Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.4 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹18.5 L+₹16,217.50 (0.88%)Rejected-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | L2 | Rejected-AOC Reject | |
| 3 | L3₹18.9 L+₹51,702.50 (2.81%)Rejected-AOC | L3 | Rejected-AOC Reject |
Tender Value
₹21.9 L
EMD Value
₹21,900
Closing Date
4 Oct 2023, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Big bazaar street, Town hall, Coimbatore-1
Improvement works to the Division Office, Water Supply Office Collection Centre at Sungam, Central Zone
2023_MAWS_373527_5
E62-2023
Open Tender
Civil Works
Works
120 days
Coimbatore corporation-
As per the tender condition attached
3 documents required · 3 mandatory
₹0
₹21,900
24 Jan 2024
26 Sept 2023
4 Oct 2023
26 Sept 2023
4 Oct 2023
26 Sept 2023
Amount
1.Dismantling the Damaged Pressed Tiles & Weathering Course etc complete as per the direction of the departmental officer
2.Scraping the existing plastered surface etc complete as per the direction of the departmental officer
5.Grouting the RCC Roof Slab surface using cement slurry with fosroc chemical inclduing making drill points and applying cement & chemicals micing slurry at a required pressure etc complete as per the direction of the departmental officer
6.Providing Water Proofing on the roof top surface inclduing cleaning the surface throughly preparing the surface and filling the cracks with PU sealant and applying finishing coat of 3 coats of elasto coat with fibremesh as directed etc complete as per the direction of the departmental officer
7.Supply & Fixing of 12x12mm Window Grills etc., complete as per the direction of the departmental officers.
9.Wrought & putup with 100mm x 75mm wooden Door Frames etc complete as per the direction of the departmental officer
10.Supply & Fixingof PVC Door with Frames etc complete as per the direction of the departmental officer
11.Supply & Fixing of mild steel Grill stand for Syntex and Gate etc complete as per the direction of the departmental officer
14.Supply & Fixing of Water Dispenser having hot, cold & Normal water etc complete as per the direction of the departmental officer
15.Supply & Fixing of 25 Watts LED Tube Light etc complete as per the direction of the departmental officer
16.Supply & Fixing of 1 HP Monoblock Motor etc complete as per the direction of the departmental officer
17. Supply & Fixing of UPVC Window 3 Track Sliding and on track with mosquito net etc complete as per the direction of the departmental officer
18.Supply & Fixing of 28 Watts Power saving ceiling fan with remote etc complete as per the direction of the departmental officer
20.Supply & Fixing of 450mm Wall mounted Fan etc complete as per the direction of the departmental officer
21.Supply & Fixing of WT Bulk Head Fitting with Guard (Philips / Bajaj / Crompton) suiatble fr 11W CFL Lamp etc., complete
22.Supply & Laying with 2mm thick Vinyl Flooring etc., complete as per the direction of the departmental officers.
23. Applying 2 coats of Birla Wallcare Putty for ceiling and wall works etc., complete as per the direction of the departmental officers
24. Painting with first quality emulsion paint two coats over a priming coat including through cleaning, scrapping, removal of dust and including necessary plaster of paris putty works wherever required etc., completed. etc., complete as per the direction of the departmental officers
25. Painting with wooden paint 2 coats for old wood works etc. complete as per the directions of departmental officer.
26.Painting with enamel paint 2 coats for old iron works etc. complete as per the directions of departmental officer.
28.Supply & Fixing of Stainless Steel Sink etc. complete as per the directions of departmental officer.
29. Dismantling the damaged CC etc., complete as directed by the departmental officers.
30. Earth work excavation in all soils ,etc., complete as per the direction of the departmental offiers.
31. Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted,etc., complete as per the direction of the departmental offiers.
32.Brick work in cement mortar 1:5 mix (one cement five sand) using II class ground molded bricks chamber burnt bricks of size 9" X 4 1/2" X 3" for the following including curing etc., completed.
33. Plastering with cement mortar 1:3 mix to 20 mm thick for damaged R.C.C. exposed surfaces, such as sunshade, beam, roof ceiling etc complete as per the direction of the departmental officer.
35. Supply and erecting centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC slabs, Rectangular beems, Tee (or) ECC Beam, Lintel, Bed Block, Staircase waist and landing slabs landing beams, canopy etc., in all floor with all cross bracings using mild steel sheets of size 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25mm X 25 X 3mm for boarding laid over country wood joinsts of size 10cm X 6.50 cm spaced at about 90cm C/C and supports by Causrina props of 10cm to 13cm dia spaced at 75cm C/C etc., completed as directed. Sl.No.123
36. Reinforced Cement concrete 1:1.5 :3 (one cement, one and half M Sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
37. Supply & Fabrication of RTS Rod etc., complete as per the direction of the departmental officers
38. Conveyance of Surplus earth from work site to City outer with average lead of 15 km etc., complete as per the direction of the departmental officers
39.Supply & Fixing of Galvanished Manhole Cover etc., complete as per the direction of the departmental officers
40.Supply & Fixing of of Submerrsible Pump etc., complete as per the direction of the departmental officers
42. .Supplying and Roofing with Tensile like Designing, Fabrcaition, Erection, Painting, 900 GSM Ferrari Fabric Installation with fixing the Accessories etc., complete as per the direction o fthe departmental officers.
M RAMARAJ
B KANAGARAJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .