| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹64.0 LAdmitted-Finance | -10.00% | ₹64.0 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical | - | - | - | Rejected-Technical Not Eligible |
Tender Value
₹71.2 L
EMD Value
₹1.4 L
Closing Date
7 Sept 2026, 6:00 pmClosed
Executive Engineer-II
Office of Executive Engineer,WD.II(R),PWD,Panaji.
Construction of retaining wall for length of 0.046 K.Ms and laying of paving tiles for length of 0.059 K.Ms at Siddhakala Temple under MLA-LAD scheme in Taleigao constitency of Tiswadi Taluka.
2026_PWD_31498_1
PWD/DIV II/R/F-1/ASW/2026-27/16/Line5
Open Tender
Civil Works - Roads
Percentage
180 days
Office of Executive Engineer, WD.II(R), PWD, Panaji.
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.4 L
8 Sept 2026
1 Sept 2026
8 Sept 2026
2 Sept 2026
7 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation of structures of culverts,abntments piers, retaining walls etc. as per drawing and technical specification, including setting out construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom, back filling the excavation earth to the extent required and utilising the remaning earth locally for road work upto 3.00 m depth as per MORTH Specification 304: EXCLUDING DEWATERING; Ordinary Rock (not requiring blasting); Manual Means | 264.04 | cu.m | 582 | ₹1,53,671.28 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 36.8 | cu.m | 2,211 | ₹81,364.8 |
| 3 | Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: (a) All works upto plinth level | 19.32 | cu.m | 6,192 | ₹1,19,629.44 |
| 4 | Providing and laying in position ready mixed concrete (RMC) with usage of Ordinary Portland Cement manufactured in fully automatic batching plant and transported to site of work in transit mixer for a lead upto 10kms having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C., from the transit mixer to the site of laying, excluding the cost of centering, shuttering, finishing and reinforcement including the cost of admixtures in recommended porportions as per IS : 9103 to accelerate/retard setting of concrete, improve workability without imparing strength and durability as per the directions of the engineer-in-charge. All works upto floor V level;
iv) M-25 grade of concrete | 236.44 | cu.m | 8,440 | ₹19,95,553.6 |
| 5 | Providing TMT steel reinforcement bars of (SAIL, TATA. VIZAG, JSW Steel Ltd.) ) (Confirming to IS 1786 of 1986) for RCC work (conforming to I.S. 1786 of 1986) including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member. | 29,791.44 | kg | 105 | ₹31,28,101.2 |
| 6 | Centering & shuttering including Strutting, Propping & removal of forms for : i) Foundations, Footings, Bases for columns | 124.68 | sq.m | 407 | ₹50,744.76 |
| 7 | Centering & shuttering including Strutting, Propping & removal of forms for : (ii) Vertical surfaces such as retaing walls, return walls, Partitions, walls (any thickness) including attached Pilasters, Buttresses, Plinth and string courses, Fillets and the like | 603.2 | sq.m | 479 | ₹2,88,932.8 |
| 8 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. | 179.4 | cu.m | 1,955 | ₹3,50,727 |
| 9 | Providing and fixing weepholes with rigid PVC make laid in position with a required slop and level while layingpipes of approved the concrete of retaining wallwing wall and earth retaining structure comlete as directed by the Engineer in charge ; A) 110 mm dia | 62 | RM | 363 | ₹22,506 |
| 10 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 358.8 | cu.m | 245 | ₹87,906 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
Tendernotice_2.pdf
PDF • 1.95 MB
BOQ_31882.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .