| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | Rejected-Technical CONTRACTOR VILLUPURAM | - | - | Rejected-Technical BQR conditions A and B not satisfied |
| 3 | Rejected-Technical TIRUNELVELI TAMIL NADU 627001 INDIA UDYAM TN 18 0014241 | TIRUNELVELI | TAMIL NADU | 627001 | - | - | Rejected-Technical BQR condition C not satisfied |
| 4 | Rejected-Technical | - | - | Rejected-Technical BQR conditions A and B not satisfied |
| Sl No | Description | Qty | Unit | K DHINAKARAN L1 |
|---|---|---|---|---|
| 1.00Civil works | ||||
| 1.01 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | 494 | Cum | - |
| 1.02 | Earthwork excavation in SDR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete. | 494 | Cum | - |
| 1.03 | Earthwork excavation in MR and DMR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete. | 494 | Cum | - |
| 1.04 | Hard Rock by wedging cheselling, as per standard specification, etc., complete.. | 990 | Cum | - |
| 2.00 | PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials, , lead, lift, curing, etc., complete. | 124 | Cum | - |
| 3.00 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, litf, etc., complete. But excluding cost of steel reinforcement (by using mixer machine). | 396 | Cum | - |
| 4.00 | RCC 1:1.5:3 using 12 to 20mm HBS metal(machine crushed) for pedestal with formwork including cost of all labour, materials, lead, lift, etc, complete. But excluding cost of steel reinforcement (by using mixer machine). | 146 | Cum | - |
| 5.00 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. | 81,500 | Kg | - |
| 6.00 | Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, curing, etc., complete. | 233 | Sqm | - |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
2 Jun 2020, 2:00 pmClosed
The Chief Engineer,TP-II/Trichy
O/o.The Chief Engineer, Transmission Projects II/Mannarpuram, Trichy.
Providing foundation for 230 KV Yard CA, CB,CC, CD tower and transport , erection of tower with booms for the proposed Nanguneri 230 110 KV SS.
2020_EB_163919_1
CE/TP II/TRY/C-01/20-21
Open Tender
Civil Works
Works
120 days
NANGUNERI
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
₹1.7 L
Yes
1 Sept 2020
16 May 2020
3 Jun 2020
16 May 2020
2 Jun 2020
16 May 2020
Amount
Civil works
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete.
Earthwork excavation in SDR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete.
Earthwork excavation in MR and DMR not requiring blasting.with an initial lead of 10m and lift of 2m etc complete.
Hard Rock by wedging cheselling, as per standard specification, etc., complete..
PCC 1:3:6 mix using 40mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials, , lead, lift, curing, etc., complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, litf, etc., complete. But excluding cost of steel reinforcement (by using mixer machine).
RCC 1:1.5:3 using 12 to 20mm HBS metal(machine crushed) for pedestal with formwork including cost of all labour, materials, lead, lift, etc, complete. But excluding cost of steel reinforcement (by using mixer machine).
Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Plastering with CM. 1:3 mix 12mm thick including cost of materials, labour, lead, lift, curing, etc., complete.
Painting the plastered wall surface with ready mixed plastic emulsion paint of first class quality over a white cement primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete.
Supplying of hot dip Galvanising & fabrication of foundation bolt with various sizes of required length including threadingfor 150mm length withGI plateof size 100x100x12mm at the bottom of bolt 3 nos of relavent sizes GI nuts and flat washers and fixing in the position as directed by the engineer at site including assembling of templete etc cost of template all materials labour lead, lift etc complete .
Assembling of bolt & nut for all equipment structure by using supply of template & transport including cost of template & bolt and all labour lead, lift etc complete .
Removing the excess earth to the nearby bund or low laying area as instructed by field engineer including all lead, lift, etc., complete.
Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete.
Transport and erection of GI tower angles ("CA, CB, CC" & CD type towers), including cost of all T & P's, Hire Charges for Crane, all labour, lead, lift, etc complete as per standard specification and approved drawing .
Painting the tower leg with best quality of anti-corrosive black paint for a height of 1.00m from the top level of coping including cost of paint all labour etc., complete.
Clearing scrub jungles and disposed from the site as per the direction of site engineer including cost of all labour ,lead, liftetc complete .
SGST & CGST (If applicable quote the value, if not enter '0')
IGST (If applicable quote the value, if not enter '0')
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_195995.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .