| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAdmitted-Finance | ₹3.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.6 Cr+₹12.0 L (3.48%)Admitted-Finance | ₹3.6 Cr+₹12.0 L (3.48%) | L2 | Admitted-Finance |
| 3 | L3₹3.6 Cr+₹13.7 L (3.95%)Admitted-Finance | ₹3.6 Cr+₹13.7 L (3.95%) | L3 | Admitted-Finance |
| 4 | L4₹3.6 Cr+₹15.1 L (4.36%)Admitted-Finance | ₹3.6 Cr+₹15.1 L (4.36%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ASHUTOSH ENTERPRISES L3 | KUMAR TRADING COMPANY L4 | AARVANSS BUILDWELL AND INFRACON LLP L2 | Jagad Electrical & Fabricators L1 |
|---|---|---|---|---|---|---|---|
| 1.00Part -A (Supply) | |||||||
| 2.00TOWERS | |||||||
| 3.00 | Fabrication, Galvanising, Inspection & supply of 220KV DC tower including stubs, extensions & stub setting template, as per drawing & BOM. | 214 | MT | 80,000 ₹1,71,20,000 | 81,200 ₹1,73,76,800 | 82,500 ₹1,76,55,000 | 79,000 ₹1,69,06,000 Lowest |
| 4.00 | Hot Dip Galvanised nuts & bolts with washers. | 8.29 | MT | 1,10,000 ₹9,11,900 | 1,11,360 ₹9,23,174.4 | 1,06,500 ₹8,82,885 | 1,05,000 ₹8,70,450 Lowest |
| 5.00TOWER ACCESSORIES | |||||||
| 6.00 | Number Plate | 25 | Nos. | 425 ₹10,625 | 464 ₹11,600 | 325 ₹8,125 Lowest | 400 ₹10,000 |
| 7.00 | Danger Plate | 25 | Nos. | 425 ₹10,625 | 464 ₹11,600 | 325 ₹8,125 Lowest | 400 ₹10,000 |
| 8.00 | Phase Plate | 50 | Set | 425 ₹21,250 Lowest | 464 ₹23,200 | 825 ₹41,250 | 700 ₹35,000 |
| 9.00 | Pipe type earthing material for towers | 14 | Set | 740 ₹10,360 Lowest | 805 ₹11,270 | 4,200 ₹58,800 | 4,300 ₹60,200 |
| 10.00 | 160 KN Composite Silicon Rubber Insulators for 220 KV tension towers. | 180 | Nos. | 4,400 ₹7,92,000 Lowest | 4,750 ₹8,55,000 | 11,870 ₹21,36,600 | 10,800 ₹19,44,000 |
Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
22 Apr 2021, 5:00 pmClosed
SE ETC MEERUT
130 D PAARESHAN BHAWAN VICTORIA PARK MEERUT
WORK TENDER
2021_UPTCL_582211_1
T-05/21-22/ETC/MT
Open Tender
Electrical Works
Item Rate
120 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,850
SE ETC MEERUT
₹2.8 L
22 May 2021
13 Apr 2021
23 Apr 2021
13 Apr 2021
22 Apr 2021
13 Apr 2021
Amount
Part -A (Supply)
TOWERS
Fabrication, Galvanising, Inspection & supply of 220KV DC tower including stubs, extensions & stub setting template, as per drawing & BOM.
Hot Dip Galvanised nuts & bolts with washers.
TOWER ACCESSORIES
Number Plate
Danger Plate
Phase Plate
Pipe type earthing material for towers
160 KN Composite Silicon Rubber Insulators for 220 KV tension towers.
70 KN Composite Silicon Rubber Insulators for 220 KV suspension Towers
HARDWARE SUITABLE FOR ACSR Zebra
Single Tension Fitting
Double Tension Fitting
Single Suspension Fitting
Vibration Damper
Mid Span Joint
P A Rod
Bird Guard
OPGW & Accessories
48 Fibre OPGW Fibre Optic Cable
Joint Box (48 Fibre)
FODP 48 F
Fibre Optic Approach Cable
Part-B
a) Survey including prepration of profile & schedule of materials, marking of locations (Route Length)
b) Check survey & final peg marking. (Route length)
Cost of excavation of 220KV DC type tower foundation pits including all earth work, back filling watering and leveling.
Setting of stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for following 220KV D/C type towers:-
DC+0 /DC+5/ DB+0/DB+5/DA+0/DC+15
Cost of Concreting for of 220KV D/C type tower foundation including cost of cement coarse sand, stone grid, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars with 1:2:4 mix concrete (RCC).
Erection of super structure of 220KV DC type tower and their extensions including all works above ground level and fitting of danger , number & phase plate, Bird guard etc but excluding hoisting of insulator, hardware & accessories.
Tack wedling of all the bolts up to the height of one section or 5 Mtr. from ground level whichever is higher with three tacks of 10mm/12mm elctrode & applciation of Zinc rich point on the affected surface including cost of materials.
Stringing of Zebra conductor including de-hoisting of all the necessary hardwares & accessories between tower ALL SIX POWER CONDUCTORS.
Laying, stringing, tensioning, clamping, jointing including fittings of all necessary hardware and accessories of OPGW termination at Sub-Station, end to end connectivity & testing etc. on 220 KV Line.
Installation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding and placing them in foundation pits.
Earthing of tower
Supply & Installation of Hardware Set for 48 Fibre OPGW
Supply & Installation of Hardware Set for 48 Fibre Optic Approach Cable
AARVANSS BUILDWELL AND INFRACON LLP
ASHUTOSH ENTERPRISES
KUMAR TRADING COMPANY
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
Tenderdoc1.pdf
Tender Documents • 0.09 MB
BOQ_894979.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .