| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.7 LAccepted-Finance HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD PIN 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | ₹66.7 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹68.6 L+₹1.8 L (2.76%)Rejected-Finance 12 BHARTI AARTIST COLONY VIKAS MARG NEW DELHI 110092 | EAST | DELHI | 110092 | ₹68.6 L+₹1.8 L (2.76%) | L2 | Rejected-Finance Not being L1 |
| 3 | L3₹69.0 L+₹2.3 L (3.48%)Rejected-Finance HYDERPORA NEAR ELLAQUAI DEHATI BANK SRINAGAR KASHMIR J K 190014 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190014 | ₹69.0 L+₹2.3 L (3.48%) | L3 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | national engineering L1 | Vijaypower Generators Limited L2 | M/S ZAHOOR AHMAD KHAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n.exc. 1.5 meter wide and not exc 1.5 meter deep for foundations of poles/stays/cable etc not exc 10 Sqm area on plan and getting out in hard/dense soil complete all as specified and as directed by Engineer-in-Charge. | 100 | Cum | 200 ₹20,000 Lowest | 300 ₹30,000 | 250 ₹25,000 |
| 2.00 | Returning filling in including spreading levelling, watering and well ramming in layer each not exc. 25 cm thick in a hard/dense soil complete all as specified and directed by Engineer-in-Charge. | 60 | Cum | 60 ₹3,600 | 30 ₹1,800 Lowest | 200 ₹12,000 |
| 3.00 | Removing surplus soil to a distance not exc. 50 meter and depositing where directed at a level n.exc. 1.5 meter above the starting point complete all as specified and directed by Engineer-in-Charge. | 40 | Cum | 60 ₹2,400 | 30 ₹1,200 Lowest | 200 ₹8,000 |
| 4.00 | Tubes, 'light grade', galvanised, with all fitting; laid in trenches for protection of cables, including fittings 80 mm dia. | 25 | RM | 800 ₹20,000 | 1 ₹25 Lowest | 600 ₹15,000 |
| 5.00 | M&L for PCC cable cover Class LV, Type I, flat, size 250 mm x 150mm x 40mm laid Flat in trenches over the cable with length 250mm perpendicular to the direction of cable, Adjacent/ abutting each other complete all as specified and directed.
Note:-Excavation and earth work to be measured and paid for separately | 1,650 | Each | 40 ₹66,000 | 36 ₹59,400 Lowest | 40 ₹66,000 |
| 6.00 | M&L Sand cushioning to protection of underground cables, laid 8 Cm before laying and 15 Cm after laying of cable, and punned to form an overall layer of 18 Cm thick, complete all as specified and directed by Engineer-In-Charge.
Note: Punned thickness shall be measured. | 26 | Cum | 700 ₹18,200 | 690 ₹17,940 Lowest | 1,200 ₹31,200 |
| 7.00 | Supply, installation, tesing and commissioning of Diesel Engine Driven Genrating set of capacity 200KVA including but not limited to: Continuous net rating at 0.8 PF, 415V, 3 phase, 50Hz at NTP and should be able to operate at alttude of 3048m AMSL and ambient 50˚ C and extreme climate (-20˚ C) , CPCB-IV+ compliant norms (MoEF &CC Gazette Notification effective 01 July 2023), self contained , skid mounted type with radiator cooling, control panel, fuel system, acoustic enclosure and all standard accessories, Noise standard ≤ 75dB (A) at1m, but must be certified for CPCB-IV+ compliance by OEM and Type approval & conformity of production (COP) certificate and derating factor certificate from OEM mandatory and must comply with real time emission monitoring provisions complete all as specified and directed comprising the following | 2 | Each | 29,50,000 ₹59,00,000 Lowest | 30,18,000 ₹60,36,000 | 29,50,000 ₹59,00,000 Lowest |
| 7.01(a) Diesel Engine : The Diesel engine shall be of four stroke cycle multi cylinder, direct injection liquid cooled,turbo charged , air to air aftercooling and optimised turbo charger for increased altitude capablities, developing suitable BHP@1500RPM under tropical condition 3048meter at MSL of BS 5514/ISO3046 with an over load capacity 110% for one hour in any specified 12 hours of continuous operation. The engine shall confirm to IS: 10000/10002/ IS 13364/IS 1460/ IS 13656 /BS:649/ BS 5514 and CPCB -IV+ emission limits as per MoEF & CC Notification GSR 804(E) and subsequent amendments. The engine shall have following accessories :- (i) cooling fan and radiator (ii) Liquid cooling systems with pre mix anti-corrosive addetives. (iii) Turbocharger (iv) Flywheel with flywheel housing (v) Electrical engine starter motor (disengagement after start-up) with batteries (vi) Battery charging system (vii) Stainless steel exhaust flexible elbow (viii) Thermal sealing of exhaust pipe and aluminium cladding for complete exhaust pipe and silencer (ix) Required filters for fuel, lub oil, air etc (x) Sets of flexible houses as required (xi) Suitable rubber coupling to alternator with guard (xii) Suitable Engine controller for protection of the engine (xiii) Coolent heater, crankcase heater, DEF tank heater & all necessary accessories required for cold starting (xiv) Oil drain pump (xv) Heavy duty air cleaner etc. | ||||||
| 7.02(b) Engine Protection :- (i) High coolent temperature warning & trip (ii) Low lubricating oil pressure warning & trip (iii) Low coolent level waring and trip (iv) Fail to crack trip (v) Over crank trip (vi) High and low battery voltage alarm (vii) Clogged filter warning (viii) Lack of fuel (ix) High canopy temperature (x) set fail to start after sucessful three consecutive start attempts (xi) Electronic ECU with CPCB-IV+ diagnostic features for emmissions and engine health monitoring. | ||||||
| 7.03(c) Governer :- The Governer shall be of electronic type suitable for monitoring constant engine speed within the specified limits for parallel and auto load sharing operation shall comply with ISO 3046-IV governing class G2 /better. (d) Exhaust :- The exhaust piping system shall be supplied with a hosptial grade silencer and catalytic converter suitably optimised to meet stingent noise emission standards laid down by CPCB-IV+ emission compliant with built in catalytic coverter(DOC/DPF/SCR as per OEM design). The exhaust piping and the silencer shall be wrapped with rock wool and/or calcium silicate. The outside shall be neatly wrapped with aluminium cladding. The exhaust line shall be extended beyond the height of utility building roof as required by pollution control norms . Suitable supporting structure for installation shall be provided. Emission certificate from CPCB approved agency to be submitted at commissioning stage. (e) Hot air exhaust (Radiator cooling ):- As per OEM recommondation if sufficient exhaust for radiator is not available the contractor has to provide GI duct for hot air exhaust from DG set up to designed place of duct oulet. The duct shall be made of 14 gauge thick GI sheet including necessary civil work.Tropicalized radiator suitable for ambient up to 50˚ C, at altitude 100m;derating factor to be declared by OEM. | ||||||
Tender Value
₹70 L
EMD Value
₹80,000
Closing Date
4 Jul 2026, 6:00 pmClosed
HQ CWE AF Leh
HQ CWE AF Leh
SPL REPAIR AND REPALCEMENT AGAINST BER DG SET AT AF STN THOISE
2026_MES_768701_1
82151/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
THoise
As per NIT
9 documents required · 9 mandatory
₹1,000
GE AF THoise
₹80,000
Yes
10 Aug 2026
30 May 2026
6 Jul 2026
30 May 2026
4 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches n.exc. 1.5 meter wide and not exc 1.5 meter deep for foundations of poles/stays/cable etc not exc 10 Sqm area on plan and getting out in hard/dense soil complete all as specified and as directed by Engineer-in-Charge. | 100 | Cum | - | - |
| 2 | Returning filling in including spreading levelling, watering and well ramming in layer each not exc. 25 cm thick in a hard/dense soil complete all as specified and directed by Engineer-in-Charge. | 60 | Cum | - | - |
| 3 | Removing surplus soil to a distance not exc. 50 meter and depositing where directed at a level n.exc. 1.5 meter above the starting point complete all as specified and directed by Engineer-in-Charge. | 40 | Cum | - | - |
| 4 | Tubes, 'light grade', galvanised, with all fitting; laid in trenches for protection of cables, including fittings 80 mm dia. | 25 | RM | - | - |
| 5 | M&L for PCC cable cover Class LV, Type I, flat, size 250 mm x 150mm x 40mm laid Flat in trenches over the cable with length 250mm perpendicular to the direction of cable, Adjacent/ abutting each other complete all as specified and directed.
Note:-Excavation and earth work to be measured and paid for separately | 1,650 | Each | - | - |
| 6 | M&L Sand cushioning to protection of underground cables, laid 8 Cm before laying and 15 Cm after laying of cable, and punned to form an overall layer of 18 Cm thick, complete all as specified and directed by Engineer-In-Charge.
Note: Punned thickness shall be measured. | 26 | Cum | - | - |
| 7 | Supply, installation, tesing and commissioning of Diesel Engine Driven Genrating set of capacity 200KVA including but not limited to: Continuous net rating at 0.8 PF, 415V, 3 phase, 50Hz at NTP and should be able to operate at alttude of 3048m AMSL and ambient 50˚ C and extreme climate (-20˚ C) , CPCB-IV+ compliant norms (MoEF &CC Gazette Notification effective 01 July 2023), self contained , skid mounted type with radiator cooling, control panel, fuel system, acoustic enclosure and all standard accessories, Noise standard ≤ 75dB (A) at1m, but must be certified for CPCB-IV+ compliance by OEM and Type approval & conformity of production (COP) certificate and derating factor certificate from OEM mandatory and must comply with real time emission monitoring provisions complete all as specified and directed comprising the following | 2 | Each | - | - |
| 7.01 | (a) Diesel Engine : The Diesel engine shall be of four stroke cycle multi cylinder, direct injection liquid cooled,turbo charged , air to air aftercooling and optimised turbo charger for increased altitude capablities, developing suitable BHP@1500RPM under tropical condition 3048meter at MSL of BS 5514/ISO3046 with an over load capacity 110% for one hour in any specified 12 hours of continuous operation. The engine shall confirm to IS: 10000/10002/ IS 13364/IS 1460/ IS 13656 /BS:649/ BS 5514 and CPCB -IV+ emission limits as per MoEF & CC Notification GSR 804(E) and subsequent amendments. The engine shall have following accessories :-
(i) cooling fan and radiator
(ii) Liquid cooling systems with pre mix anti-corrosive addetives.
(iii) Turbocharger
(iv) Flywheel with flywheel housing
(v) Electrical engine starter motor (disengagement after start-up) with batteries
(vi) Battery charging system
(vii) Stainless steel exhaust flexible elbow
(viii) Thermal sealing of exhaust pipe and aluminium cladding for complete exhaust pipe and silencer
(ix) Required filters for fuel, lub oil, air etc
(x) Sets of flexible houses as required
(xi) Suitable rubber coupling to alternator with guard
(xii) Suitable Engine controller for protection of the engine
(xiii) Coolent heater, crankcase heater, DEF tank heater & all necessary accessories required for cold starting
(xiv) Oil drain pump
(xv) Heavy duty air cleaner etc. | - | - | - | - |
| 7.02 | (b) Engine Protection :- (i) High coolent temperature warning & trip
(ii) Low lubricating oil pressure warning & trip
(iii) Low coolent level waring and trip
(iv) Fail to crack trip
(v) Over crank trip
(vi) High and low battery voltage alarm
(vii) Clogged filter warning
(viii) Lack of fuel
(ix) High canopy temperature
(x) set fail to start after sucessful three consecutive start attempts
(xi) Electronic ECU with CPCB-IV+ diagnostic features for emmissions and engine health monitoring. | - | - | - | - |
| 7.03 | (c) Governer :- The Governer shall be of electronic type suitable for monitoring constant engine speed within the specified limits for parallel and auto load sharing operation shall comply with ISO 3046-IV governing class G2 /better.
(d) Exhaust :- The exhaust piping system shall be supplied with a hosptial grade silencer and catalytic converter suitably optimised to meet stingent noise emission standards laid down by CPCB-IV+ emission compliant with built in catalytic coverter(DOC/DPF/SCR as per OEM design). The exhaust piping and the silencer shall be wrapped with rock wool and/or calcium silicate. The outside shall be neatly wrapped with aluminium cladding. The exhaust line shall be extended beyond the height of utility building roof as required by pollution control norms . Suitable supporting structure for installation shall be provided. Emission certificate from CPCB approved agency to be submitted at commissioning stage.
(e) Hot air exhaust (Radiator cooling ):- As per OEM recommondation if sufficient exhaust for radiator is not available the contractor has to provide GI duct for hot air exhaust from DG set up to designed place of duct oulet. The duct shall be made of 14 gauge thick GI sheet including necessary civil work.Tropicalized radiator suitable for ambient up to 50˚ C, at altitude 100m;derating factor to be declared by OEM. | - | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.56 MB
BOQ_860845.xls
BOQ • 0.43 MB
tenderdocuments6.pdf
Tender Documents • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .