| 1 | Accepted-Technical | Accepted-Technical Accepted as per attached sheet |
| 2 | Accepted-Technical NA | Accepted-Technical Accepted as per attached sheet |
Tender Value
₹4.8 Cr
EMD Value
₹9.7 L
Closing Date
18 Aug 2026, 11:00 amClosed
Amit Kumar
Division - Road Maintenance and Urban Amenities
Special Repair of the Master Road from Ghata red light to Faridabad T-point Gurugram, including all other works contingent thereto
2026_HRY_538583_1
2026A88B1B67 85A1 4140 97FC DE4970968ED9720001
Open Tender
Civil Works
Works
240 days
Gurugram
Special Repair of the Master Road from Ghata red light to Faridabad T-point Gurugram, including all other works contingent thereto
2 documents required · 2 mandatory
₹1,180
₹9.7 L
Yes
26 Sept 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
18 Aug 2026
4 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Recovery- Credit of Kerb Stone (70 % of the total length) (The amount computed by rates qouted against recovery items will not be
included in the total amount rather it will be deducted while calculating financial statement of the agency. kerb stones obtained from
dismantling of esiting median, islands has been calculated taking assumption that 70% of existing kerb stones will be retrieved and can ne
reused. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be
considered for all purpose in case the agency qoutes lesser than reserve price. The price qouted against the recovery of existing kerb stones
shall have minimum reserve price of Rs. 2226/- per cum.) | 168.68 | Cum | 1 | ₹168.68 |
| 2 | Recovery Item- Credit of unusable material received from Milling of BC i.e. 70% of obtained material. The Quantites of the above material have been worked out on the basis of theoretical quantities laid on this road. However agency may visit before quoting rates and asses the extent of retrieved material. There shall be no measurement after actual scarifying / milling and if material after milling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of qouted rate and quantity exhibited in the BOQ shall be made. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be considered for all purpose in case the agency qoutes lesser than reserve price. The price qouted against the recovery material shall have minimum reserve price of 1533.51/- per cum). | 250 | Cum | 2 | ₹500 |
| 3 | Providing services of qualified surveyor(s) along with all required instruments, tools, accessories and manpower for carrying out survey, establishing and recording levels and topographical details for planning and execution of works including (but not limited to) determination of finished road levels (FRL), drainage invert levels, cross-drainage/road crossing levels, longitudinal and cross-sections, benchmarks/temporary benchmarks, setting out, and any other survey works as directed by the Engineer-in-Charge. The survey team with complete equipment shall remain available at the disposal of GMDA for a period of 03 (three) months for planning/field requirements, and the entire work shall be carried out to the entire satisfaction of the Engineer-in-Charge, complete in all respects.
Payment shall be released only after submission of detailed survey findings/records to the department, duly signed by the Contractor or his authorised representative and jointly verified/signed by the concerned SDE/JE of the department, complete in all respects and as approved by the Engineer-in-Charge. | 1 | Nos | 2 | ₹2 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
BOQ_617790.xls
BOQ • 0.36 MB
AD0173312.pdf
Additional Documents • 0.28 MB
666CorrigendumDateextend.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .