| 1 | L1₹3.5 LAdmitted-Finance BINA ROAD PARASI P O KAKRI DISTT SONBHADRA UP | SONBHADRA | UP | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹4.4 L+₹92,400 (26.4%)Admitted-Finance PO AMLOHRI NAWANAGAR DISTT SINGRAULI MP | SINGRAULI | MP | ₹4.4 L+₹92,400 (26.4%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical NOT COMPLIED |
| Sl No | Description | Qty | Unit | M/S P R ENTERPRISES L2 | CHANDRA MOTOR REWINDING WORKS L1 |
|---|---|---|---|---|---|
| 1.00SCOPE OF WORK As per NIT | |||||
| 1.01 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 30kW / 40HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | 4 | Job | 29,600 ₹1,18,400 Lowest | 45,000 ₹1,80,000 |
| 1.02 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 11kW; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | 4 | Job | 19,100 ₹76,400 | 15,500 ₹62,000 Lowest |
| 1.03 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 5.5kW / 7.5 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | 4 | Job | 14,000 ₹56,000 | 9,500 ₹38,000 Lowest |
| 1.04 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 2.25kW / 3 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | 8 | Job | 12,000 ₹96,000 | 4,500 ₹36,000 Lowest |
| 1.05 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 1.10kW / 2 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | 8 | Job | 8,500 ₹68,000 | 3,200 ₹25,600 Lowest |
| 1.06 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 0.75kW / 1 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | 4 | Job | 7,000 ₹28,000 | 2,200 ₹8,800 Lowest |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - |
Tender Value
Refer Docs
EMD Value
₹7,000
Closing Date
16 Jun 2026, 11:00 amClosed
GM (Excavation), Dudhichua Area
Office of the GM (Excavation), Dudhichua Project PO Khadia, Distt. Sonebhadra, UP - 231222
Offloading work to outside agency for Repairing and Rewinding of various capacity AC Motors of EOT Cranes Lathe Machines and PH1900AL ER shovels of Dudhichua Project
2026_NCL_360782_1
DCH/GM (Excv)/Tender/Shovel /2026-27/17
Open Tender
Excavation Department Work
Item Rate
365 days
NCL, Dudhichua Project
Please refer Tender documents
6 documents required · 6 mandatory
₹7,000
5 Aug 2026
5 Jun 2026
17 Jun 2026
5 Jun 2026
16 Jun 2026
6 Jun 2026
5 Jun 2026 - 13 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCOPE OF WORK As per NIT | |||||
| 1.01 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 30kW / 40HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | - | Job | - | - |
| 1.02 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 11kW; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | - | Job | - | - |
| 1.03 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 5.5kW / 7.5 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | - | Job | - | - |
| 1.04 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 2.25kW / 3 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | - | Job | - | - |
| 1.05 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 1.10kW / 2 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | - | Job | - | - |
| 1.06 | Total cost (Exclusive of GST) including Labour charges, Contractor`s profit, Material cost, Less cost for scrap copper, Heating charge for complete Repairing of 0.75kW / 1 HP; 3-phase; 415 V AC Motor as per SCOPE OF WORK & NIT | - | Job | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.72 MB
ANNEXURES.pdf
Tender Documents • 0.69 MB
ITB_COC_ATC.pdf
Tender Documents • 0.82 MB
BOQ_373659.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .