Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.2 LAccepted-AOC | L-1 | Accepted-AOC ok | |
| 2 | L-2₹4.3 L+₹1.1 L (35.4%)Rejected-AOC | L-2 | Rejected-AOC ok |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
22 Aug 2022, 12:00 pmClosed
Executive Engineer, W.S. Mech. Division, Rewari
Executive Engineer, W.S. Mech. Division, Rewari
Repair of 1 No. 150 Cs Pump P9 Wilo make at Pump House JF-2 MahenderGarh Side
2022_HRY_234231_2
2434/6-A dated 12.08.2022
Open Tender
Pumps/Motors
Works
30 days
Executive Engineer, W.S. Mech. Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
₹6,000
Yes
30 Jan 2023
12 Aug 2022
22 Aug 2022
12 Aug 2022
22 Aug 2022
12 Aug 2022
Amount
Supply and fixing of New SS Sleeve of 150 Cs Pump after removal of old sleeve from existing shaft.
Providing and fixing of new rubber bushes of 150 Cs Pump (as per shaft).
Repairing of propeller by re-metalling, machining and bolting along with balancing of 150 Cs Pump Propeller.
Repairing of the diffuser by re-fixing its central hub by bolting, welding and press fitting.
Terms & Conditions:- 1. The tender rate will be inclusive all taxes as applicable including GST. 2. The tender rate will be for F.O.R. destination and inclusive of all incidental charges, enroute & at destination. Nothing extra shall be paid separately. 3. WWC@1% will be deducted from the each bill of the agency. 4. The rate should be inclusive carriage, fitting and allied parts complete in all respect with left over items (if any) as per site requirement. 5. Goods which to be used / supplied should be as per sample and conforming to the site condition & also conforming to I.S. Specification. 6. Department will not be responsible for non submission of BOQ / Bid Document online by due date, due to any fault of internet/ E-tendering. 7. Completion period – completion period is 1 Months. 8. Warranty must be 18 Months or 2500 Operation hours, whichever is earlier from the date of acceptance. 9. Payment schedule, as per bidding documents. 10. Each page of bid book will be signed by the tenderer as a token of acceptance of terms and conditions. 11. Bidders may visit to the sites before quoting the tender rates. 12. The bidders must create their contractor ID on HEW Portal (https://works.haryana.gov.in/ ) and accordingly upload the contractor profile summary in bidding documents, failing which the bid will be rejected. 13. Old scrap will be property of the department, if any. 14. Firms enlisted by the Department for Repair / Rehabilitation of pump can only participate.
GKS ENGINEERS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .