Loading…
Loading…
Tender Value
₹42.0 L
EMD Value
₹42,050
Closing Date
15 Sept 2026, 5:30 pm4d left
Karnataka Power Transmission Corporation Limited
Md Shabaz Ahmed
Construction of New Control Room Building at 110kV sub-station Afzalpur
KPTCL/2026-27/BD/WORK_INDENT4089
KPTCL/2026-27/BD/WORK_INDENT4089
Reserved
Buildings
Two Tender Document System(Two Cover)
KPTCL CEE Transmission Zone Office Kalburgi
7 documents required · 7 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
Proposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)
Refer NIT
All Self declarations with signature
₹1,060
₹42,050
4 Sept 2026
31 Aug 2026
17 Sept 2026
14 Sept 2026
Attach Certificate for each work indicated above, in Format 1, obtained from the Competent Authority
Place
Countersigned by the Employer in charge
FORMAT 2
Information of the works for which Tenderer has submitted Tender
Project Name
Place
TENDERER (Signature & Seal)
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
Estimate for Construction of New Control Room Building at 110KV Afzalpur
Footings
Plinth beam
Hoz (PB1)
Hoz (PB1)
Hoz (PB1)
Ver (PB1)
Ver (PB1)
Deductions of column for PB
Column
Column
Curtain wall (only for outer wall)
Deductions (C. Wall for footing)
Total
Basic Rate
Deduct 5% per m³ for manual tamping
Total
i) Earthwork excavation
ii) PCC bed
Footings
Plinth beam
Hoz (PB1)
Hoz (PB1)
Hoz (PB1)
Ver (PB1)
Ver (PB1)
Hoz (PB2)
Curtain wall (only for outer wall)
Deductions (C. Wall for footing)
ii) RCC M25
Footing
Plinth beam
Hoz (PB1)
Hoz (PB1)
Hoz (PB1)
Ver (PB1)
Ver (PB1)
Hoz (PB2)
Curtain wall (only for outer wall)
Deductions (C. Wall for footing)
Column upto GL
iv) Basment
Battery Room
Office Room
CR Back along SF
Total
Footings Below
PB Below
Hoz (PB1)
Hoz (PB1)
Hoz (PB1)
Ver (PB1)
Ver (PB1)
Hoz (PB2)
Ded. of PB bed for column
Below Flooring
Battery Room
Office Room
Flagging
Front & Back side
Left & Right Side (CR)
Steps
Total
Footings
F1 10@180 along 'l' & 'b'
F2 12@180 along 'l' & 'b'
F3 12@150 along 'l' & 'b'
F3(a) 12@150 along 'l'
F3(a) 12@150 along 'b'
Curtain wall Hoz 8 @ 200
Curtain wall Ver 8 @ 200
Deductions (C. Wall for footing)
Deductions (C. Wall for footing)
Columns
Outer Stirrups 8mm @ 190 c/c
Inner Stirrups 8mm @ 190 c/c
Outer Stirrups 8mm @ 190 c/c
Inner Stirrups 8mm @ 190 c/c
C3 8#12 Upto PB
Outer Stirrups 8mm @ 190 c/c
Inner Stirrups 8mm @ 190 c/c
Plinth Beams
PB1 bottom straight 3#12
PB1 top straight 2#16
PB1 top extra 1#16 End
PB1 top extra 1#16 Mid
PB1 top extra 1#16 Mid
PB1 top extra 1#16 End
PB1 bottom straight 3#12
PB1 top straight 2#16
PB1 top extra 1#16 End
PB1 top extra 1#16 Mid
PB1 top extra 1#16 End
PB1 bottom straight 3#12
PB1 top straight 2#16
PB1 top extra 1#16 End
PB1 top extra 1#16 Mid
PB1 top extra 1#16 End
PB1 bottom straight 3#12
PB1 top straight 2#16
PB1 top extra 1#16 End
PB1 top extra 1#16 Mid
PB1 top extra 1#16 End
PB1 bottom straight 3#12
PB1 top straight 2#16
PB1 top extra 1#16 End
PB2 bottom straight 2#12
PB2 top straight 2#12
All PB1 stirrups 8 @ 150 c/c
PB2 stirrups 8 @ 150 c/c
Lintels
LB 1 Bottom 3#12
LB 1 Top 3#12
LB 2 Bottom 2#10
LB 2 Top 2#10
All LB 1 Stirrups 8mm @ 150 c/c
LB 2 Stirrups 8mm @ 150 c/c
Canopy
MD Main 8mm @ 150 c/c
MD Distribution 8mm @ 200 c/c
Chajja
W1 Main 8mm @ 150 c/c
W1 Distribution 8mm @ 200 c/c
D1 Main 8mm @ 150 c/c
D1 Distribution 8mm @ 200 c/c
D2 Main 8mm @ 150 c/c
D2 Distribution 8mm @ 200 c/c
D3 Main 8 @ 150c/c
D3 Dist. 8 @ 200c/c
W1+D3 Main 8mm @ 150 c/c
W1+D3 Dist. 8mm @ 200 c/c
Roof Beams
RB1 bottom 3#12
RB1 top 2#16
RB1 top 1#16 extra End
RB1 top 1#16 extra Mid
RB1 top 1#16 extra Mid
RB1 top 1#16 extra End
RB1 bottom 3#12
RB1 top 2#16
RB1 top 1#16 extra End
RB1 top 1#16 extra Mid
RB1 top 1#16 extra Mid
RB1 top 1#16 extra End
RB1 bottom 3#12
RB1 top 2#16
RB1 top 1#16 extra End
RB1 top 1#16 extra Mid
RB1 top 1#16 extra Mid
RB1 top 1#16 extra End
RB1 bottom 3#12
RB1 top 2#16
RB1 top 1#16 extra End
RB1 top 1#16 extra Mid
RB1 top 1#16 extra Mid
RB1 top 1#16 extra End
RB1 bottom 3#12
RB1 top 2#16
RB1 top 1#16 extra End
RB1 top 1#16 extra Mid
RB1 top 1#16 extra Mid
RB1 top 1#16 extra End
RB1 all stirrups 8 @ 150
Roof Slab
Main 10 @ 150 c/c
Main 8 @ 200 c/c
Main 10 @ 150 c/c
Main 8 @ 200 c/c
Extra End 10 @ 300 c/c
Extra Mid 10 @ 300 c/c
Total
Say Total
Footing
Total
Column
C3-(F1) (Upto PB bottom)
Total
Plinth Beam
Ded for column
Ded for column
Ded for column
Ded for column
Roof Slab
offset
Total
Lintel
Ded for column
Ded for column
Ded for column
Roof Beam
Ded for column
Ded for column
Ded for column
Ded for column
Total
Canopy
Chajja W1
Chajja D1
Chajja D2
Chajja D3
Chajja W1+D3
Total
Weather proofing to roof slab
offset
Fillet L/W
Fillet S/W
Total
Roof Slab
offset
Total
Wall (PB top to RB bottom)
D1 & D2 Steps
Ist step
IIIrd
Toilet Steps
Basement+Ist step
IIIrd
Deductions
Column
Column
Column
LB1(Hoz)
MLB & LB2(Hoz)
LB1(Hoz)
LB1/LB2 (Ver)
LB1 (Ver)
LB1(Hoz)
LB1 (Ver)
others etc.
Total
Office Room
G WC & UR
Parapet L/W
Parapet S/W
Parapet Offset
Deductions
Ded for head room off
Total
Parapet L/W
Parapet S/W
Parapet Offset
Deductions
Ded for head room off
Total
Front & Back Wall
Side walls
Ent. Steps & Ramp bsmt.
Treads
Step Side 1
Step Side 2
Step Side 3
Step Side 4
Ramp Side
Toilet Steps
Treads
Step Side 1
Step Side 2
Step Side 3
Step Side 4
Canopy (top & bottom)
Chajja W1
Chajja W2
Chajja W3
Chajja W2-FG
Chajja D3+V2+D2+V2+V2
Chajja V2
Canopy (sides)
Chajja W1
Chajja W2
Chajja W3
Chajja W2-FG
Chajja D3+V2+D2+V2+V2
Chajja V2
Parapet L/W Outer
Parapet S/W Outer
Parapet L/W Inner
Parapet S/W Inner
Parapet offset Outer
Parapet offset Inner
Parapet L/W top
Parapet S/W top
Parapet offset top
Deductions
Parapet offset Outer
Parapet offset Inner
Parapet offset top
Total
Office
Store
Battery
Gents WC
Urinals
Ladies WC
Ladies WC outer
Landing & Flights
Total
Office L/W
Office S/W
Store L/W
Store S/W
Battery L/W
Battery S/W
Gents WC L/W & S/W
Urinals L/W
Urinals S/W
Ladies WC L/W
Ladies WC S/W
Ladies WC outer L/W
Ladies WC outer S/W
Entire Lobby L/W
Entire Lobby S/W
Deductions
Total
Rain water Downtake pipe
Total
Total
Total
Total
Total
a) Aldrop (MS) 250mm long MR
Add fixing charges 10%
Add contractors profit 10%
Total
Add fixing charges 10%
Add contractors profit 10%
Total
Add fixing charges 10%
Add contractors profit 10%
Total
(a) Window (two track)
(i) Frame
Top Horizontal
Bottom Horizontal
Vertical
(ii) Shutter section
Horizontal
Vertical (outer)
Vertical (interlock)
(b) Ventilator
(i) Frame
Horizontal
Vertical
Total
W1 glass
V1 glass
D1 ventilator glass
D2 ventilator glass
D3 ventilator glass
Total
Skirting
Skirting
Batt. Room
Skirting
Skirting
Office Room
Skirting
Skirting
Others Such as Steps etc.
Total
Total
LT & GT L/W
LT & GT S/W
Deductions
Total
Material Rate
Add overheadcharges '10%'
Add contractors profit '10%'
Total
Material Rate
Add overheadcharges '10%'
Add contractors profit '10%'
Total
(b) 110mm dia (WC to ST)
Electrification
a) 2.5sqmm
a) Short Point up to 3m from tapping point to outlet via switch
Sub-total
Total Rs
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tender Capacit_formats.xlsx
Others - Tender capacity formates • 0.01 MB
KW-2 Tender document 110kV Afzalpur.docx
Tender Document • 0.08 MB
Self Declarations.docx
Others - Self declarations • 0.03 MB
nit 110kV Afzalpur.doc
Instructions to Tenderers • 0.08 MB
Estimate.xlsx
Others - Estimate • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .