Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.0 LAWARDED | AWARDED |
Tender Value
₹5 L
EMD Value
₹12,500
Closing Date
13 Oct 2025, 10:00 pmClosed
Directorate of Municipal Administration
Providing of electricity connection to the MRF shed at the solid waste disposal unit
DMA/2025-26/OW/WORK_INDENT47469/CALL-2
DMA/2025-26/OW/WORK_INDENT47469/CALL-2
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Municipal Council Rabkavi Banhatti
₹500
₹12,500
4 Oct 2025
4 Oct 2025
10 Oct 2025
Providing of electricity connection to the MRF shed at the solid waste disposal unit
Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polyc...
Supplying and Fixing........mm dia class A GI pipe bracket upto 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL stre...
Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS...
9 Mtr long RCC Poles Material Cost
9 Mtr long RCC Poles Labour Charges
9 Mtr long PSC Poles Material Cost
9 Mtr long PSC Poles Labour Charges
8Mtr long PSC Poles for Stud Pole Material Cost
8Mtr long PSC Poles for Stud Pole Labour Charges
2 Pin cross arms Material Cost
2 Pin cross arms Labour Charges
11 KV Horizontal cross arm complete Material Cost
11 KV Horizontal cross arm complete Labour Charges
Extention Horizantal Cross arms With ST supports Material Cost
Extention Horizantal Cross arms With ST supports Labour Charges
11 KV Pin insulators Material Cost
45KN Polymer Disc Insulators Material Cost
Rabbit ACSR Conductor Material Cost
Rabbit ACSR Conductor Labour Charges
S.E.Electrods Material Cost
S.E.Electrods Labour Charges
Transformer Center
9 Mtr long RCC Double Pole Transformer Structure Material Cost
9 Mtr long RCC Double Pole Transformer Structure Labour Charges
11KV Pin Insulators Material Cost
45KN Disc Insulators Material Cost
Guy Set Material Cost
Guy Set Labour Charges
63KVA 11KV /433 V 3Phase 50Cys 5Star rated
Disribution Transformer with off load tap changer with Close Bushing Material Cost
63KVA 11KV /433 V 3Phase 50Cys 5Star rated
Disribution Transformer with off load tap changer with Close Bushing Labour Charges
Earthing materials Pipe type for grounding Material Cost
Earthing materials Pipe type for grounding Labour Charges
Caution/Danger Board Material Cost
Caution/Danger Board Labour Charges
Guy Concreting with Boulders Mud and Sand Labour Charges
GI wire 8 SWG Material Cost
Guy wire 7/10 SWG Material Cost
11 KV lightning Arrester, Metal Oxide, 9KV, 5KA Material Cost
11 KV lightning Arrester, Metal Oxide, 9KV, 5KA Labour Charges
LT Protection Kit for 63 KVA Material Cost
LT Protection Kit for 63 KVA Labour Charges
LT Hhead Through Meter Material Cost
LT Hhead Through Meter Labour Charges
LT wiring kit for LT protection kit please see B.O.M - 8 and 9 Material Cost
LT wiring kit for LT protection kit please see B.O.M - 8 and 9 Labour Charges
HG Fuse, 11 KV Solid core type 3Nos Material Cost
HG Fuse, 11 KV Solid core type 3Nos Labour Charges
200Amps SB GOS Set Material Cost
200Amps SB GOS Set Labour Charges
GST of 18% on Supervision charges Rs.
Inspectorate charges
Supervision charges 5% on above Slno 5
Applicable GST on Svp 18% on Supervision charges Rs
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .