| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82,990.80Accepted-AOC 2 112 SRI LAKSHMI NAGAR SIDHANAIKANPALAYAM SULUR 641658 | COIMBATORE | TAMIL NADU | 641658 | ₹82,990.80 | L1 | Accepted-AOC Eligible |
| 2 | L2₹84,136Rejected-Finance | ₹84,136 | L2 | Rejected-Finance Ineligible |
| Sl No | Description | Qty | Unit | A-1 INFRASTRUCTURE L1 | MR Palanisamy L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling, clearing away including all labour charges (Brick / Stone in Clay Walls under 3m high ) | 2 | M3 | 257 ₹514 | 258 ₹516 |
| 2.00 | Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 8 | M3 | 168 ₹1,344 | 170 ₹1,360 |
| 3.00 | Cement concrete Using 1:4:8 mix ( One cement , four sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications.as per TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 2 | M3 | 4,751 ₹9,502 | 4,760 ₹9,520 |
| 4.00Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. as per TNDSS NO: 30&86 | |||||
| 4.10 | a)For Side Wall | 23 | M2 | 286 ₹6,578 | 290 ₹6,670 |
| 4.20 | b)For Deck Slab | 7 | M2 | 572.2 ₹4,005.40 | 578 ₹4,046 |
| 5.00 | Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 6 | M3 | 5,454.5 ₹32,727 | 5,450 ₹32,700 |
| 6.00 | Supplying, Fabricating and placing in position TMTsteel bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete as per TNDSS NO: 86 | 160 | Kg | 88.8 ₹14,208 | 95 ₹15,200 |
| 7.00 | Reinforced Cement Concrete 1:1.5:3 Mix (One part cement, One Point five part m sand and Three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.as per TNDSS NO: 30 | 1.6 | M3 | 8,364 ₹13,382.40 | 8,365 ₹13,384 |
| 8.00 | Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete. | 5 | M2 | 146 ₹730 | 148 ₹740 |
Tender Value
₹1 L
EMD Value
₹1,000
Closing Date
22 Sept 2023, 3:00 pmClosed
Executive Officer
Executive Officer Chettipalayam Town Panchayat
Re constrution of Drain at Ward No.9 , Mantha Muniappan Koil Street in Chettipalayam Town Panchayat
2023_DTP_371778_1
85/2023
Open Tender
Civil Works
180 days
Chettipalayam Town Panchayat
As per norms
1 document required · 1 mandatory
₹0
₹1,000
8 Dec 2025
21 Sept 2023
22 Sept 2023
21 Sept 2023
22 Sept 2023
21 Sept 2023
21 Sept 2023 - 22 Sept 2023
Amount
Dismantling, clearing away including all labour charges (Brick / Stone in Clay Walls under 3m high )
Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Cement concrete Using 1:4:8 mix ( One cement , four sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications.as per TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. as per TNDSS NO: 30&86
a)For Side Wall
b)For Deck Slab
Plain Cement Concrete 1:3:6 Mix (one part cement, three part sand and six part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Supplying, Fabricating and placing in position TMTsteel bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete as per TNDSS NO: 86
Reinforced Cement Concrete 1:1.5:3 Mix (One part cement, One Point five part m sand and Three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications.as per TNDSS NO: 30
Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete.
MR Palanisamy
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_443374.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid