Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹1.8 L+₹22,467.01 (14.4%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹1.9 L+₹35,715.03 (22.9%)Rejected-AOC | L3 | Rejected-AOC Rejected | |
| 4 | L4₹2.2 L+₹59,365.25 (38.1%)Rejected-AOC | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | S.GOWRISANKAR CIVILWORK CONTRACTOR L4 | DMBUILDERS L1 | V.UDAYAKUMAR L3 | S.Parandaman L2 |
|---|---|---|---|---|---|---|---|
| 1.00VELLORE DISTRICT Construction of New Drainage at Karthikeyapuram, Paravakkal Road From Madhavan House to Sambandam House in Cheruvangi Panchayat of Gudiyatham Block. Package No. 4 | |||||||
| 2.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 28 | Cu.M | 193.8 ₹5,426.4 | 250 ₹7,000 | 500 ₹14,000 | 160.55 ₹4,495.4 Lowest |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 4 | Cu.M | 5,457 ₹21,828 | 4,500 ₹18,000 Lowest | 6,000 ₹24,000 | 4,520.75 ₹18,083 |
| 4.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 96 | Sq.M | 566.1 ₹54,345.6 | 325 ₹31,200 Lowest | 500 ₹48,000 | 468.98 ₹45,022.08 |
| 5.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 4.16 | Sq.M | 1,116.9 ₹4,646.3 | 350 ₹1,456 Lowest | 500 ₹2,080 | 925.28 ₹3,849.16 |
| 6.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 11.04 | Cu.M | 6,772.8 ₹74,771.71 | 5,500 ₹60,720 | 5,000 ₹55,200 Lowest | 5,610.8 ₹61,943.23 |
| 7.00 | Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete., | 0.04 | MTs. | 93,738 ₹3,749.52 | 85,000 ₹3,400 | 88,000 ₹3,520 | 77,655.5 ₹3,106.22 Lowest |
| 8.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.75 | Cu.M | 9,180 ₹6,885 | 7,500 ₹5,625 | 6,000 ₹4,500 Lowest | 7,605 ₹5,703.75 |
| 9.00 | Plastering with cement mortar 1:5, 20mm thick including cost and conveyance and all labour charges etc. | 18 | Sq.M | 561 ₹10,098 | 225 ₹4,050 Lowest | 551 ₹9,918 | 464.75 ₹8,365.5 |
| 10.00 | Letering and Painting Name board | 1 | No. | 510 ₹510 | 500 ₹500 | 1,000 ₹1,000 | 422.5 ₹422.5 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,280
Closing Date
13 Oct 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BLOCK DEVELOPEMETN OFFICER (BP)
PANCHAYAT UNION OFFICE, GUDIYATHAM BLOCK
Construction of New Drainage at Karthikeyapuram, Paravakkal Road From Madhavan House to Sambandam House in Cheruvangi Panchayat of Gudiyatham Block.
2026_RDTN_709267_1
A3 / 2582 / 2026
Open Tender
Civil Works
Item Rate
GUDIYATHAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹4,280
Yes
11 Nov 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
13 Oct 2026
30 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | VELLORE DISTRICT Construction of New Drainage at Karthikeyapuram, Paravakkal Road From Madhavan House to Sambandam House in Cheruvangi Panchayat of Gudiyatham Block. Package No. 4 | - | - | - | - |
| 2 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 28 | Cu.M | - | - |
| 3 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 4 | Cu.M | - | - |
| 4 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 96 | Sq.M | - | - |
| 5 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 4.16 | Sq.M | - | - |
| 6 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete | 11.04 | Cu.M | - | - |
| 7 | Supplying and fabrication of Steel to site and all labour charges for straightening, cutting to length, including all Cost and conveyance of labour charges etc.,Complete., | 0.04 | MTs. | - | - |
| 8 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.75 | Cu.M | - | - |
| 9 | Plastering with cement mortar 1:5, 20mm thick including cost and conveyance and all labour charges etc. | 18 | Sq.M | - | - |
| 10 | Letering and Painting Name board | 1 | No. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_852307.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.81 MB
BOQ_852307.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .