Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.6 L+₹23,198.02 (4.33%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.1 L+₹71,113.94 (13.3%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹6.4 L+₹1.0 L (19.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8 L
EMD Value
₹24,000
Closing Date
28 Jul 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CONSTRUCTION OF PATWAR KHANA AT NALLAH SUNBRARI KOKERNAG ANANTNAG.
2026_RDPR_317302_51
ENIT75of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Office of the Executive Engineer REW Anantnag
₹24,000
31 Jul 2026
23 Jul 2026
29 Jul 2026
23 Jul 2026
28 Jul 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Engagement of manual labour for Clearence of site including disposal of same, all complete job | - | Nos | - | - |
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 1 | cum | - | - |
| 0.0 | Supplying and laying of stone soling hand packed tightly including ramming, watering. | - | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:4:8 (1Cement: 4 fine sand: 8 graded stone aggregate 40mm nominal Size) | 1 | Cum | - | - |
| 0.0 | Providing and laying in position specified Grade of Reinforced cement concrete excluding the cost of centring, shutering and finishing of all work.1:1.5:3(1 Cement : 1.5 Coarse sand : 3 Graded stone aggregates 20 mm nominal size) Raft | - | cum | 1 | - |
| 0.0 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level.1:3:6 (1Cement: 3 fine sand: 6 graded stone aggregate 20mm nominal Size) | - | cum | - | - |
| 0.0 | Centering and shuttering including strutting propping etc. and removal of form work; A) Plinth | 1 | sqm | - | - |
| 0.0 | B) Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 1 | sqm | 1 | ₹1 |
| 0.0 | C) Suspended Floors/ Beams | - | sqm | - | - |
| 0.0 | Brick work with FPS bricks of class designation 75 in super structure in cement mortar 1:6 (1 Cement : 6 Coarse sand) (including Extra Brick Work) | 1 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1039514.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .