| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.5 L+₹112.16 (0.08%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.5 L+₹227.23 (0.16%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.4 L
EMD Value
₹2,900
Closing Date
29 Jul 2026, 6:00 pmClosed
Executive Engineer, REW Jammu
Office of the Executive Engineer, REW Jammu
Constt. of tiles and allied work near Durga Mandir near H/O Bachan Lal w.no 8 PYT Gigerial 0.5 lakh AND Constt. of L/D from Lav singh to Parshotam singh chib w. no 7 Pyt Gigerial Block Khour 1 LAC Block Khour, Distt Jammu Under the head CAPEX PRI
2026_RDPR_316315_6
e-NIT No. 145 REWJ of 2026-27 dated 15-07-2026
Open Tender
Civil Works
Percentage
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH0515
₹2,900
21 Aug 2026
16 Jul 2026
30 Jul 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles above 25 mm and upto 40 mm. | 72 | cum. | 89.95 | ₹6,476.4 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 5.4 | cum. | 4,826.5 | ₹26,063.1 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.8 | cum. | 5,733.6 | ₹10,320.48 |
| 4 | Reinforced cement concrete including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size) | 0.27 | cum. | 7,788.4 | ₹2,102.87 |
| 5 | Steel Reinforcement for RCC Work including straightening,cutting,bending, placing in position and binding all complete above plinth level . Cold twisted bars | 27 | Kg | 123.2 | ₹3,326.4 |
| 6 | Centring & shuttering including strutting, propping etc. and removal of the formwork. | 12 | sqm. | 286.35 | ₹3,436.2 |
| 7 | Suspended floor | 0.5 | sqm. | 718.2 | ₹359.1 |
| 8 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 6 | sqm. | 266.2 | ₹1,597.2 |
| 9 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 40mm thick with 20 mm nominal size stone aggregate. | 3 | sqm. | 510.25 | ₹1,530.75 |
| 10 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge. | 50 | sqm. | 816.15 | ₹40,807.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1030871.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .