Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.6 LAccepted-AOC | ₹2.6 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹2.6 LRejected-AOC | ₹2.6 L | 2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | RAVI K L1 | Prabhaharan L2 |
|---|---|---|---|---|---|
| 1.00Part I - Repairs to ceiling at Thirumanur PUE School (Two class Room ) in Thirumanur Panchayat | |||||
| 2.00 | Clean removal of cement plaster from walls including all labour charges etc. complete | 109.17 | Sq.m | 9 ₹982.53 | 9.12 ₹995.63 |
| 3.00 | Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work. | 109.17 | Sq.m | 308.5 ₹33,678.95 | 309 ₹33,733.53 |
| 4.00Repairs to ceiling at Thiruvenganur PUM School (Two class Room ) in Vadugapalayam Panchayat | |||||
| 5.00 | Clean removal of cement plaster from walls including all labour charges etc. complete | 109.17 | Sq.m | 9 ₹982.53 | 9.12 ₹995.63 |
| 6.00 | Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work. | 109.17 | Sq.m | 308.5 ₹33,678.95 | 309 ₹33,733.53 |
| 7.00Repairs to ceiling at Varanavasi PUE School (Two class Room ) in Varanavasi Panchayat | |||||
| 8.00 | Clean removal of cement plaster from walls including all labour charges etc. complete | 109.17 | Sq.m | 9 ₹982.53 | 9.12 ₹995.63 |
| 9.00 | Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work. | 109.17 | Sq.m | 308.5 ₹33,678.95 | 309 ₹33,733.53 |
| 10.00Repairs to ceiling at Kallur PUM School (Two class Room ) in Vettriyur Panchayat | |||||
Tender Value
₹2.7 L
EMD Value
₹2,700
Closing Date
27 Nov 2025, 3:00 pmClosed
Block Development Officer(B.Pt), Thirumanur
Block Development Office, Thirumanur,Ariyalur District
Package III Repair work of Ceiling Thirumanur PUES (2 class),Thiruvenganur PUMS (2 class ) Vadugapalyam,Varanavasi PUES (2 class ),Kallur PUMS (2 class Room ),Kallur PUMS (3 class Ea.face ),Keelapalur PUES (2 class Nor.face) in Keelapalur Pt
2025_RDTN_625122_1
Rc.No.3019/2025/A2 dated 20.11.2025
Open Tender
Civil Works - Buildings
Block Development Office, Thirumanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,700
Yes
25 Feb 2026
20 Nov 2025
27 Nov 2025
20 Nov 2025
27 Nov 2025
20 Nov 2025
Amount
Part I - Repairs to ceiling at Thirumanur PUE School (Two class Room ) in Thirumanur Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Thiruvenganur PUM School (Two class Room ) in Vadugapalayam Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Varanavasi PUE School (Two class Room ) in Varanavasi Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Kallur PUM School (Two class Room ) in Vettriyur Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Kallur PUM School (Three class Room – East face ) in Vettriyur Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
Repairs to ceiling at Keelapalur PUE School (Two class Room – North face ) in Keelapalur Panchayat
Clean removal of cement plaster from walls including all labour charges etc. complete
Supplying and applying of two coats of putty of 3 mm thick over the exposed RCC Surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. ( The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade. labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth. etc., complete). The putty should be got approved by the Executive Engineer before use on work.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Prabhaharan (BID ID -1521076)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.76 MB
BOQ_747506.xls
BOQ • 0.32 MB
TB.pdf
Tender Documents • 0.89 MB
PB.pdf
Tender Documents • 0.56 MB
Download all tender documents and submit your bid