Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-Finance | L1 | Accepted-Finance BQR Conditions Satisfied | |
| 2 | L2₹8.5 L+₹5,070 (0.60%)Accepted-Finance | L2 | Accepted-Finance BQR Conditions Satisfied |
Tender Value
₹8.4 L
EMD Value
₹8,400
Closing Date
27 Jun 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer Operation,TTPS
Office of the SE/Operation/TTPS
TTPS Operation Circle MPM II Unit-IV Replacement of pulverized coal pipes, bends and fittings between boiler inlet elbow and sleeve coupling at 10.5mtr to 32 mtr level of boiler area during 2020 annual overhaul
2020_EB_168267_1
SE/O/TTPS/Spec.No.104/20-21
Open Tender
Miscellaneous Works
Item Rate
20 days
TTPS
As per BQR Conditions said in NIT
5 documents required · 5 mandatory
₹0
₹8,400
30 Jun 2020
12 Jun 2020
29 Jun 2020
12 Jun 2020
27 Jun 2020
12 Jun 2020
90 days
Charges for dismantling 4Nos fuel inlet elbows/bends after suitably supporting the adjacent coal pipes wherever required, removing, lowering them to ground floor from various heights (18mt. to 32mt.) and placing them in Unit IV as directed by the Engineer-in-charge.
Charges for reconditioning the eroded fuel inlet elbows, bends by patch welding if required lifting the new/reconditioned mill inlet elbow, coal pipes, bends and rotating coal pipes from ground floor to various heights (10.5mt to 32mt) and fitting them in correct position if necessary, releasing the boiler corner supports including cost of consumables such as cutting gas, M.S. electrode and T&P.
Charges for loading, transporting and lifting of fuel inlet elbows, bends, coal pipes from stores to work site upto 32mtrs elevation and devolution of wornout fuel inlet elbows, coal pipes and bends from work site to stores, including cost of consumable.
Charges for arresting the existing coal pipes bottom to top at 11m and 13m and 15m & 17m location for providing rigid support and for easy removal of orifices and replacing 1mtr eroded pipe.
Charges for removing wornout sleeve coupling after providing necessary supports in fuel pipe and platform wherever required and fixing new or reconditioned sleeve coupling including cost of consumables and transportation charges.
Cutting of 10mm thick patches of various sizes and prepare the patches to suit the eroded portions of coal bends, inner cone assembly and welding these patches including devolution of scraps to stores as per the direction of the engineer in charge.
Charges for making scaffolding arrangements and loading platform at the bottom of the coal pipe at 14 mtr height at boiler corner 1 to 4 for easy dismantling and assembling the coal pipe. The dismantling scaffolding arrangements supports and loading platform.
Cutting the wornout pipes of varied length, grinding edges and welding with coal pipes collars in the respective area inclusive of cutting the new coal pipe of same length and devolution of scraps to stores. (vertical portion)
DURAI ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .