Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC | ₹2.1 Cr | L1 | Accepted-AOC Due to lowest bid price |
| 2 | L2₹2.3 Cr+₹15.9 L (7.44%)Rejected-Finance OPP SHIVA STUDIO PATIALA GATE SANGRUR | ₹2.3 Cr+₹15.9 L (7.44%) | L2 | Rejected-Finance Due to high bid price |
Tender Value
₹2.6 Cr
EMD Value
₹5.2 L
Closing Date
4 Jul 2025, 12:00 pmClosed
Executive Engineer
Provincial Division PWD BandR DAC Complex Sangrur
Construction of Family Court at Judicial Court complex, Sunam Distt. Sangrur
2025_CEPW_142480_1
Bid No 21 Dt.12-06-2025
Open Tender
Civil Works - Buildings
Percentage
180 days
Sangrur
Please refer Tender documents.
7 documents required · 7 mandatory
₹20,000
₹5.2 L
20 Jan 2026
13 Jun 2025
4 Jul 2025
13 Jun 2025
4 Jul 2025
13 Jun 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundations, trenches etc. in all kinds of soil where pick jumper work is not involved and not exceeding 2.0 metres depth including dressing of bottom and sides of trenches, stacking the excavated soil clear from the edge of excavation and subsequent filling around masonry in 15 cm. layers with compaction including disposal of all surplus soil as directed within a lead of 30 metres. | 772.49 | Cum | 191.74 | ₹1,48,117.23 |
| 2 | Cement concrete 1:4:8 with 40 mm gauge stone ballast. using concrete mixing volumetric type | 57.19 | Cum | 4,637.74 | ₹2,65,232.35 |
| 3 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 248.18 | Cum | 6,418.96 | ₹15,93,057.49 |
| 4 | Shuttering for faces of concrete foundations and foundation beam & plinth beam (vertical or battering) | 417.88 | Sqm | 221.24 | ₹92,451.77 |
| 5 | First class burnt brick work laid in cement sand mortar 1:6 in foundation and plinth. | 71.7 | Cum | 5,835.29 | ₹4,18,390.29 |
| 6 | Reinforced cement concrete M-25 mechanicaly batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in supersturcture. | 287.03 | Cum | 7,209.09 | ₹20,69,225.1 |
| 7 | Extra rate for First Floors | 139.32 | Cum | 190.68 | ₹26,565.54 |
| 8 | Extra rate for Second Floors | 9.31 | Cum | 381.37 | ₹3,550.55 |
| 9 | Centring and shuttering for Columns ( Square or Rectangular or plygonal in plain) in superstructure | 406.88 | Sqm | 502.52 | ₹2,04,465.34 |
| 10 | Extra rate for First Floors | 98.25 | Sqm | 10.54 | ₹1,035.55 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 21.27 MB
BOQ.xls
BOQ • 0.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .