Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC Being lowest | |
| 2 | L2₹8.0 L+₹12,073.40 (1.53%)Rejected-Finance AT DUNGAMAL NH 5 POST NB CHILKA VIA BALUGAON DIST KHURDA ORISSA 752037 | KHORDHA | ODISHA | 752037 | L2 | Rejected-Finance Being not lowest | |
| 3 | L4₹9.5 L+₹1.6 L (20.6%)Rejected-Finance | L4 | Rejected-Finance Being not lowest | |
| 4 | L5₹8.5 L+₹59,623.30 (7.57%)Rejected-Finance AT BRAJARAJPUR PO INS CHILKA DISTT KHURDHA ODISHA 752037 | KHORDHA | ODISHA | 752037 | L5 | Rejected-Finance Being not lowest | |
| 5 | L5₹11.1 L+₹3.2 L (40.4%)Rejected-Finance AT AMRITPUR PO NB CHILKA DIST KHURDA ODISHA 752037 | KHORDHA | ODISHA | 752037 | L5 | Rejected-Finance Being not lowest |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
13 Jan 2021, 6:00 pmClosed
Garrison Engineer Chilka
GE CHILKA, INS CHILKA, KHURDA, ODISHA 752 037
PROVIDING SERVICES FOR MANNING AND OPERATION OF 320 KVA DG SET AT TRAINING AREA AND BOILER OPERATOR FOR MECHANICAL LAUNDRY AT TRAINING AREA AT INS CHILKA UNDER GE CHILKA
2020_MES_392223_2
GE/CHL/8678 OF 2020-2021
Open Tender
Civil Works
Item Rate
335 days
Garrison Engineer Chilka
MES Enlisted contract Class E
Category d v
6 documents required · 6 mandatory
₹500
Yes
Garrison Engineer Chilka
₹22,000
Yes
29 Jan 2021
30 Dec 2020
15 Jan 2021
30 Dec 2020
13 Jan 2021
1 Jan 2021
30 Dec 2020 - 31 Dec 2020
Amount
Manning, Operation of 02 No DG Sets 320 KVA at Training Area in three shifts each day (every shift of 08 hours) including sundays & holidays by deploying one DG set operator mate FGM (semi skilled). Duties of operator includes filling up the fuel tank, cleaning of filters and complete DG Set, minor adjustment to the engine topping up electrolyte and distilled water for maintaining the batteries for engine starting, topping up of coolant in radiator as per manufacturers instructions and maintaining daily log sheets for engine, control panels and power control centre located in DG set room, complete all as specified and directed in following shift :- 1st Shift : 0600 Hours to 1400 Hours 2nd Shift : 1400 Hours to 2200 Hours 3rd Shift : 2200 Hours to 0600Hours Note :- (i) Diesel shall be traansported from MT yard of AGE E/M Chilka on required basis. The rate quoted is deemed to be inclusive of for collection of FOL from store yard of AGE E/M Chilka and maintaing proper consumption record on daily basis as directed by Engineer-in-charge on prescribed formet.
Manning and Operation of Boiler in station Laundry and connected panel and pumps at Trainning Area complete in one shift of 08 hours including sundays and holidays by deploying boiler operator (skilled) for steam boiler including maintenance of necessary records and documents complete all as specified and as directed in following shift :-. (a) Shift timing : 0900 hrs to 1700hrs Note for item srl 1 and 2 :- (i) Basic mobile phone, emergency light, tools and plant shall be provided by contractor for smooth functioning of installations. (ii) Minimum wages shall be as per notification issued by the Chief Labour Commissioner (Central), Ministry of Labour and Employment, Government of India. Any increase in wages rates during the period of contract shall be paid by the contractor at his own cost. (iii) The quoted rate shall include EPF, ESI, LWC, GST etc as applicable as per current rates / rules. Rate quoted shall be deemed to be inclusive of any future enhancement and shall be born by the contractor at his own cost. The contractors shall submit copy of receipts of EPF, ESI as applicable etc in respect of his employees alongwith RAR/FB while claiming payment. (iv) Contractor shall made payment to his employees through Aadhar link bank account and copy of receipt of such payment shall be submitted to Engineer-in-Charge for their verification.
(v) Contractor shall provide log sheet attendance register and other stationery items required for smooth functioning of installation. The rate quoted is inclusive of cost of such items. (vi) Rate quoted by the contractor is inclusive of cost of uniform to his employees for wearing during working hours. Pattern of uniform shall be approved by Engineer-in-Charge/GE. (vii) Contractor shall monitor his staff regularly and shall watch and guard installation during contract period. Any loss / damage due to negligence to the Govt property / installation / equipments/ plants shall be made good by the contractor at his own cost. (viii) General cleanliness and upkeeping of existing plants shall deemed to be included in unit rate quoted. (ix) In case of non submission of copy of receipt of EPF, ESI etc as applicable, the RAR/Final bill payment with not be entertained by the department for which responsibility shall be rest with the contractor.
HARI HARA NAYAK
ANTARYAMI PANDA AND COMPANY
A P ENTERPRISES
PABITRA MOHAN PARIDA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .