Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹37.9 L
EMD Value
₹3.8 L
Closing Date
26 Nov 2026, 2:00 pm4d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
SE MEERUT CIRCLE PWD MEERUT
SE MEERUT CIRCLE PWD MEERUT
Road safety work on Baraut Kotana Road (Other District Road) in Baghpat district in the financial year 2026-27
2026_CEMRT_1210340_3
4191/11Cashier-MC PD Baghpat Dt 26-09-2026
Open Tender
Civil Works - Others
Percentage
90 days
EE PD PWD BAGHPAT
CLASS A
3 documents required · 3 mandatory
₹2,714
₹3.8 L
SE MEERUT CIRCLE PWD MEERUT
19 Nov 2026
19 Nov 2026
26 Nov 2026
19 Nov 2026
26 Nov 2026
19 Nov 2026
20 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distacnce of 100 m. including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-section. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 194.15 | cum | 65 | ₹12,619.75 |
| 2 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as per MORD specification 401. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 88.25 | cum | 3,002 | ₹2,64,926.5 |
| 3 | Providing, laying, spreading and compacting stone aggregates of specific sizes to Water Bound Macadam Grade -2 specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and bromming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grade 2 as per Technical Specification Clause 405. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 52.95 | cum | 3,766 | ₹1,99,409.7 |
| 4 | Water Bound Macadam Grading - 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up to interstices of coarse aggregate, watering and compacting to the required density Grading III as per Techincal Specification Clause 405 3B Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. | 52.95 | cum | 3,782 | ₹2,00,256.9 |
| 5 | Providing and applying primer coat with bitumen emulsion SS-1 on prepared surface of granular Base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. Technical Specificaton Clasue (502-I). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 706 | sqm | 49 | ₹34,594 |
| 6 | Providing and applying tack coat with bitumen VG-10 grade using pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. Technical Specificaton Clasue (SI.NO. 503 II). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 706 | sqm | 20 | ₹14,120 |
| 7 | Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 Bitumen required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheele 80-100 kn static roller capacity, finished to required level and grades to be followed by Type-C seal coat. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. as per Technical Specification Clause. 508. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 706 | sqm | 222 | ₹1,56,732 |
| 8 | Providing and laying Type-C seal coat with VG-10 bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. as per technical specification clause 510. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 706 | sqm | 87 | ₹61,422 |
| 9 | Brick lining on both side of the road of M-150 bricks 7 cm. wide. 11 cm. deep, laid with mud mortar including labour & supply of bricks finished to the required template and in proper alignment and also including dressing and ramming the excavated earth as directed by the Engineer-in-charge. SOR Chapter-4 SI.No-4. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 0.57 | km | 80,000 | ₹45,600 |
| 10 | Construction of Speed Table as per drawing and directed by Engineer-in-charge. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge | 12 | No. | 69,666 | ₹8,35,992 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
Tendernotice_2.pdf
PDF • 1.52 MB
BOQ_2298799.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .