| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC DHEMOMAIN COLLIERY PO BARADHEMO DIST BURDWAN PIN 713367 | BARADHEMO | BURDWAN | WEST BENGAL | 713367 | ₹5.3 L | L1 | Accepted-AOC As per WO |
| 2 | L2₹5.8 L+₹48,544.08 (9.10%)Rejected-Finance | ₹5.8 L+₹48,544.08 (9.10%) | L2 | Rejected-Finance As per TCR |
| 3 | L3₹6.3 L+₹97,033.21 (18.2%)Rejected-Finance DHEMOMAIN COLLIERY PO BARADHEMO DIST BURDWAN WEST BENGAL 713367 | 713367 | ₹6.3 L+₹97,033.21 (18.2%) | L3 | Rejected-Finance As per TCR |
| 4 | L4₹6.6 L+₹1.3 L (23.7%)Rejected-Finance | ₹6.6 L+₹1.3 L (23.7%) | L4 | Rejected-Finance As per TCR |
| 5 | L5₹6.9 L+₹1.6 L (29.2%)Rejected-Finance | ₹6.9 L+₹1.6 L (29.2%) | L5 | Rejected-Finance As per TCR |
| Sl No | Description | Qty | Unit | SHATRUGHAN TRADERS L3 | B N TRADERS L2 | TAPAS KUMAR MUKHERJEE L4 | BIKRAM ENTERPRISE L1 | ARSH CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 7.52 | cum | 163.51 ₹1,229.58 | 150.93 ₹1,134.99 | 171 ₹1,285.92 | 138.35 ₹1,040.41 Lowest | 200 ₹1,504 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 fine sand : 8 graded stone aggregate 40 mm nominal size) | 2.41 | cum | 2,895 ₹6,976.96 | 2,672.31 ₹6,440.27 | 3,029 ₹7,299.89 | 2,449.62 ₹5,903.58 Lowest | 3,000 ₹7,230 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 7.37 | cum | 4,229 ₹31,167.71 | 3,903.69 ₹28,770.2 | 4,424 ₹32,604.88 | 3,578.38 ₹26,372.68 Lowest | 5,000 ₹36,850 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5.55 | cum | 5,267.6 ₹29,235.18 | 4,862.4 ₹26,986.32 | 5,511 ₹30,586.05 | 4,457.02 ₹24,736.46 Lowest | 6,500 ₹36,075 |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). | 2.92 | cum | 5,306.73 ₹15,495.65 | 4,898.52 ₹14,303.68 | 5,552 ₹16,211.84 | 4,490.31 ₹13,111.71 Lowest | 6,500 ₹18,980 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo-Mechanically Treated bars | 1,407.45 | kg | 51.12 ₹71,952.36 | 47.19 ₹66,417.57 | 54 ₹76,002.3 | 43.26 ₹60,882.77 Lowest | 70 ₹98,521.5 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 15.96 | sqm | 174.4 ₹2,783.34 | 160.98 ₹2,569.24 | 183 ₹2,920.68 | 147.56 ₹2,355.14 Lowest | 200 ₹3,192 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts | 74.98 | sqm | 471.38 ₹35,344.07 | 435.12 ₹32,625.3 | 493 ₹36,965.14 | 398.86 ₹29,906.52 Lowest | 600 ₹44,988 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 101.08 | sqm | 349.05 ₹35,281.97 | 322.2 ₹32,567.98 | 365 ₹36,894.2 | 295.35 ₹29,853.98 Lowest | 350 ₹35,378 |
Tender Value
₹9.7 L
Closing Date
7 Jun 2021, 3:00 pmClosed
AE (Civil)
Office of the General Manager Sodepur Area, P.O. Sundarchak, Dist.-Burdwan, West Bengal-713360
Construction of boundary wall along with two nos. main gate and a security room at Dhemomain Agent office under DMC Group, SDPA.
2021_ECL_207138_1
SDPA/Civil/G-11/21-22/13 Dt-19.05.2021
Open Tender
Civil Works - Buildings
Item Rate
30 days
Sodepur Area
Please refer Tender documents.
9 documents required · 9 mandatory
Exempted
14 Aug 2026
26 May 2021
8 Jun 2021
27 May 2021
7 Jun 2021
27 May 2021
27 May 2021 - 31 May 2021
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .