Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.0 LAccepted-AOC | L1 | Accepted-AOC Bein L1 | |
| 2 | L2₹48.5 L+₹50,793.88 (1.06%)Rejected-Finance | L2 | Rejected-Finance Not Being L1 | |
| 3 | L3₹51.0 L+₹3.0 L (6.23%)Rejected-Finance | L3 | Rejected-Finance Not Being L1 | |
| 4 | L4₹54.1 L+₹6.1 L (12.7%)Rejected-Finance 3 100 2 KOTIAN CO NH66 KULAI POST SURATHKAL MANGALORE DAKSHINA KANNADA KARNATAKA 575019 | DAKSHINA KANNADA | KARNATAKA | 575019 | L4 | Rejected-Finance Not Being L1 | |
| 5 | L5₹55.0 L+₹7.0 L (14.6%)Rejected-Finance SUMOHAN STATION ROAD MAKERI KARWAR UK KARNATAKA 581 306 | KARWAR | UTTARA KANNADA | KARNATAKA | 581306 | L5 | Rejected-Finance Not Being L1 |
| Sl No | Description | Qty | Unit | sanjay prabhu L5 | KVL CONSTRUCTION L3 | KOTIAN -ECC L4 | SHRI MALLIKARJUN BATTERY AND ELECTRICAL WORKS L9 | ABDUL RAHIM L2 | VKD CONSTRUCTION L7 | M/S. B G GAONKAR L1 | M/S VERNEKAR AGENCIES L6 | H S KRISHNA ELECTRICALS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of stone/ boulder masonry, block masonry built in cement mortar including all quoins, arches, pillars etc., but excluding ashlars facings, dressed stonework and precast concrete articles etc all as specified and directed. | 76.5 | Cum | 1,692 ₹1,29,438 | 2,500 ₹1,91,250 | 1,888 ₹1,44,432 | 1,650 ₹1,26,225 | 500 ₹38,250 Lowest | 1,700 ₹1,30,050 | 1,000 ₹76,500 | 1,500 ₹1,14,750 | 1,550 ₹1,18,575 |
| 2.00 | M&L for providing precast cement concrete block masonry with solid blocks exceeding 10cm width, type C-1, using 20mm graded stone aggregate and set in cement mortar (1:6) complete all as specified and directed. | 23.5 | Cum | 8,693 ₹2,04,285.5 | 13,500 ₹3,17,250 | 9,700 ₹2,27,950 | 8,775 ₹2,06,212.5 | 8,500 ₹1,99,750 Lowest | 8,900 ₹2,09,150 | 9,000 ₹2,11,500 | 8,900 ₹2,09,150 | 8,500 ₹1,99,750 Lowest |
| 3.00 | Description all as per item No.02 above but except precast blocks i.e using serviceable precast blocks obtained from item No 01 herein before all as specified and directed. | 10 | Cum | 1,425 ₹14,250 | 13,500 ₹1,35,000 | 1,585 ₹15,850 | 1,625 ₹16,250 | 1,200 ₹12,000 | 1,500 ₹15,000 | 900 ₹9,000 Lowest | 1,525 ₹15,250 | 1,700 ₹17,000 |
| 4.00 | M&L for walling of random rubble, masonry uncoursed, well bonded, bedded and solidly hearted built in cement mortar 1: 6 all as specified and directed. | 28 | Cum | 4,685 ₹1,31,180 | 13,800 ₹3,86,400 | 5,222 ₹1,46,216 | 4,550 ₹1,27,400 | 5,000 ₹1,40,000 | 4,685 ₹1,31,180 | 4,200 ₹1,17,600 Lowest | 4,600 ₹1,28,800 | 4,500 ₹1,26,000 |
| 5.00 | Description all as per item No.04 above but except stone i.e using serviceable stone obtained from item No 01 herein before all as specified and directed | 15 | Cum | 2,920 ₹43,800 | 12,000 ₹1,80,000 | 3,260 ₹48,900 | 2,920 ₹43,800 | 2,000 ₹30,000 Lowest | 2,920 ₹43,800 | 2,000 ₹30,000 Lowest | 3,000 ₹45,000 | 3,000 ₹45,000 |
| 6.00 | M&L for Flush pointing to block in course or ashlar masonry on concrete block walling in CM 1:4 complete all specified and directed | 15 | 10 Sqm | 725 ₹10,875 | 300 ₹4,500 Lowest | 778 ₹11,670 | 850 ₹12,750 | 500 ₹7,500 | 700 ₹10,500 | 600 ₹9,000 | 800 ₹12,000 | 800 ₹12,000 |
| 7.00 | M&L for Raised pointing to Random or polygonal rubble uncoursed masonry or concrete block walling or brought up to courses in CM 1:4 | 10 | 10 Sqm | 2,700 ₹27,000 | 1,000 ₹10,000 Lowest | 2,946 ₹29,460 | 2,640 ₹26,400 | 1,800 ₹18,000 | 2,640 ₹26,400 | 2,500 ₹25,000 | 3,700 ₹37,000 | 2,500 ₹25,000 |
| 8.00 | M&L for RCC (1:2:4) type-B1 using 20 mm graded stone aggregate as in lintels up to 1.5 m clear span, sills, steps; seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings up to 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs etc complete all as specified and directed. Note: Reinforcement shall be measured and paid separately. | 1.5 | Cum | 9,950 ₹14,925 | 9,000 ₹13,500 Lowest | 10,645 ₹15,967.5 | 9,650 ₹14,475 | 9,000 ₹13,500 Lowest | 9,540 ₹14,310 | 9,100 ₹13,650 | 10,500 ₹15,750 | 9,700 ₹14,550 |
| 9.00 | Rectifying complaints of bathroom / kitchen / WHB / urinals / WCs of any pattern by cleaning the blockage of gully trap and Nahani trap and make it fully functional by flushing with sufficient water including disposal of sludge etc away from residential area and burying in borrow pits complete all as specified and directed. Notes:- (a) Earth work if any and making good to disturbed surface shall be deemed to be included in unit rate. (b)Unit rate quoted shall include taking out sludge away from residential area and burying in borrow pits. (c) The payment shall be done by complaint wise. (d) The period of rectifying each complaints is maximum 48 hrs and in case of failure to rectify the complaint in the stipulated period the necessary recovery at the rate of Rs 150 / per day per complaint shall be deducted from next due to contractor without any notice. (e) The contractor shall provide cleaning personal along with tools, bucket ,etc to rectify the complaints. | 500 | Each Complaint | 200 ₹1,00,000 | 120 ₹60,000 | 150 ₹75,000 | 180 ₹90,000 | 90 ₹45,000 Lowest | 180 ₹90,000 | 120 ₹60,000 | 180 ₹90,000 | 180 ₹90,000 |
| 10.00 | M&L for removal of blockage and cleaning of sewage lines of 100 mm bore by rodding from manholes to manholes or manholes to cleaning eyes, taking out all debris, sludges and solid materials from sewage lines and removing outside MD land and well flushing with water complete all as specified and directed. | 1,500 | RM | 130 ₹1,95,000 | 70 ₹1,05,000 | 100 ₹1,50,000 | 135 ₹2,02,500 | 60 ₹90,000 Lowest | 120 ₹1,80,000 | 130 ₹1,95,000 | 130 ₹1,95,000 | 130 ₹1,95,000 |
Tender Value
₹49.8 L
EMD Value
₹99,600
Closing Date
20 Jun 2026, 6:00 pmClosed
GE (SB) KARWAR
GARRISON ENGINEER (SEABIRD) KARWAR Naval Base, Sankrubagh (PO) Karwar - 581308
REPAIR MAINTENANCE CLEANING OF SEPTIC TANK MANHOLES SEWAGE LINES GULLY TRAPS INCLUDING REPAIRS TO MANHOLES COVER SLABS AND STONE BLOCK MASONRY AT INHS PATANJALI NCHC MES AREA AND SITE E OF NAVAL BASE AREA KARWAR
2026_MES_768769_1
8490/E8
Open Tender
Civil Works
Item Rate
330 days
GE (SB) KARWAR
AS PER NIT
8 documents required · 8 mandatory
₹500
Yes
GE (SB) KARWAR
₹99,600
Yes
23 Jul 2026
30 May 2026
22 Jun 2026
30 May 2026
20 Jun 2026
13 Jun 2026
30 May 2026 - 6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of stone/ boulder masonry, block masonry built in cement mortar including all quoins, arches, pillars etc., but excluding ashlars facings, dressed stonework and precast concrete articles etc all as specified and directed. | - | Cum | 1.25 | - |
| 2 | M&L for providing precast cement concrete block masonry with solid blocks exceeding 10cm width, type C-1, using 20mm graded stone aggregate and set in cement mortar (1:6) complete all as specified and directed. | - | Cum | - | - |
| 3 | Description all as per item No.02 above but except precast blocks i.e using serviceable precast blocks obtained from item No 01 herein before all as specified and directed. | - | Cum | 10 | - |
| 4 | M&L for walling of random rubble, masonry uncoursed, well bonded, bedded and solidly hearted built in cement mortar 1: 6 all as specified and directed. | - | Cum | 11 | - |
| 5 | Description all as per item No.04 above but except stone i.e using serviceable stone obtained from item No 01 herein before all as specified and directed | - | Cum | 10 | - |
| 6 | M&L for Flush pointing to block in course or ashlar masonry on concrete block walling in CM 1:4 complete all specified and directed | - | 10 Sqm | 11 | - |
| 7 | M&L for Raised pointing to Random or polygonal rubble uncoursed masonry or concrete block walling or brought up to courses in CM 1:4 | - | 10 Sqm | 12 | - |
| 8 | M&L for RCC (1:2:4) type-B1 using 20 mm graded stone aggregate as in lintels up to 1.5 m clear span, sills, steps; seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings up to 60 cm in height, copings, kneelers, apex stones, bed plates, kerbs etc complete all as specified and directed. Note: Reinforcement shall be measured and paid separately. | - | Cum | 13 | - |
| 9 | Rectifying complaints of bathroom / kitchen / WHB / urinals / WCs of any pattern by cleaning the blockage of gully trap and Nahani trap and make it fully functional by flushing with sufficient water including disposal of sludge etc away from residential area and burying in borrow pits complete all as specified and directed. Notes:- (a) Earth work if any and making good to disturbed surface shall be deemed to be included in unit rate. (b)Unit rate quoted shall include taking out sludge away from residential area and burying in borrow pits. (c) The payment shall be done by complaint wise. (d) The period of rectifying each complaints is maximum 48 hrs and in case of failure to rectify the complaint in the stipulated period the necessary recovery at the rate of Rs 150 / per day per complaint shall be deducted from next due to contractor without any notice. (e) The contractor shall provide cleaning personal along with tools, bucket ,etc to rectify the complaints. | - | Each Complaint | 14 | - |
| 10 | M&L for removal of blockage and cleaning of sewage lines of 100 mm bore by rodding from manholes to manholes or manholes to cleaning eyes, taking out all debris, sludges and solid materials from sewage lines and removing outside MD land and well flushing with water complete all as specified and directed. | - | RM | 15 | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
Tender8490.pdf
Tender Documents • 0.68 MB
BOQ_860941.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .