Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | -35.37% | ₹1.5 L | L1 | Admitted-Finance |
| 2 | L2₹1.6 LAdmitted-Finance | -33.33% | ₹1.6 L | L2 | Admitted-Finance |
| 3 | L3₹1.6 LAdmitted-Finance | -31.11% | ₹1.6 L | L3 | Admitted-Finance |
| 4 | L4₹1.7 LAdmitted-Finance | -27.27% | ₹1.7 L | L4 | Admitted-Finance |
| 5 | L5₹1.7 LAdmitted-Finance | -27.00% | ₹1.7 L | L5 | Admitted-Finance |
Tender Value
₹2.3 L
EMD Value
₹4,680
Closing Date
17 Jun 2026, 5:00 pmClosed
Executive Engineer RNB Division Chadoora
CHADOORA
Construction of Boys Toilet at Boys High School Kuzwera
2026_PWDJK_312068_3
NIT NO 15
Open Tender
Civil Works
15 days
CHADOORA
AS PER NIT
4 documents required · 4 mandatory
₹200
Yes
Executive Engineer RNB Division Chadoora
₹4,680
Yes
24 Jun 2026
10 Jun 2026
18 Jun 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by machanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil : 1 meter from cutting edge | 21.64 | Cum | 256.85 | ₹5,558.23 |
| 2 | Providing & Laying of stone soling (dully hand packed) including watering dressing and ramming with all carriages loading un-loading and etc complete | 1.67 | Cum | 1,000 | ₹1,670 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | Cum | 5,202.9 | ₹5,202.9 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2.43 | Cum | 5,733.6 | ₹13,932.65 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 2.85 | Cum | 9,027.2 | ₹25,727.52 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 3.18 | Cum | 7,571.55 | ₹24,077.53 |
| 7 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.35 | Cum | 7,788.4 | ₹2,725.94 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.82 | cum | 9,821.85 | ₹17,875.77 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Thermo-Mechanically Treated bars of grade Fe-500D or more. | 205.96 | kgs | 123.2 | ₹25,374.27 |
| 10 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Riveted and bolted . Welded | 115.41 | kgs | 138.2 | ₹15,949.66 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_1010239.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid