| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹60.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | Not Admitted-Finance 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | - | Not Admitted-Finance Others-NOT ADMITTED DUE TO OBJECTION RAISED BY JAI DURGE NAMAH CONS. BAGHPAT AND TENDER CONDITION NO 25. | |
| 3 | Not Admitted-Finance | - | Not Admitted-Finance Others-NOT ADMITTED DUE TO OBJECTION RAISED BY M/S SHIVA ENTERPRISES BAGHPAT AND TENDER CONDITION NO 25. |
| Sl No | Description | Qty | Unit | M/S TIYA CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|
| 1.00EARTH WORK | ||||
| 1.01 | Earth work in Excavation in Ordinary Soil with Poclain Machine and shifting of Excavated Soil with Tractor Trolly | 10,988.08 | Cum | 104 ₹11,42,760.32 Lowest |
| 1.02 | Earth work in Excavation in Ordinary Soil with Poclain Machine including disposal of excavated earth up to 2 km. distance | 1,274.25 | Cum | 104 ₹1,32,521.69 Lowest |
| 1.03 | Excavation in slush and lahel including disposal of excavated slush / lahel up to 2 km. distance | 25,155.95 | Cum | 156.5 ₹39,36,906.18 Lowest |
| 1.04 | Dressing of E/W on Bund (100%) | 3,613.36 | Cum | 6.45 ₹23,306.2 Lowest |
| 1.05 | Compaction of E/W on Bund (100%) | 3,613.36 | Cum | 7.17 ₹25,907.83 Lowest |
| 1.06CONSTRUCTION OF INLET | ||||
| 1.07 | Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge | 18.6 | CUM. | 90.19 ₹1,677.53 Lowest |
| 1.08 | Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work. | 9.27 | CUM. | 3,256.83 ₹30,190.81 Lowest |
| 1.09 | Brick work in masonary in 1:4 cement & course sand mortar | 19.56 | CUM. | 4,609.66 ₹90,164.95 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.1 L
Closing Date
30 Jun 2023, 5:00 pmClosed
EEMI MEERUT
EEMI MEERUT
RENOVATION OF POND IN VILLAGE BAGHU BLOCK BAGPAT DISTT BAGPAT
2023_UPMID_813774_1
187(E-14/23-24)
Open Tender
Civil Works
Item Rate
60 days
BAGPAT
RENOVATION OF POND IN VILLAGE BAGHU BLOCK BAGPAT DISTT BAGPAT
2 documents required · 2 mandatory
₹2,354
EEMI MEERUT
₹6.1 L
18 Jul 2023
20 Jun 2023
3 Jul 2023
20 Jun 2023
30 Jun 2023
20 Jun 2023
Amount
EARTH WORK
Earth work in Excavation in Ordinary Soil with Poclain Machine and shifting of Excavated Soil with Tractor Trolly
Earth work in Excavation in Ordinary Soil with Poclain Machine including disposal of excavated earth up to 2 km. distance
Excavation in slush and lahel including disposal of excavated slush / lahel up to 2 km. distance
Dressing of E/W on Bund (100%)
Compaction of E/W on Bund (100%)
CONSTRUCTION OF INLET
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
Brick work in masonary in 1:4 cement & course sand mortar
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
S/F 600 mm Dia hume pipe NP-3
CONSTRUCTION OF OUTLET
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
Brick work in masonary in 1:4 cement & course sand mortar
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
S/F 600 mm Dia hume pipe NP-3
CONSTRUCTION WORK OF RAMP
Excavation in foundation in ordinary soil ( loam, clay or sand) including lift upto 1.5 M and lead upto 30.00 M. and disposal of surplus earth as directed by engineer in charge
Providing and laying concrete in 8:4:1 (8 Brick blast : 4 fine sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
Brick work in masonary in 1:4 cement & course sand mortar
12 MM thick plaster 4:1 (4 coarse sand :1 cement) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
Providing and laying concrete in 4:2:1 (4 stone grit : 2 coarse sand : 1 cement ) icluding supply all meterials, labour, T&P etc. proper comletion of the work.
CONSTRUCTION OF DESILTING CHAMBER
EXCAVATION IN FOUNDATION IN ORDINARY SOIL I/C ALL COM.
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS.
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK.
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.
M.S OR IRAN WORK OF SMALL SIZE AND SECTION I/C PROPER COMPLETION OF THE WORK (TOP COVER / ZAL AND TWO SIDE ZALI WITH OPENING ARRANGEMENT FACILITY )
Painting roofs or othar iron work in large areas with one coat priming and one coat of approved (above one Sq.Metre) paint (British antesol or equivalent) including supply of all materials labour Tools & plants etc. required for proper completion of the work. Paint to be used ISI Marked. as per
CONSTRUCTION OF FLAG HOSISTING WORK
PROVIDING & LAYING CEMENT CONCRETE 1:4:8 WITH (1:CEMENT AND 4:FINE SAND AND 40 MM GAUGE BRICK BALLAST ) CURING COMPLETE INCLUDING COST OF FORM WORK IN FOUNDATION AND FLOORS
CLASS 150 BRICKS IN 1:4 CEMENT AND COARSE SAND MORTAR IN FOUNDATION AND PLINTH INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC.REQUIRED FOR COMPLETION OF THE WORK
12 mm THICK PLASTER WITH CEMENT AND FINE SAND OF 1.25 FINENESS MODULES IN 1:4 OVER BRICK WORK MINIMUM THICKNESS NOT TO BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS. LABOUR TOOLES AND PLANTS ETC. REQUIRED FOR PROPER COMPLETION OF THE WORK.
CEMENT CONCRETE WITH 4 CM GAUGE STONE GRIT IN C/SAND & CEMENT IN THE PROPORTION 1:2:4 INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND TOOLS AND PLANTS ETC, REQUIRED FOR PROPER COMPLETION OF THE WORKS.
SUPPLY AND FIXING OF IRON ROD 63 MM SIZE FOR FLAG HOISTING,PAINTING WORK OF FLAG HOISTING PLATFARM ETC. I/C ALL COMPLETE
S/f RCC HUME PIPE 350 MM DIA I/C ALL COMP
DEWATERING BEFORE AND DURING DIGGING
PHOTOGRAPHY AND VIDEO GRAPHY ( 03 STAGE ) BEFORE, DURING AND AFTER COMLETION OF WORK
S/F OF M.S IRON SIGN BOARD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .