Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 LAccepted-Finance | 1 | Accepted-Finance accept |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
20 Jun 2025, 2:00 pmClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER DISTRIBUTION/TENKASI
Execution of contract towards Extension of supply works for street light at various location and improvement works in Surandai Sub division of Tenkasi Division
2025_EB_565923_1
EE/D/TSI/ETW-009/25-26
Open Tender
Electrical and Maintenance Works
Works
90 days
tenkasi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,000
Yes
2 Jul 2025
6 Jun 2025
21 Jun 2025
7 Jun 2025
20 Jun 2025
7 Jun 2025
Amount
Normal ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
Normal ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
Rocky ground- Excavation of Pole pits (1.25m * 0.5m*1.5m) for 7.32m, 7.5m, 8m, 8.23m poles
Rocky ground- Erection of 7.32m, 7.5m, 8m, 8.23m poles
Normal ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
Normal ground- Erection of 9M & 9.14M poles
Normal ground- Excavation of pole pit (1.25m * 0.6m*2.19m) for RSJ Pole 36"
Normal ground- Erection of RSJ Pole 36"
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*1.83m) for 9M & 9.14M poles
Rocky ground- Erection of 9M & 9.14M poles
Rocky ground- Excavation of Pole pits (1.25m * 0.6m*2.19m) for RSJ Pole 36"
Rocky ground- Erection of RSJ Pole 36"
Transporting of poles from road side to pole pit - 7.32m, 7.5m, 8m, 8.23m RCC pole
Transporting of poles from road side to pole pit - 9m, 9.14m RCC/PSC pole
Transporting of poles from road side to pole pit - RSJ Pole 36"
Loading and Unloading of poles - 7.32m, 7.5m, 8m, 8.23m RCC pole
Loading and Unloading of poles - 9m, 9.14m RCC/PSC pole
Loading & unloading of RSJ pole 36"
Loading and Unloading of Line Materials
Concreting of poles as per Board Standards (2'*2'*5'). The materialsuch as cement, sand, jelly, etc., have to be supplied by the contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour charges.for placing Transporting of sant,jally,from box and water curing for 14 days etc,.)
Coping of pole (0.6m*0.6m*0.35m)
Concreting of stay (o.3m * 0.3m * 1.5m) including materials except cement
Coil earthing per pole & pole earthing
Normal ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Normal ground- Erection of stay set
Rocky ground- Excavation of stay pit (1.00m * 0.5m*1.5m) with transporting of materials to site (For stay set)
Rocky ground- Erection of stay set
Fixing of V & Channel cross arm 3.5' including transporting of materials from road side to site
Fixing of V & Channel cross arm 4.5' including transporting of materials from road side to site
Fixing of LT 3Phase cross arm including transporting of materials from road side to site
Fixing of LT 1Phase cross arm including transporting of materials from road side to site
Fixing of HT LT TI fitting including transporting of materials from road side to site
Erection of HT Side arm with stud including transporting of materials from road side to site
Erection of LT Side arm with stud including transporting of materials from road side to site
Fixing of insulator HT/LT(per location) including transporting of materials from road side to site
Fixing of Tapping channel X arm
Fixing of 11 KV Disc
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/2.59 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/3.35 ACSR (1Span/Wire)
HT lines - Stringing, Sagging, binding including transporting of materials from road side to site-For 7/4.09 ACSR (1Span/Wire)
For HT line clear works for For 7/2.59 ACSR (1Span/Wire)
For HT line clear works for For 7/3.35 ACSR (1Span/Wire)
For HT line clear works for For 7/3.35 ACSR (1Span/Wire)
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/2.59 ACSR
LT lines - Stringing, Sagging, binding including transporting of materials from road side to site- For 7/3.35 ACSR
For LT line clear works for For 7/2.59 ACSR (1Span/Wire)
For LT line clear works for For 7/3.35 ACSR (1Span/Wire)
For LT line clear works for For 7/4.09 ACSR (1Span/Wire)
Split Neutral gaurding
Flat guarding
Erection/Dismantling of transformer upto 200KVA
Erection/Dismantling of transformer upto 250KVA
Erection of feeder cable with open type fuse unit per feeder
Erection of feeder cable with open type fuse unit per feeder and for each addl feeder
Erection of feeder cable Bus bar arrangement with open type
Erection of DT meter
Loading of Distribution transformer below 200KVA
Unloading of Distribution transformer below 200KVA
Loading of Distribution transformer 250KVA
Unloading of Distribution transformer 250KVA
Erection of center support (Incl. Concrete)
Dismantling of center support
Alteration of clamps
Drilling less than 23mm holes per hole/slatted hole
Cutting of channel
Cutting of Flat
Cutting of Angle
RSJ pole cutting
LT-Changing of pin point to cut point
HT-Changing of pin point to cut point
Erection of Single Phase service connection
Erection of Three Phase service connection
Erection of CFL Lamp
Erection of Street light Switch box
Dismantling of deteriorated poles with concrete in damaged condition including grill separation etc.,
Dismantling of poles without concrete in damaged condition including grill separation etc.,
Dismantling of RSJ pole
Providing jumpering at cut point
Tree clearence in HT or LT location- For ordy. Tree clearence and Throng bushes & trees
Tree clearence in HT or LT location- For coconut trees and Palmrah trees
Set right of leaning of HT pole or LT pole including X arms, TI fittings
Resagging of 7/2.59 ACSR conductor
Resagging of 7/3.15 ACSR conductor
Resagging of 7/4.09 ACSR conductor
Erection of tapping structure(Double Pole) complete as per board standard including painting
Erection of Distribution Transformer structure complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer.
Erection of 11 KV single pole Structure including erection of DT complete as per TNEB standard including painting, feeders arrangrment, colour washing of RCC poles etc.. Fixing of poles type to be unit HT / LT LAS and jumpering 3 Nos Earth pits with earth trough except erection of Distribution Transformer.
Erection of Guarding X arm
Dismantling of stay set complete including stay rod
Dismantling of stay set complete Without stay rod
Dismantling of conductor of 7/2.59 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor 7/3.35 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of conductor 7/4.09 including transporting the conductors to the nearest road side and stocking in coils
Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side
Dismantling of V Cross arm
Dismantling of 3 phase X Arm
Dismantling of Single phase X arm
Dismantling of HT/LT TI Fitting
Dismantling of HT/ LT pin Insulators
Dismantling of Strain Disc
Dismantling of Tapping channel X arm
Proving 'PA' Jumpering
Hiring of JCB
Hiring of Crane
Exceeding 1 Hour for every hour
Transporting of Charges of DT / Line materials using private vehicle upto 20 KM ( Up and Down)
Beyond 20 KM for every KM
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .