Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.4 LAccepted-Finance | ₹45.4 L | L1 | Accepted-Finance BEING LOWEST BIDDER |
| 2 | L2₹46.6 L+₹1.2 L (2.54%)Rejected-Finance NEAR LIC OFFICE KALAIGNAR ARIVALAYAM SHOP ROOM NO7 GROUND FLOOR OF BACK SIDE PHOENIX BAY SRI VIJAYA PURAM 744101 | SRI VIJAYA PURAM | SOUTH ANDAMAN | ANDAMAN AND NICOBAR ISLANDS | 744101 | ₹46.6 L+₹1.2 L (2.54%) | L2 | Rejected-Finance NOT BEING LOWEST BIDDER |
| 3 | L3₹46.9 L+₹1.5 L (3.33%)Rejected-Finance | ₹46.9 L+₹1.5 L (3.33%) | L3 | Rejected-Finance NOT BEING LOWEST BIDDER |
| 4 | L4₹47.8 L+₹2.4 L (5.29%)Rejected-Finance | ₹47.8 L+₹2.4 L (5.29%) | L4 | Rejected-Finance NOT BEING LOWEST BIDDER |
| 5 | L5₹48.4 L+₹3.0 L (6.54%)Rejected-Finance B 33 171 PATEL NAGAR GURUDASPUR ROAD PATHANKOT 145001 | PATHANKOT | PATHANKOT | PUNJAB | 145001 | ₹48.4 L+₹3.0 L (6.54%) | L5 | Rejected-Finance NOT BEING LOWEST BIDDER |
| Sl No | Description | Qty | Unit | JAI DURGA CONSTRUCTION CO L8 | M/s Gurunath Construction L12 | SKY GROUP L15 | KULBHUSHAN AGGARWAL L7 | SHUSHANT ASSOCIATES L3 | Ravi Enterprises L16 | Tropical Refrigeration L13 | RK TRADERS L2 | SIMONS CONSTRUCTION L11 | PALANI ENTERPRISES L9 | NAVJEEVAN ENTERPRISES L6 | Chandra Construction Enterprises L14 | ABR Construction L10 | MGP Enterprises L4 | KAPOOR AUTOMOBILES L5 | SINGHAL ENGINEERS L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M&L for seven stage cleaning and sterilization of inside the OH Reservoir upto 30 mtr staging, Semi UG Sumps, UG Sumps, Storage tanks, Fountain of the following capacities once or if any water contaminated, through bacteriological treatment by using mechanical and scientific method.
Seven stages cleaning process are as under:-
(a) First Stage is to drain out the water by using exit valve or high capacity mechanised dewatering.
(b) Second stage is cleaning all the algae formation inside the tank by using a Anti bacterial Mechanical Surface scrubbing the walls of the tanks.
(c) Third strage is fresh water high pressure cleaning.
(d) Fourth stage Sludge Removing from the tank.
(e) Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner.
(f) Sixth stage is Anti Bacterial Spray within the tank and kills all suspended bacteria.
(g) Seventh stage of cleaning is to UV Radiation. NOTE : (i) Cleaning agencies will submit Govt Lab Test certificate of chemical using in cleaning process. All the cleaning & sterilization staffs should be under Accidental Insurance Coverage.
(ii) Outlet pipe of OHT should be plugged before cleaning the OHT to avoid entering scals and the same shall be reconnected after cleaning the OHT and the quoted rate is deemed to include for the provision.
(iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tanks sterilization.
(iv) The work shall be carried through specialized Agency.
(v) Entire T&P should be arranged by the contractor at their own. Only electric power & water shall be supplied by MES at all stipulated rate.
(vi) ''Date of Cleaning'' should be written over the outer surface of tank by synthetic enamel paint with lettering not less than 100mm height.
(vii) All safety equipments required like safety helmets, Gumboots, safety belt, mask, safety googles and necessary insurance for safety of working labours to execute the work is responsibility of the contractor and rates quoted shall be deemed to be inclusive of the same. Semi UG Sump (Raw Water) of capacity 75000 gallons at Prothrapur filtration plant | 1 | Each Job | 95,000 ₹95,000 | 56,200 ₹56,200 | 65,000 ₹65,000 | 55,600 ₹55,600 | 55,400 ₹55,400 | 68,000 ₹68,000 | 60,000 ₹60,000 | 66,000 ₹66,000 | 56,000 ₹56,000 | 55,700 ₹55,700 | 69,800 ₹69,800 | 60,000 ₹60,000 | 55,800 ₹55,800 | 68,000 ₹68,000 | 67,500 ₹67,500 | 55,200 ₹55,200 Lowest |
| 1.01 | UG Sump (Fresh Water) of capacity 75000 gallons at Prothrapur filtration plant | 2 | Each Job | 45,000 ₹90,000 Lowest | 56,000 ₹1,12,000 | 65,000 ₹1,30,000 | 55,550 ₹1,11,100 | 55,400 ₹1,10,800 | 68,000 ₹1,36,000 | 60,000 ₹1,20,000 | 66,000 ₹1,32,000 | 55,800 ₹1,11,600 | 55,600 ₹1,11,200 | 70,000 ₹1,40,000 | 60,000 ₹1,20,000 | 55,700 ₹1,11,400 | 68,000 ₹1,36,000 | 67,500 ₹1,35,000 | 55,200 ₹1,10,400 |
| 1.02 | UG Sump (Fresh Water) of capacity 2 lakh gallons at Prothapur Filtration Plant | 1 | Each Job | 46,500 ₹46,500 Lowest | 1,48,700 ₹1,48,700 | 1,50,000 ₹1,50,000 | 1,48,300 ₹1,48,300 | 1,47,000 ₹1,47,000 | 1,45,000 ₹1,45,000 | 1,55,000 ₹1,55,000 | 1,65,000 ₹1,65,000 | 1,48,600 ₹1,48,600 | 1,48,400 ₹1,48,400 | 1,53,800 ₹1,53,800 | 1,45,000 ₹1,45,000 | 1,48,500 ₹1,48,500 | 1,67,500 ₹1,67,500 | 1,65,000 ₹1,65,000 | 1,46,400 ₹1,46,400 |
| 1.03 | Ground level clarifloculator sump of capacity 4.5 lakh gallons including flush mixing chamber, RCC water channel at Prothrapur filtration plant | 1 | Each Job | 45,000 ₹45,000 Lowest | 2,20,900 ₹2,20,900 | 2,65,000 ₹2,65,000 | 2,20,400 ₹2,20,400 | 2,19,000 ₹2,19,000 | 2,45,000 ₹2,45,000 | 2,60,000 ₹2,60,000 | 2,45,000 ₹2,45,000 | 2,20,800 ₹2,20,800 | 2,20,500 ₹2,20,500 | 2,75,000 ₹2,75,000 | 2,45,000 ₹2,45,000 | 2,20,700 ₹2,20,700 | 2,55,000 ₹2,55,000 | 2,65,000 ₹2,65,000 | 2,18,500 ₹2,18,500 |
| 1.04 | Suction Gallary of capacity 7000 Gallon at Prothrapur filtration plant | 2 | Each Job | 6,500 ₹13,000 Lowest | 8,900 ₹17,800 | 13,500 ₹27,000 | 8,680 ₹17,360 | 8,600 ₹17,200 | 13,230 ₹26,460 | 13,000 ₹26,000 | 12,000 ₹24,000 | 8,850 ₹17,700 | 8,700 ₹17,400 | 13,000 ₹26,000 | 13,000 ₹26,000 | 8,800 ₹17,600 | 12,500 ₹25,000 | 13,500 ₹27,000 | 8,500 ₹17,000 |
| 1.05 | Filter Bed of capacity 7000 Gallon at Prothrapur filtration plant | 2 | Each Job | 25,200 ₹50,400 | 9,000 ₹18,000 | 13,500 ₹27,000 | 8,720 ₹17,440 | 8,600 ₹17,200 | 13,230 ₹26,460 | 13,250 ₹26,500 | 12,000 ₹24,000 | 8,950 ₹17,900 | 8,750 ₹17,500 | 13,000 ₹26,000 | 13,000 ₹26,000 | 8,900 ₹17,800 | 12,500 ₹25,000 | 13,500 ₹27,000 | 8,500 ₹17,000 Lowest |
| 1.06 | Over Head Tank of capacity 10000 Gallon at Prothrapur PH and Type I Qtrs | 2 | Each Job | 30,000 ₹60,000 | 10,350 ₹20,700 | 14,800 ₹29,600 | 9,985 ₹19,970 | 9,900 ₹19,800 | 14,230 ₹28,460 | 14,500 ₹29,000 | 13,800 ₹27,600 | 10,200 ₹20,400 | 10,000 ₹20,000 | 14,500 ₹29,000 | 14,500 ₹29,000 | 10,100 ₹20,200 | 14,500 ₹29,000 | 14,000 ₹28,000 | 9,800 ₹19,600 Lowest |
| 1.07 | Semi UG sump of capacity 2.65 lakh litres at STP 750 KLD | 1 | Each Job | 45,000 ₹45,000 Lowest | 45,800 ₹45,800 | 52,000 ₹52,000 | 45,400 ₹45,400 | 45,200 ₹45,200 | 51,000 ₹51,000 | 51,000 ₹51,000 | 49,000 ₹49,000 | 45,700 ₹45,700 | 45,500 ₹45,500 | 51,000 ₹51,000 | 51,000 ₹51,000 | 45,650 ₹45,650 | 51,000 ₹51,000 | 50,500 ₹50,500 | 45,000 ₹45,000 Lowest |
| 1.08 | Over Head Tank of capacity 3 lakh litres at MAP OHT | 1 | Each Job | 50,000 ₹50,000 | 6,000 ₹6,000 Lowest | 74,000 ₹74,000 | 59,400 ₹59,400 | 59,200 ₹59,200 | 72,500 ₹72,500 | 73,500 ₹73,500 | 69,000 ₹69,000 | 59,800 ₹59,800 | 59,500 ₹59,500 | 73,500 ₹73,500 | 73,800 ₹73,800 | 59,700 ₹59,700 | 71,200 ₹71,200 | 72,000 ₹72,000 | 59,000 ₹59,000 |
| 1.09 | Over Head Tank of capacity 2.25 lakh litres MAP OHT | 1 | Each Job | 65,000 ₹65,000 | 45,500 ₹45,500 | 54,000 ₹54,000 | 44,900 ₹44,900 | 44,650 ₹44,650 | 53,500 ₹53,500 | 56,500 ₹56,500 | 49,500 ₹49,500 | 45,200 ₹45,200 | 45,000 ₹45,000 | 5,300 ₹5,300 Lowest | 53,800 ₹53,800 | 45,100 ₹45,100 | 50,000 ₹50,000 | 51,000 ₹51,000 | 44,500 ₹44,500 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
3 Aug 2026, 6:00 pmClosed
GE Brichgunj Sri Vijaya Puram
GE Brichgunj Sri Vijaya Puram
CLEANING OF OH TANKS AND UG SUMPS ALONGWITH CONNECTED WORKS UNDER GE BRICHGUNJ SRI VIJAYA PURAM
2026_MES_777672_1
8814A
Open Tender
Civil Works
Item Rate
330 days
GE Brichgunj Sri Vijaya Puram
AS PER TENDER DOCUMENTS
9 documents required · 9 mandatory
₹500
Yes
₹90,000
Yes
1 Sept 2026
10 Jul 2026
6 Aug 2026
10 Jul 2026
3 Aug 2026
27 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M&L for seven stage cleaning and sterilization of inside the OH Reservoir upto 30 mtr staging, Semi UG Sumps, UG Sumps, Storage tanks, Fountain of the following capacities once or if any water contaminated, through bacteriological treatment by using mechanical and scientific method.
Seven stages cleaning process are as under:-
(a) First Stage is to drain out the water by using exit valve or high capacity mechanised dewatering.
(b) Second stage is cleaning all the algae formation inside the tank by using a Anti bacterial Mechanical Surface scrubbing the walls of the tanks.
(c) Third strage is fresh water high pressure cleaning.
(d) Fourth stage Sludge Removing from the tank.
(e) Fifth stage is cleaning the floor of water tank by industrial vaccum cleaner.
(f) Sixth stage is Anti Bacterial Spray within the tank and kills all suspended bacteria.
(g) Seventh stage of cleaning is to UV Radiation. NOTE : (i) Cleaning agencies will submit Govt Lab Test certificate of chemical using in cleaning process. All the cleaning & sterilization staffs should be under Accidental Insurance Coverage.
(ii) Outlet pipe of OHT should be plugged before cleaning the OHT to avoid entering scals and the same shall be reconnected after cleaning the OHT and the quoted rate is deemed to include for the provision.
(iii) Sterilization team will be comprised of at least 30% members who are minimum 03 months certificate holder in water tanks sterilization.
(iv) The work shall be carried through specialized Agency.
(v) Entire T&P should be arranged by the contractor at their own. Only electric power & water shall be supplied by MES at all stipulated rate.
(vi) ''Date of Cleaning'' should be written over the outer surface of tank by synthetic enamel paint with lettering not less than 100mm height.
(vii) All safety equipments required like safety helmets, Gumboots, safety belt, mask, safety googles and necessary insurance for safety of working labours to execute the work is responsibility of the contractor and rates quoted shall be deemed to be inclusive of the same. Semi UG Sump (Raw Water) of capacity 75000 gallons at Prothrapur filtration plant | 1 | Each Job | - | - |
| 1.01 | UG Sump (Fresh Water) of capacity 75000 gallons at Prothrapur filtration plant | 2 | Each Job | - | - |
| 1.02 | UG Sump (Fresh Water) of capacity 2 lakh gallons at Prothapur Filtration Plant | 1 | Each Job | - | - |
| 1.03 | Ground level clarifloculator sump of capacity 4.5 lakh gallons including flush mixing chamber, RCC water channel at Prothrapur filtration plant | 1 | Each Job | - | - |
| 1.04 | Suction Gallary of capacity 7000 Gallon at Prothrapur filtration plant | 2 | Each Job | - | - |
| 1.05 | Filter Bed of capacity 7000 Gallon at Prothrapur filtration plant | 2 | Each Job | - | - |
| 1.06 | Over Head Tank of capacity 10000 Gallon at Prothrapur PH and Type I Qtrs | 2 | Each Job | - | - |
| 1.07 | Semi UG sump of capacity 2.65 lakh litres at STP 750 KLD | 1 | Each Job | - | - |
| 1.08 | Over Head Tank of capacity 3 lakh litres at MAP OHT | 1 | Each Job | - | - |
| 1.09 | Over Head Tank of capacity 2.25 lakh litres MAP OHT | 1 | Each Job | - | - |
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
8814ATENDERDOCUMENTS.pdf
Tender Documents • 1.59 MB
BOQ_870961.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .