Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹12,100
Closing Date
18 Feb 2023, 11:15 amClosed
EE ENM M3
DELHI JAL BOARD MU BLOCK PITAMPURA
Improvement of power factor Standard make APFC panel at D 10 Sec 07 Rohini H18 Sec 07 Rohini BPSC 08 Sec 08 Rohini BPS in AC 13
2023_DJB_236325_7
NIT NO. 28(M-3)
Open Tender
Miscellaneous Works
Item Rate
30 days
EE ENM M3
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹12,100
Yes
14 Mar 2023
9 Feb 2023
18 Feb 2023
9 Feb 2023
18 Feb 2023
9 Feb 2023
D-10 Sec-07 Rohini , H-18 Sec-07 Rohini BPS & C-08 Sec-08 Rohini BPS in AC-13 Supply of 25 kVAr, 440V, 3 ph., 50 Hz, APFC panel suitable for power factor improvement of inductive load make standard
Transportation of the panel at site and installation of the same on the ground with necessary hardware and civil work etc as required at site
Supply of 50 mm sq. 1.1 kV grade, 3.5 core aluminum armored cable make Paragon, Havells, KEI or any other ISI marked
Laying of 50 mm sq. cable on the ground using necessary hardware clamps etc. as required at site
Termination of 50 mm sq. aluminum armored cable using brass compression glands, lugs , tapes etc. as required at site
Supply and installation of 200/5 A Control CT after dismantling of main bus bars, fixing of CT in the bus bar with necessary hardware and re-fixing of bus bars as required at site- make AE/Kappa/Eqv.
Supply, laying and termination of 2 core, 2.5 mm sq. copper control cable from Control CT to capacitor panel on ground/wall etc. as required at site
Supply, laying and fixing of double run 25x3 mm GI strip for earthing of panel from main earthing to capacitor panel using necessary hardware etc. as required at site
Testing &Commissioning of APFC panel including: 1. Megger testing of complete equipment from phase to phase, phase to neutral and phase to earth. 2. Programming of APFC relay for target power factor. 3. Checking tightness of all nuts and bolts. 4. monitoring of power factor during guarantee period.
STANDARD CAPACITORS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .