| 1 | L1₹7.9 LAccepted-AOC | ₹7.9 L | L1 | Accepted-AOC Qualified in AOC |
| 2 | L2₹7.9 L+₹6,839.74 (0.87%)Rejected-AOC | ₹7.9 L+₹6,839.74 (0.87%) | L2 | Rejected-AOC Qualified in AOC |
| Sl No | Description | Qty | Unit | K.GNANASEKAR L2 | GP Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2`0B | 12.44 | CUM | 250 ₹3,110 | 246.52 ₹3,066.71 Lowest |
| 2.00 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete. | 7.3 | CUM | 5,045.78 ₹36,834.19 Lowest | 5,045.78 ₹36,834.19 Lowest |
| 3.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete | 3.51 | CUM | 8,828.43 ₹30,987.79 Lowest | 8,828.43 ₹30,987.79 Lowest |
| 4.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete | 11.84 | CUM | 8,960.27 ₹1,06,089.6 Lowest | 8,960.27 ₹1,06,089.6 Lowest |
| 5.00 | Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | 3.84 | CUM | 5,937.61 ₹22,800.42 Lowest | 5,937.61 ₹22,800.42 Lowest |
| 6.00 | Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | 10.04 | CUM | 6,024.4 ₹60,484.98 Lowest | 6,024.4 ₹60,484.98 Lowest |
| 7.00 | Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | 21.44 | SQM | 525 ₹11,256 | 516.5 ₹11,073.76 Lowest |
| 8.00 | Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | 68.43 | SQM | 1,100 ₹75,273 | 1,033 ₹70,688.19 Lowest |
| 9.00 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification. | 1 | MT | 90,000 ₹90,000 | 89,883.5 ₹89,883.5 Lowest |
| 10.00 | Weathering course using brick jellyand lime including cost and convenyance all materials to site etc complete. | 3.91 | CUM | 3,939.03 ₹15,401.61 Lowest | 3,939.03 ₹15,401.61 Lowest |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
3 Mar 2026, 3:00 pmClosed
The Block Development Officer BP
Panchayat union office Building Lathur at Pavunju
Construction of Kalaiyaranagam in Chinna colony at Nedumaram Panchayat in Lathur Panchayat Union in Chengalpattu district SCHEME.MLACDS.Estimate.8.00 Lakhs
2026_RDTN_666183_1
Tender Notice No .0189/2026/A3 dt.14.02.2026
Open Tender
Civil Works
Item Rate
Construction of Kalaiyaranagam in Chinna colony at
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,000
Yes
23 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
3 Mar 2026
25 Feb 2026
Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2`0B
Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete.
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete
Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete
Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete.
Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete.
Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete
Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete
Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification.
Weathering course using brick jellyand lime including cost and convenyance all materials to site etc complete.
Finishing the top of the roof with one course of Machine Pressed Tiles of size 20 cm x 2 cm of approved quality laid in CEMENT MORTAR 1:3(One cement and three sand) 12 mm thick mixed with water proofing compound conforming to ISS by 2% weight of cement us
Providing Granolithic flooring including cost and convenyance all materials to site etc complete.
Finishing the exposed surface of RCC item of work CM 1 :3, 10mm thick. including cost and convenyance all materials to site etc
Plastering with CM 1:5,mix using 12mm thick including cost and convenyance all materials to site etc complete
Colour washing two coats with Exterior emulsion of first class quality paint and of approved colour including cost and convenyance all materials to site etc complete
Painting two coats over new iron works using ready mixed enamel paint including cost and convenaynce all materials to site etc complete.
Cost and supply of Steel door of Size.
Cost and supply of Steel window of Size.
Fan Point
Light Point
Ceiling fan
Plug Point
LED Tube light
TNED Meter Board
Service Wire
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Technical.pdf
Tender Documents • 0.95 MB
BOQ_800205.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .