023 | |||||
| 9Finishing walls with Acrylic Smooth exterior paint of required shade :13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqmover and including priming coat of exterior primer applied on previsully paint on old surface.@ 2.20 kg/10 sqm) DSR 13.46.1/2023 | |||||
| 10Horticulture Work Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts. (Item No-2.12 DSR-2020) (A.R) | |||||
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
BOQ_2108793.xls
BOQ • 0.31 MB
TDfor02.pdf
Tender Documents • 2.62 MB
Download all tender documents and submit your bid